1 HS2 - the Case Against Chris Stokes. 2 The issues Background Economic benefits The Business Case Environmental impact Technical specification The opportunity.

Slides:



Advertisements
Similar presentations
Eddingtons implications for transport funding Dr Adam Marshall Head of Policy, Centre for Cities National Transport Conference, 16 Oct 07.
Advertisements

Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
Securing a safe, sustainable rail network Michael Roberts Chief Executive.
Hertfordshire County Council Scrutiny 20 May 2010 Gerard Burgess Partnerships Manager London Midland (D) (ii)
1 Delivering Through Partnerships Stephen Rhodes Passenger Services Director EMTA General Meeting 10 th November 2011.
Constructing Mobility Futures: The Case of HS2 Murray Goulden Robert Dingwall 1.
The independent campaign for a better bigger railway.
HS2 and Airports Peter Fry, Public Affairs Manager HS2 Ltd CIC Economic & Policy Forum 17 Feb
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When to invest in High Speed Rail Links and Networks Chris Nash Research Professor
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When is high speed rail economically justified? Chris Nash
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Quiz 1: Rail Transport Case Study, 2013 This quiz requires knowledge of the pre-release case study, the issues that lie behind it, and of the Unit 4b specification.
1Rail Group The Big Question Peter Wilkinson, Director, Rail Franchising.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
HS2 Lobby Day. Please take a seat. Welcome Andrea Leadsom MP.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
Bus and coach transport for greening mobility Contribution to the European Bus and Coach Forum 2011 Huib van Essen, 20 October 2011.
The Great Transport Debate The Rail Network Michael Roberts Chief Executive, ATOC.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
 Aims & Objectives  To reinstate a railway station at Beattock.  To increase tourism in the Beattock & Moffat area  Environmental - access to the.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
HS2 Steve Rodrick Chief Officer. Preferred Route The Misbourne Valley.
Runways – 7 July Paul Harwood
Icelandair Group Jón Karl Ólafsson PRESIDENT & CEO Icelandair Group and the Environment Reykjavik, December 2006 “Góð hugmynd frá Íslandi”
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
 Scotland’s National Transport Strategy A Consultation.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
DEPARTMENT FOR TRANSPORT, LOCAL GOVERNMENT AND THE REGIONS Key Transport Facts: Trend 1: Growth in passenger transport and freight compared with.
Building the Case for Privatization and Deregulation of Urban and Intercity Transportation Systems Clifford Winston The Brookings Institution.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
/18-Feb-161 Response of Surface Access Providers – Network Rail Chris Rowley, Principal Strategic Planner (L&SE)
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
RAIL TRANSPORT. 1.1 BACKGROUND OF RAIL TRANSPORT.
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When to invest in High Speed Rail Chris Nash
Scotland Route Utilisation Strategy. Slide 2 What is a RUS? A blueprint for the future of the route  Provides a series of options that funders may choose.
Meeting the capacity challenge: The case for new lines Iain Coucher Chief Executive, Network Rail.
TfN Freight AND RAIL UPDATE
Alternative ways to address growth
High Speed Rail Some Development Principles
West of England Joint Transport Study
Operational Objectives
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
The Freight RUS - a draft for consultation
David Metz Centre for Transport Studies University College London
Bus and coach transport for greening mobility
Midlands Connect: A Pan Midlands Strategic Transport Partnership
Qualitative Scenarios
Liverpool John Lennon Airport 12 October 2018
East Coast Route Study November 2016 update.
Why build this new link to Heathrow?
KEYNOTE STAGE SPONSOR.
RTPI /TRICS Transport & Development Planning Conference
Great Eastern Mainline
Western Rail Link to Heathrow
Presentation transcript:

1 HS2 - the Case Against Chris Stokes

2 The issues Background Economic benefits The Business Case Environmental impact Technical specification The opportunity cost Demand growth and capacity The alternative

3 Background (1) Britain had been an interested observer of high speed in Japan, France and elswhere Eddington (2006) argued against HSR –Journey times in Britain already good –Better case for incremental improvements, particularly in congested areas 2007 White Paper also rejected HSR Lib. Dems, Conservatives started advocating HSR Lord Adonis appointed Secretary of State – and strongly advocated HSR A Political consensus

4 The political consensus HSR looks good to the politician on the Clapham omnibus Green Capacity Airports Speed Regeneration Everyone else is doing it A sexy, dynamic legacy project!

