GLAST LAT ProjectGASU TRR, July, 2005 4.1.7 DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650) 926-4257.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTEM/TPS TRR, Jan 7, DAQ & FSWV3 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectPDU/GASU MRR, February 4, DAQ & FSWV3 1 GLAST Large Area Telescope: B. Estey, G. Haller, D. Marsh SLAC
GLAST LAT ProjectPDU TRR, July, DAQ & FSWV4 1 GLAST Large Area Telescope: Presented by P. Young SLAC (650)
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
Integration and Test Organization Chart
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650) Gamma-ray Large Area Space Telescope GASU TRR

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 2 Contents Introduction –Overview –Significant Changes since CDR –Objectives –Status Requirements/Verification EGSE and Test-Procedures Verification Test Plan and Flow –At Assembly Vendor Test-plan and Flow Facility Man-Power Quality Assurance Vibration –At SLAC Test-plan and Flow Thermal Vacuum Test Mass Property EMI/EMC (at sub-contractor) Man-Power Quality Assurance Equipment Calibration/Safety Risk Assessment Schedule Status of Procedures Issues and Concerns

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 3 LAT Electronics 3 Event-Processor Units (EPU) (2 + 1 spare) –Event processing CPU –LAT Communication Board –SIB Spacecraft Interface Units (SIU)* –Storage Interface Board (SIB): Spacecraft interface, control & telemetry –LAT control CPU –LAT Communication Board (LCB): LAT command and data interface 16 Tower Electronics Modules & Tower Power Supplies * Primary & Secondary Units shown in one chassis Power-Distribution Unit (PDU)* –Spacecraft interface, power –LAT power distribution –LAT health monitoring Global-Trigger/ACD-EM/Signal-Distribution Unit* (GASU) TKR CAL TKR Front-End Electronics (MCM) ACD Front-End Electronics (FREE) CAL Front-End Electronics (AFEE)

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 4 EGSE GASU Mounted on LAT GASU PDU

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 5 Flight GASU Primary and Redundant GASU DAQ Module in same enclosure, separated by metal To follow

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 6 Boards in Flight GASU Enclosure contains primary and redundant GASU Power- Supply Boards and DAQ Boards GASU PS Board GASU DAQ Board

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 7 One enclosure houses primary and redundant GASU Power-Supply and GASU DAQ Circuit Card Assemblies –Separated by aluminum wall GASU Power Supply –Receives 28-V supply voltages for Primary and redundant DAQ board, –Generates 3.3V and 2.5v ACD FREE cards –Filtering for 28-V –3.3V regulation GASU DAQ Board –Contains 9 FPGA’s –Includes Command Response Unit, fan-out and fan-in of commanding to 16 TEMs, PDU, EPU’s, ACD –Includes Global Trigger Logic –Includes LAT Event-Builder Logic –Includes command/control/read-back for ACD sub-system –Includes power-control for ACD FREE Boards GASU Module

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 8 Changes since LAT CDR Code in 9 FPGA’s were modified/finalized and bugs fixed ACD power-on low-frequency system clock selection added ACD power circuits replaced with circuit to protect for over- current and updated ICD interface voltage/current requirements Some resistor/capacitor values have changed to optimize monitoring ranges

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 9 Objectives Demonstrate that hardware, software, procedures, and support equipment are prepared to support system environmental test Demonstrate that planned and completed testing meets performance and interface requirements Identify and understand all the risks and limitations TRR is not intended to –Review GASU design –Review flight readiness –Buy-off hardware or software RFA’s should only be of sufficient concern to stop test –Prior to start of an given test, any applicable TRR RFAs must be closed

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 10 Test Entrance / Exit Criteria Entrance –All required paperwork released and in place Procedures, drawings, etc –Test configuration verified and approved –Essential personnel in place –Pre-test GASU functional successfully passed Exit –As-run procedures completed –Correct and accurate application of test environment –Test data acquired and archived –No damage to GASU –GASU performance within specification limits –Post-test GASU functional successful

