Ultra Thin Continuously Reinforced Concrete - Modelling &Testing under APT Louw Kannemeyer (SANRAL) Bryan Perrie (C&CI) Pieter Strauss (Consultant) Louw.

Slides:



Advertisements
Similar presentations
1 Fundamentals and Application of Stress Ratio in Concrete Pavement Design Edward H. Guo Consultant April , 2012 FAA Working Group Meeting.
Advertisements

Concrete Test Section RPF 8 May Objectives Design details Material properties Instrumentation Traffic Construction Conclusion Outline.
Deterioration of Concrete Roads
Aspects of Current MLS APT Activities in southern Africa Fred Hugo Road Pavement Forum 7 November 2006.
Design of Slabs-on-Grade
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
HMA permanent deformation study: Progress report to the RPF 7 May 2008 Erik Denneman.
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Materials used for pipes: Sewers are made from: 1- Concrete 2- Reinforced concrete 3- Vitrified clay 4- Asbestos cement 5- Cast iron (lined with cement).
Updated mechanistic design method for rigid pavements cncPave.
In Tai Kim & Erol Tutumluer University of Illinois, Urbana-Champaign
Concrete and Concrete Pavements Research Group. Meet the research team… 3 PhD Students 4 MS Students 1 Undergrad.
California Asphalt Rubber Case Studies – Reduced Thickness Jack Van Kirk Basic Resources.
Pavement Analysis and Design
University of Minho School of Engineering Territory, Environment and Construction Centre (C-TAC) Uma Escola a Reinventar o Futuro – Semana da Escola de.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Concrete Condensed1 Cement Production, Composition & Types.
SANRAL Overload Damage Quantification Louw Kannemeyer.
1 NDT OF CONCRETE. 2 CUBE TEST INDICATES ONLY POTENTIAL STRENGTH INDICATES ONLY POTENTIAL STRENGTH SUBJECT TO UNINTENTIONAL DEVIATIONS SUBJECT TO UNINTENTIONAL.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Bituminous Stabilized Materials Guideline Project Initiated By: Gautrans Sabita.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
Venue and dates Sheraton Colorado Springs Hotel, Colorado Springs, Colorado August 2005 Organised by ISCP Sponsors include: FHA, ACPA, CAC AASHTO,
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Pavement Maintenance II
Course No: CE 4000 INVESTIGATION ON THE PERFORMANCE OF BAMBOO REINFORCED CONCRETE BEAMS Supervised By: MUHAMMAD HARUNUR RASHID Presented By: MOHAMMAD TAREQ.
EWHA WOMANS UNIVERSITY ARCHITECTURAL STRUCTURE LABORATORY Investigation of Rehabilitation Effects on Fire Damaged High Strength Concrete Beams Eun Mi Ryu.
Extending Asphalt Pavement Life Using Thin Whitetopping Mustaque Hossain, Ph.D., P.E. Department of Civil Engineering Kansas State University.
Kim Jenkins SANRAL Chair in Pavement Eng
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
Silver Oak College Of Engineering & Technology.
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
Progress in Concrete Technology
In Situ Stabilization of Pavement Base Courses Roads Pavement Forum Thursday, May 17, 2001.
AAPA 2011 Pre-CAPSA’11 Study Tour - Topic Brief Introduction of Australian Pavement Design.
Design of Concrete Structure I Dr. Ali Tayeh First Semester 2009 Dr. Ali Tayeh First Semester 2009.
G AUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS 1 GAUTRANS APT ELZBIETA SADZIK MAY 2002.
Status of the first experiment at the PaveLab Fabricio Leiva-Villacorta, PhD Jose Aguiar-Moya, PhD Luis Loria-Salazar, PhD August 31 st, 2015.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Pavement Types Dr. TALEB M. Al-ROUSAN.
The application of locally developed pavement temperature prediction algorithms in Performance Grade (PG) binder selection Prepared for SATC 2007 By Erik.
Asphalt Concrete Mix Design
(THIN CONCRETE PAVEMENTS)
NINTH ROAD PAVEMENT FORUM 11 May 2005 DEVELOPMENT OF NATIONAL GUIDELINE ON ASPHALT REINFORCEMENT.
CSIR RPRAC WORKING GROUP: THIN-LAYER CONCRETE RPF, 23 November 2005.
Reinforcement Information - Code
Surface Treatments #2.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
5. FERROCEMENT.
At Auburn University National Center for Asphalt Technology Accelerated Pavement Testing Facilities “APT”
Structural Slab Analysis
Concrete Repair.
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
CIVI 6061-Strengthening of bridges using FRP
Concrete Bridge Decks Large Percentage of All Bridge Decks (over 90%)
Rongzong Wu, David Jones and John T. Harvey
Multi-Year Programming and Predictive Modelling
Phase I Experiment 4 Different pavement structures, 8 sections Compare
Update on the current APT Project in Texas
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
UTILITY VAULTS: THE PRECAST ADVANTAGE
PAVEMENTS CEE 320 Steve Muench.
Introduction to Pavement Design
ASSESSEMENT AND REHABILITATION OF STRUCTURES
Factors Affecting Pavement Design
Pavement Structural Analysis
Pavement Overlay Design
OLD CONCRETE MAKES WAY FOR NEW ASPHALT A Laatz, N Cocks, N Burger
Presentation transcript:

Ultra Thin Continuously Reinforced Concrete - Modelling &Testing under APT Louw Kannemeyer (SANRAL) Bryan Perrie (C&CI) Pieter Strauss (Consultant) Louw du Plessis (CSIR)

34 % Less Than 5 Years

u Problems u Ageing Network – Strengthening Requirement u Environmental Legislation – Materials Availability u Traffic – Increased Growth, Increased % Heavy, Increased Tire Pressures u Solutions u Increased Budgets u Innovative Pavement Repair Strategies u Must be able to be applied to an existing road surface with minimal preparation works required to the existing road surface or structures (in other words an Inlay or Thin Overlay); u Must be able to be constructed with road construction equipment generally available in South Africa; u Must be able to be opened to traffic within 48 hours; u Must have structural life expectancy in excess of 30 years with minimal maintenance requirements during this period; u Must be able to successfully withstand increased axle loads and tyre pressures of modern heavy vehicles; u Must be able to meet all functional requirements to ensure a safe road surface under all conditions; u Must enhance utilisation of materials and labour, and u Must be cost affective. RSA Primary Network Summary

Potential Innovative Solution u Ultra Thin Continuously Reinforced Concrete Pavement u 20 to 60 mm Layer Thickness u 50 x 50 mm (Ø5mm to Ø8mm) Welded Mesh u 4.5% versus 0.6% Steel for Traditional CRCP u Ultra High Strength Cement (UHSC) Paste u WC Ratio = u Steel- and polypropylene fibres.

u Short Term Pavement Performance (STPP) u APT (HVS) Test Sections at Heidelberg TCC u Long Term Pavement Performance (LTPP) u Actual Traffic on Heidelberg TCC Screener Lane UTCRCP Testing

UTCRCP - HVS UTCRCP - HVS Sections Layout u 60 m HVS426A5 HVS429A5 HVS427A5 HVS428A5 3.7 m 1.0mm (40 kN) Surface Deflection Before Overlay HVS430A5 HVS431A5 u 3.7 m 0.3mm (40 kN)0.6mm (40 kN) 20 mm AC 150 mm G7 (CBR = 15 %) 40 mm UTCRCP 20 mm AC 150 mm G7 150 mm C4 40 mm UTCRCP

UTCRCP - Construction

UTCRCP - UTCRCP - Max Deflection (40kN)

UTCRCP APT - UTCRCP APT - Instrumentation

UTCRCP - APT Testing

UTCRCP – Sections at Failure

UTCRCP – HVS Repetitions u Tire Pressure = 800 kPa (Truck), 1400 kPa (Aircraft) u Speed = 9.0 km/h, u Load Application = Canalized bi-directional u Aircraft Wheel Used for wheel loads above 100kN u Shaded Areas = Surface Water Added Continuously

UTCRCP – APT Test Conclusions u Cement Type: CEM I products had performance differences of up to 50 % - worst was used for the UTCRCP APT Test; u Layer Placement: The use of Asphalt paver required very low slump, and with high steel mesh content - steel was not completely covered by the cement paste; u Steel Fibre Type: The drawn wire steel fibres used - incorrect in terms of length and shape, and Steel Bar Spacers: 10mm diameter steel bar spacers on top of the AC layer to support the asphalt paver, acted as crack inducers.

UTCRCP – Finite Element Model u FE Model developed to predict APT observations u FE Model Then used to investigate: u Amount & Position of steel mesh; u Thickness & Stiffness of UTCRCP layer; u Bond & Impact of Void; u Substructure Stiffness u Load Speed

UTCRCP – Conclusions “to date” u Different chemical reaction between additives and different CEMI cements used; u Do not use “spacer bars” or asphalt paver for placement; u Debonding between UTCRCP and support layers a reality in presence of water – increase in stress; u Curling and presence of anchors did not have a major impact; u Steel fibre length and shape do impact performance – optimum 30 mm x 0.5mm hook end fibre; u UTCRCP Thickness and presence of crack/joint is critical to performance – optimum mm; u Relative position of steel not crucial, closer to top better for reducing compressive stress in crack or joint – lower spalling and water access risk; u Amount of steel not that crucial according to FE model, but lab test indicate optimum to be - Ø 50x50mm – current HVS tests in progress to verify this.

UTCRCP Future u Reconstructed APT Test Section 1 u Different Steel Mesh (max Ø 50x50mm), Steel Fibre and Concrete Mix Options u Placed by Hand u HVS testing currently in progress u Postulated Alternative u Introduce as postulated alternative on projects – Jan 2007

New test sections

UTCRCP HVS testing Phase II Update u First Test (Danish mix design) finished u Contec-APS binder u 50 x 50 mm steel mesh, Y 5.6 mm u Test lasted reps at mostly 80kN u (Roughly 30 mil E80s – using 4.5 power factor)

UTCRCP HVS testing Phase II Update u Second Test (SA mix design # 3) just started u 80kg/m 3 steel fibers mix (UP designed binder) u 50 x 50 mm steel mesh u R 4 mm steel wire

Field mix: Compressive strengths

Field mix: Flexural Beam strengths

Thank You