5 Economic benefits Time savings – standard methodology, but assumes no productive work on trains North-South divide; not supported by serious academics Tendency to benefit the hub (in this case London) Zero sum game in the regions

6 Professor Roger Vickerman (Transport Select Committee 6/9/11): “Obviously, if you feel that something is going to do good for you, you big it up. We saw that with HS1 in Kent as well, as to all the effects it was going to have. I have to say, they are not visible to the naked eye”

7 The Business Case Has deteriorated: Phase 1 BCR has moved from 2.7 (12/09), to 2 (2/11), now 1.7 (8/12), including “Wider Economic Benefits) On normal criteria, excluding WEI, now 1.4 Further downsides: latest OBR forecasts, PDFH 5.0, value of time a BCR of around 1.0 or less DfT categorise 1.0 – 1.5 as “low”, below 1.0 as “poor” Normal pass mark for rail schemes is c2.0

8 Heathrow and HS1 Links Heathrow –Spur to T5 –6,500 journeys daily, but only 14% of these are air passengers. Others for West London and Reading (!) –No quantified case presented: “there is a strong case for trains to run directly to Heathrow” HS1 link –No business case presented –The Economic Case states HS1 connection has been evaluated on the basis of trains terminating at Old Oak Common. –The specification shows no trains to HS1 –But the Decisions paper states “HS2 passengers will be able to travel directly to Heathrow and the Channel Tunnel without having to change trains” and “there is a strong strategic case” for the link to HS1

9 The Financial Case (Phase 1) [Update to the economic case, August 2012] 2011 present value and prices£bn Capital cost18.8 Operating costs8.2 Increase in rail revenue13.2 Cost to the taxpayer13.8

Challenges to the evaluation: Outdated PDFH v 4.1 still used – this significantly overstates long distance demand compared with the approved v5.0 Business case does not include HS1 services – these will reduce frequency to Euston and significantly worsen overall financial performance Unrealistic value of time used for business passengers Pricing not modelled (eg impact of Chiltern Line upgrade) Impact of MML electrification and ECML HLOS improvements not modelled – these reduce incremental benefits of HS2 Journey time savings overstated, particularly on ECML Optimism bias applied to increase “classic” operating cost savings Impact on existing Great Western passengers not modelled Taken together, these will have a major impact, certainly reducing the BCR below

11 Environmental impact At best neutral Small proportion of HS2 passengers forecast from air (3%) and car (8%) 24% generated traffic High speed drives up energy consumption Few slots released at Heathrow, and will certainly be taken up by long haul flights HS2 isn’t Green!

12 Technical specification Real doubts about 18 trains per hour – highest elsewhere is 13/14 Reliability impact of trains from “classic” routes (2 Edinburgh/Glasgow, 2 Newcastle, 2 Liverpool) 350 kph looks over specified – minimal time savings compared with 250/300 kph, but major energy penalty

13 Opportunity Cost So far, Government has maintained/enhanced high levels of investment on the existing network But WCML is not the priority: less overcrowded and with greater scope for longer trains than GWML, GEML, BML, ECML HS2 will inevitably squeeze out other, potentially better major rail projects

Morning peak demand and capacity [Network Rail London and South East Route Utilisation Strategy July 2011] Service group (long distance services into London)Load factor (3 hour morning peak ) Paddington (Main Line and other fast trains)99% Euston (long distance)60% St.Pancras (Midland Main Line)80% St.Pancras (HS1 domestic)41% Kings Cross (ECML long distance)65% Liverpool Street (Great Eastern Main Line)78% Victoria (fast trains via East Croydon)72% Waterloo (South West Main Line)91% 14

15 Demand Growth Static rail volumes for 50 years after World War 2 But strong growth in rail demand over the past 15 years Rail mode share increasing Total transport demand no longer rising with GDP –High fuel prices? –Congestion? –Saturated car ownership? –Alternatives to transport? Suggest we need to understand what’s happening before committing £33 billion!