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 11 Status First GASU (to be proto-flight tested) –Assembled –Pre-conformal coat GASU with enclosure-internal EGSE harness tested, tests to verify that ACTEL performs over temperature performed (was prerequisite to programming FPGA’s for second GASU box) –Conformal coated, integrated in enclosure with flight harness –Final GASUto be delivered to SLAC week of Oct 3, 2005 Second GASU (to be flight acceptance tested) –Will be spare or primary flight GASU, depending on schedule –Board went thru reflow surface-mount assembly step –ACTEL FPGA’s were programmed and are being assembled on boards –Remaining are staking, integration of boards into enclosure, integration of EGSE harness, testing at SLAC, conformal coating, integration of flight harness, testing

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 12 Tests To-Date GASU engineering modules were extensively tested –As EGSE in DAQ/I&T Testbed includes GASU for > 1 year I&T uses EGSE GASU during integration of towers in LAT for several months Main difference to flight GASU: ACD power-switch circuit and monitoring was modified –Two flight boards of each type were assembled with mostly flight parts and tested in one enclosure –Additional GASU tests Informal thermal test -40C to 55C Informal EMI test on EGSE station sent to Lockheed for thermal test

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 13 Requirements LAT-SS Specifications, Level 4 LAT Dataflow System LAT-SS Specifications, Level 3 T&DF Subsystem Specification LAT-SS Specifications, Level 3 Power Supply System LAT-SS Specifications, Level 4 Power Supply System LAT-SS Specifications, Level 5 GASU Specification ( to be released) LAT-TD LAT Inter-Module Communications LAT-TD-0xxxx GASU ICD Specification & Conceptual Design (needs to be updated) LAT-TD AEM, Programming ICD LAT-TD GEM, Programming ICD LAT-TD EBM, Programming ICD LAT-TD CRU, Programming ICD LAT-SS LAT Environmental Specification LAT-SS GASU lists requirements LAT-TD contains Verification Matrix which gives approach to verify each requirement –Lists verification method used

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 14 System Performance Level 3 and level 4 DAQ and TRG and power-system requirements are met with a combination of DAQ modules (TEM/TPS, GASU, SIU, PDU, etc), since the DAQ and trigger and power system is comprised of several sub-system module types –Level 5 GASU requirements which are verified are derived from Level 3 and Level 4 DAQ and Trigger and Power system specifications (as noted in the L5 requirements doc) –Level 5 requirement doc includes derived requirement addressing Functionality/performance Power Mass/C.G. EMI/EMC Environmental incl temperature and vibration

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 15 Verification Status Engineering Module GASU –EM completed full functional test program with exception of thermal-vacuum, EMI/EMC, mass, and C.G. –Demonstrated compliance with specifications

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 16 EGSE and Test-Procedures EGSE for Functional/Performance Tests –Test-Stand documented in LAT-DS Test-Procedures –LAT-TD Electrical Interface Continuity and Isolation Test procedure and LAT-TD Automated Electrical Interface Continuity and Isolation Test procedure Power-off impedance tests of I/O –LAT-TD Stray-Voltage-Test Procedure Power-on voltage test of I/O –LAT-TD Comprehensive Test Procedure Functionality and Performance test (not signed of as of Sept 30, 05)

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 17 Test-Configuration LAT-TD shows several test-configurations, below the AEM functionality test configuration is shown

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 18 Verification Level – Module Detail Breakout of verification at GASU Module Level Tests to be conducted after successful TRR (order may change depending on availability of resourced (TV/EMI) EICIT & SVT Functional test Vibration (Wyle) Functional test Thermal cycle Functional test Mass properties including CG Thermal vacuum (in-situ testing) EMI/EMC (at CKC-lab for proto-flight, at SLAC for flight acceptance) Functional test Review Deliver to I&T –DAQ (out-going) / I&T (incoming) test combined

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 19 Verification Test-Stand –Supplied by SLAC –Operated by SLAC engineers Vibration facility at Wyle –LAT-TD Vibration test-procedure –SLAC engineers present for vibration tests Thermal Cycle in thermal chamber in SLAC clean-room

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 20 TC and Vibration Requirements Figure 1. Vibration Levels, Duration, and Spectra

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 21 Mass Property Mass properties checked at SLAC –Procedure LAT-TD (performed at SLAC Metrology) –Expected: (ref LAT-TD-00564) Total 13.9 kg Allocation 12% above = 16.7 kg –C.G. to be measured for the proto-flight unit only

