PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.

Slides:



Advertisements
Similar presentations
MASBO February Information to purchase Services Information to purchase Construction.
Advertisements

Project Procurement Management
Project Procurement & Contract Administration Jiwei Ma
Procurement Procedure and Preparation of Procurement Plan
TurnKey Project Management Services Capabilities Briefing.
INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
Procurement: What Everyone Needs to Know. What is Procurement? “The act of obtaining something”
PROCURING LOCALLY GROWN PRODUCE. Why Choose Locally Grown  Freshness  Holds longer in storage  Shipping costs may be lower  It can help your community.
Copyright Course Technology Chapter 11: Project Procurement Management.
Project Procurement Management
Procurement Procedure and Preparation of Procurement Plan 26 th Review Meeting of State FCs- Chandigarh (6 August 2010)
Chapter 12: Project Procurement Management
© 2004, David Gadish, Ph.D.1 Project Management CIS 486 Fall 2005 Week 9 Lecture Dr. David Gadish.
1 CDBG Procurement Requirements For Local Officials.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Welcome to Everybody to Group presentation. Group members Group members Dr. Mohd. Abdus Salam, Deputy Project Director (Deputy Secretary), Bangladesh.
1 Statutory Auditors Observations on Procurement th Review Meeting of State FCs- Delhi (15-16 July, 2013) Annexure W.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Key questions answered in this chapter:  What are the four stages to the evolution of B2B capabilities?  What are the three categories of B2B?  Describe.
Logistics.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
Overall Considerations
How the United Nations does Business Procurement Orientation in China 19 September 2003 Procurement Division United Nations Loida Madrigal.
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
From Research Prototype to Production
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
Projects and procurement (lecture). Procurement Acquiring hardware, software, materials, services, spare parts, skills, workforce etc. which are necessary.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
Procurement Procedure and Preparation of Procurement Plan 27 th Review Meeting of State FCs- Bhubaneswar (28 th -30 th October, 2010)
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
Key Observations of the Post Review of Procurement carried out by Development Partners and TSG Consultants 24 th Review Meeting of State FCs- Delhi (3.
TSUNAMI RELIEF PROGRAM KICK OFF MEETING. INTRODUCTION WHAT IS PROCUREMENT? WHY IS UNDERSTANDING PROCUREMENT SO IMPORTANTS? WHAT ARE THE BASIC PRINCIPLES.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Copyright 2009  Understand the importance of project procurement management and the increasing use of outsourcing for information technology projects.
Inventory Services The University of Texas at Austin.
Chapter 11: Project Procurement Management
What Small Method Is It? Presented by Jan Giffin, CPPO, CPPB, VCO eVA Business Manager And Katherine Bosdell, CPPB, VCO Statewide Contract Officer.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
1 AUDIT OBSERVATIONS on ACCOUNTING AND PROCUREMENT th Review Meeting of State FCs- Udaipur (28-29 October, 2013)
KENYA NATIONAL BUREAU OF STATISTICS
Office of Procurement Services.  Vendor Application Website: 
Compliance to Tender Procedure Notification Issue of Tender Documents Submission of Tender Documents Public opening of Tender Documents Evaluation Selection.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
© Cengage Learning – Purchasing & Supply Chain Management 4 ed ( ) Analysis 3. The purchasing process: the buyer’s role.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Copyright 2014  Procurement means acquiring goods and/or services from an outside source  Other terms include purchasing and outsourcing Information.
Project Management – PTM712S
“How To Do Business” with Atlanta Public Schools
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Call for competition process
Quality Management Systems – Requirements
Chapter 12: Project Procurement Management
Projects and procurement
Lecture 10 PROCUREMENT Ferdinand FASSA.
Management Verifications & Sampling Methods
Procurement Planning Mani Ram Gelal
Projects and procurement
Project Procurement Management
Presentation transcript:

PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement Plan needs to be complete in all respects taking into account the outlay approved by the PAB for each activity. Various methods of Procurement prescribed in the Manual to be followed during the year need to be indicated in the plan. Civil Works either through community or through contractors have also to be provided in the plan. The complete stages for each contract have to be indicated in the plan by the States. A Model Procurement Plan is given below

Annual Procurement Plan The meeting of the PAB for consideration of AWP&B for 2014-15 is over and PAB Minutes has been. uploaded and issued States are requested to o prepare the Annual Procurement Plan for 2014-15 immediately on receipt of the Minutes. And upload them by 15/6/2014

PROCUREMENT PLAN Six Stages are prescribed for Goods and nine stages for Civil Works GOODS Preparation of specifications and bids document. Issue of Invitation to bid. Open bids Evaluation Award Contracts Delivery CIVIL WORKS Evaluation of bids Award of contracts Construction 25% complete Construction 50% complete Construction 75% complete Construction 100% complete

PROCUREMENT PLAN Process . PROCUREMENT PLAN Process The flowchart below shows each of the stages in the procurement process

PROCUREMENT PLAN KEY TAKEAWAYS The procurement plan includes determining the category of materials or services, choosing the type of contractual relationship, soliciting bids, selecting bidders, managing the work, and closing the contracts. The decisions made when selecting the type of contract are based on whether the materials can be provided by suppliers, vendors, or partners; how well defined the work is; how the risk will be shared; the importance of the task to the schedule; and the need for certainty of the cost. Companies that bid on contracts are evaluated on past performance and current financial status. RFQs and RFPs are sent to those companies. RFQs are evaluated on price and RFPs are evaluated on price and method. Long lead time items are identified and monitored. Items that are critical to the schedule or delayed are assigned to an expediter. The logistics of handling delivery, storage, and transportation are determined. Work and materials are inspected for quality.

Procurement Audit (WB) Following procurement reviews/audit will be conducted for the project: The CA firms to be utilized to audit the accounts of SIS, including reviewing procurement procedures being used. The FMP Manual requires the recruitment of internal auditors at SIS, who will also be responsible for internal procurement audit. The Comptroller and Auditor General (CAG) of India also conduct the procurement audit (as part of the financial audit) of MHRD. MHRD to conduct concurrent review of SIS.

Procurement supervision All aspects of Elementary Education III including procurement shall be reviewed during Joint Review Missions which will be arranged twice a year. Post Procurement Review All contracts issued under Elementary Education III will be subject to post review on a sample basis annually. These reviews are meant to ensure that the agreed procurement procedures are being followed. Considering the large number of institutions involved, Post review of contracts will be conducted in a few selected states annually in consultation with MHRD in order to cover all states within a four year cycle.

PROCUREMENT PLAN Procurement Software An online Procurement software to monitor procurements worth Rs. 10 lakh and more has been hosted sometime back on a dedicated website (www.rte-ssaprocurement.com). The site is being maintained and hosted through an Internet Service Provider, KITINFINET.

Procurement Thresholds (WB) Thresholds for various Methods of Procurement Category Method of Procurement Threshold (US$ Equivalent) Works Open Tender Up to 500,000 (Up to 800,000 only for SIEMAT buildings) Limited Tender Up to 75,000 Single Tender Procurement through Communities Goods except IT Equipment and Textbooks (1) (also applicable for non-intellectual services and the services contracted on the basis of performance of measurable physical outputs) Up to 500,000 Up to 50,000 Goods (only Textbooks) (2) Up to 2,000,000 Up to 1,000,000 Goods (only IT Equipment) Up to 3,000,000 Up to 30,000 Consultants’ Services As per FMP Manual Up to 300,000 [1]All goods of lesser than US$ 1000 in value could be acquired without quotation [2] Single Tender procedure will be used in the states which have textbook corporations. In case of other states, Open Tender procedure will be used to purchase the textbooks or get these printed.

PROCUREMENT ISSUES AREAS OF CONCERN Procurement procedures not being followed Non-Use of CAD Maintenance and Non-Production of Records Procurement without quotation