16

17 Domestic Air Traffic (1)

18 Domestic Air traffic (2)

19 Domestic Air traffic (3) Forecasting until 2086?

Is business travel declining? (1) Virgin Rail have stated growth is concentrated on off-peak and at weekends Euston evening peak load factors for Virgin only 56% –HS2AA counts November 2011 – before any 11 car sets introduced –DfT refuse to release count data because of “commercial confidentiality” “25% decline in business flights since 2000” (Health Protection Agency report) Lloyds Bank : –“Increased volume of teleconferences by 73% in 2010, to 1.9 million” –“Reduced journeys by 143,000” 20

Is business travel declining? (2) Anecdotal evidence: 0820 Euston – Manchester (Loading from Milton Keynes) 21

22 The Eurostar experience (1)

23 Eurostar – DfT explanation “Demand and forecasting for HS1 was particularly challenging as it provided a completely new international service, meaning there was less evidence on which to base passenger numbers” “In addition services began at around the same time as changes in the aviation sector…this meant that HS1 services were unexpectedly competing with…low cost airlines” [Review of the Government’s strategy for a National High Speed Rail Network (January 2012) para ]

24 A cautious hypotheses on rail growth…. WCML growth driven by step change following completion of the upgrade –parallel with 1960s electrification One-off modal shift, especially from air to rail in Manchester – London market Significant growth in off-peak and weekend travel Business market becoming saturated? High mode share to central London – so future growth dependent on growth in total travel demand, not mode shift ?

25 Euston peak loadings HS2 Action Alliance carried out independently audited evening peak counts at Euston in November 2011 (DfT have declined FOI requests) [Note – counts carried out before any 11 car sets introduced] Peak trains (1630 – 1843)Average load factor Manchester (7 trains)44% Liverpool (4 trains)42% West Midlands (7 trains) including MK passengers 72% West Midlands (7 trains) excluding MK passengers 66% Preston/Glasgow (6 trains)63% Chester/North Wales (2 trains)50% All peak trains56%

Recent Virgin West Coast business results Passenger mile growth [Stagecoach Annual report] –2009/ % –2010/ % –2011/ % Revenue growth for 12 weeks to 22 nd July % [Stagecoach interim results] –implies a drop in volume or a major decline in yield East Coast revenue growth 2011/12 – 2.8% [DOR report and accounts] 26

In summary, there is strong evidence to challenge the “capacity” case for HS2 Existing WCML services have lower load factors than other long distance routes from London even before the majority of trains are lengthened to 11 cars There is emerging evidence that growth on WCML is sharply declining now the benefits of the 2008 upgrade have been captured There are real questions about future demand for business travel 27

28 …and there are alternatives which increase capacity on the existing route Start with a logical assessment of options to increase capacity/reduce overcrowding: Rolling stock reconfiguration, for example conversion of some first class vehicles to standard class More effective demand management, including use when appropriate of obligatory reservations Operation of longer trains, to the extent that this is possible without major infrastructure expenditure Targeted infrastructure investment to clear selected bottlenecks to enable frequencies to be increased Construction of new infrastructure (HS2) Not “HS2’s the answer; what’s the question?”

29 51m Alternative (1) Reconfigure one first class to standard Longer trains – 12 car except for Liverpool (stays 11 car because of constraints at Lime Street) Seats per set change from 145/294 to 94/594 (Standard class increase of 102%) Grade separate Ledburn Junction and introduce IEP or equivalent for Milton Keynes/Northampton fasts: peak commuter capacity from 2 to 4 tph (before 2026!) Second down track between Brinklow and Attleborough Stafford by-pass

30 51m Alternative - Outputs 12 InterCity trains an hour in peak hours Doubled peak capacity to Milton Keynes and Northampton Overall increase of 215% in InterCity capacity compared with HS2 “base” Segregation of InterCity/freight operation throughout from Euston to Crewe 10% of the capital cost of HS2 Can be delivered flexibly and quickly as and when needed – in contrast HS2 is an “all or nothing” solution, with no benefits until 2026

31 West Midlands capacity

32 51m Alternative Business case results – BCR of 6.06 including WEI, 5.17 without (“High Speed Rail Strategic Alternatives Study”, Atkins for DfT, January 2012) Network Rail review (November 2011) used by DfT to seek to dismiss 51m alternative, but: –No fundamental flaws – timetable “broadly acceptable” and “timings…seem appropriate” –No like for like comparison with HS2 – concern about 51m alleged disruption impact on Euston, but ignored 8 year total reconstruction for HS2 –51m capacity implicitly accepted for intercity services, but claimed inadequate for outer suburban routes – again, no acknowledgement that HS2 provides no additional commuter capacity until 2026

33 Conclusion No case has been made for HS2 on economic, financial or capacity grounds The 51m alternative should be objectively evaluated before any decision is taken to take HS2 forward