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 22 Thermal Vacuum Test Thermal Vacuum facility in Building 33 at SLAC –Thermal Vacuum Chamber Operating Procedure LAT-TD –GASU Thermal Vacuum Test-Procedure LAT-TD (not released as of ) –First GASU tested to proto-flight specifications (same Temperatures as qualification, but 4 TV cycles versus 12 cycles)

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 23 Proto-Flight and Flight Acceptance Thermal Vacuum Test See GASU Thermal Vacuum Test-Procedure LAT-TD At < 10-5 Torr X 4

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 24 EMI/EMC Test Proto-Flight = Qualification Test (Conductive & Radiative) –Sub-contracted to CK Labs –Statement of Work: LAT-PS CE102, CECN, CS102, CSCM, CS06, RE101, RE102, RS101, RS103 –Detailed EMI/EMC procedure provided by CKC lab (to be provided) –SLAC engineers present at vendor for tests –Vendor supplies test-report –LAT QA at SLAC present for tests Flight Acceptance Test (Conductive) –Performed at SLAC –LAT-TD Only CE102, CS102 –SLAC supplies test-report –LAT QA at SLAC present for tests

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 25 Manpower & Quality Assurance Test man-power –GASU: L. Sapozhnikov/ J. Thayer –Test Support: J. Ludvik –Thermal Cycle and TV support: R. Williams, P. Hart –TV shift support: 2 contractors –EMI support: D. Nelson –Vibration support: D. Tarkington Quality assurance: Joe Cullinan –QA representative (Y.C. Liew) present during tests, review of test-procedure and results –Required changes to documentation are red-lined and included in new revisions –NCR are created for non-conformance (e.g. exceeding of min/max test limits) and submitted for disposition

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 26 Problem Failure Report/ Configuration Management Problem Failure Reporting –Via standard SLAC LAT Non-Conformance Reporting (NCR) System NCR is entered Reviewed/accepted/resolved –LAT engineering –LAT QC Already exercised during pre-conformal coat GASU assembly Configuration Management –Via standard LATDOC system

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 27 Planned Tests Function/Performance Tests (LAT-TD-01717) –Verifies all requirements in LAT-SS except below Thermal Vacuum Tests –Verifies performance/function over temperature Mass/C.G. –Verifies/measures mass and C.G. Vibrations test –Verifies vibration performance requirements EMI/EMC –Verifies EMI/EMC performance Note to margin testing –External Voltage margin testing is performed at all stages (28V +/-1V) –Internal Voltage margin testing (3.3V/2.5V) is only performed at pre- conformal coat stage while using internal EGSE harness –No internal voltage margin testing once flight harness is used. Respective tests in TD are omitted at that stage as will be documented in work- order –Frequency margin tested pre-conformal coat as well as on final GASU –Temperature testing performed during TV testing

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 28 Equipment Calibration EMI/EMC Test Equipment –Quantitative measurement equipment (sensors, antennas, etc) calibrated to NIST standards –Calibration performed annually All item are (will be) within calibration at time of testing Vibration Test Equipment –Accelerometers calibrated against a standard accelerometer traceable to NIST –Signal conditioners calibrated annually TVAC Equipment –Thermocouples calibrated against standard temperature; calibrated prior to test –Thermocouple reader calibrated very 2 years

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 29 Sub-System Safety EGSE –Safe-to-mate –Configuration control –Calibration verification –Functionality verification with “golden” EGSE GASU prior to test with flight hardware MGSE –No custom MGSE Environment –Temperature controlled in all test-facilities –Cleanliness actively controlled in clean-room; hardware bagged and purged when required Training –ESD training completed –Clean room training completed

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 30 Risk Assessment Schedule –Pressure to deliver flight hardware could force less than complete characterization and analysis of modules, could result in replicating a problem in the second module Performance –None known

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 31 Test-Schedule Estimated as follows, order subject to EMI/TV availability First GASU –10/5: functional test –10/13: TC –10/14: functional test –10/17: vibration test –10/18: functional test –10/24: TV start –10/31: TV end –11/1: mass, c.g. property –11/2: EMI start –11/16: EMI end 2 nd GASU –Lags first GASU by about 8 weeks

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 32 Status of Main Test Procedures All procedures must be released before respective test Procedures to be released –EMI vendor procedure to be released –CPT and TV modified, revisions are in review

GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 33 Issue & Concerns Schedule –Tight Vibration test –Concern that harness/connectors pass vibration tests (should be ok, but is concern)