Visit of the Slovenian Railways March 14 th 2006 How to operationalise kpi’s By Jan Swier, ProRail, The Netherlands, tel. +31 30 235 5315,

Slides:



Advertisements
Similar presentations
Information Systems Systems Development Chapter 6.
Advertisements

Cert IV in PGA Your Class this Semester.  Implement Operational Plan (BSBMGT402A ) This is the Unit that we will cover:
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
Designing and Developing Decision Support Systems Chapter 4.
A CONSTRUCTION SAFETY COMPETENCY FRAMEWORK: DEVELOPMENT, INDUSTRY APPLICATION, AND FUTURE BENEFITS Herbert Biggs PhD.
Implementation: SLA & SOP Processes Purpose Strategy Foundation We Deliver Competitive Advantage to our Customer's Global Supply Chain.
SIEP HSE Management System
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
SMALL BUSINESS PLAN GUIDE
Managing the Performance of Homecare Medicines Services Jane Kelly, Procurement Project Pharmacist Mick Butterfield, Specialist Technician: Homecare Medicines.
Slide n°1 LIFE09 Kick- off meeting 13 January 2011, Warsaw COMMON PROVISIONS : 1. TECHNICAL ASPECTS Izabela Madalinska, Technical Desk Officer, LIFE Unit,
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 2b The concession model; the instruments in the relationship By.
The ISO 9002 Quality Assurance Management System
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
ATC/EMSA/F2 Research&InnovationVertimar Vigo - Spain 1 EMSA: Its role in preventing accidental marine pollution and improving response systems Ana.
OPERATIONS MANAGEMENT for MBAs Fourth Edition
1 Practical use of six-sigma for the IATA Fuel Program Tom Fodor Assistant Director E&M.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Monitoring Contractor Performance – Maintenance Services Aldo Gangi Manager Maintenance & Minor Works 11 th July 2013.
By Jan Swier and Ted Slump, ProRail, The Netherlands
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
Visit of the Slovenian Railways March 14 th 2006 Content Maintenance contract and input versus output By Jan Swier, ProRail, The Netherlands, tel. +31.
The BIM Project Execution Planning Procedure
Leen Vooijs Implementing risk based maintenance concepts.
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 1b The establishment and development of ProRail By Jan Swier, ProRail,
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 3 Output management: essential Instruments within ProRail By Jan.
CAFM
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Twinning project, activity 4 Maintenance assessment Tools and techniques used by ProRail to manage costs and performance By Jan Swier and Ted Slump, ProRail,
Multifamily Weatherization for Supportive, Transitional & Affordable Housing The Association for Energy Affordability with Supportive Housing Network of.
SOLARIS s.r.l. SAFETY, RELIABILITY & SERVICE. SAFE TRANSPORT SOLUTIONS FOR THE MINING INDUSTRY.
Prestatiegericht Onderhoud (PGO) Performance based maintenance Peter Booij 18 th November 2011 Manager Contracting.
Monitoring and Feedback of Staff Performance (Discussion Note)
Estate Performance Measurement System (The Value For Money Model)
Appendix 8b. PUBLISHED STANDARDS RELATED TO OUR ACTIVITY.
Fatal Risk Working Group - Working at Height Martin White - Head of Birse Rail.
“Your Open Door to Bonding”. In 1971, the SBA launched a program to assist small, emerging and disadvantaged contractors to obtain surety bonds that were.
South African – Flemish (SAF) Development Programme DGOS-attachés 2003 VVOB.
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Dallas Area Rapid Transit Division Level Measurement Program February 28, 2005.
SOFTWARE PROJECT MANAGEMENT
We provide web based benchmarking, process diagnostics and operational performance measurement solutions to help public and private sector organisations.
Process of Planning, Designing and Financing a Hospital
1 SEC Distribution Field Force Overview Distribution Contractors Day with Saudi Electricity Company October 28 th, 2015.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
TOTAL QUALITY MANAGEMENT
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
Project One - confidential Assignment Summary Headline title A paragraph summarising the assignment, for use in business development Description A short,
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
Regional Information and Marketing Centres Presentation of the Portal-Platform «COOPERATION» supply and demand.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
Breakout Session 3 QHSE Strategic Risk Management.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Structure and Responsibility
EU GRANT AGREEMENT FOR AN ACTION: MARE/2014/04-SI
Assetmanagement in the Netherlands at Rijkswaterstaat
Steering Policy and Steering Systems
UNIT V QUALITY SYSTEMS.
Headgroup Meeting Data Centre Migration
What is the UL QFCP? FCIA Webinar Presenters:
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Visit of the Slovenian Railways March 14 th 2006 How to operationalise kpi’s By Jan Swier, ProRail, The Netherlands, tel , © ProRail. All rights reserved

2 Question Anthonie Bauer (director M&R): “standard kpi’s in management reports” ……………………………………….. ………………………………………. ………………………….. ……………………………………….. ………………………………………. ………………………….. ……………………………………….. ………………………………………. ………………………….. Kpi report region North East

3 The key to manage Time-Performance-Costs-Conditions: Only if you can specify and measure it (performance and costs) you can manage it © ProRail. All rights reserved Actual cost management )* is achieved only when you can manage performance )* and not budget management Process control and dedicated instruments are needed to manage performance

4 Management focus AspectManagement information *Costscost/kpi-report *Performance/qualitykpi-report *TimePlanning *Conditionspm.

5 Four types of inspections to measure quality Types of inspection:Characterisation:Ordering method: Functional inspection Quality inspection Technical inspection Foot inspection Visual inspection (compulsory by law) Guaranteeing safe operation Report limited to nonconformities More frequent than operational inspection Visual inspection Guaranteeing operation Report limited to nonconformities Systematic, at least 1x per year Often involving specialist equipment Quality assessment Uniform inspection report Performed systematically In-depth inspection with specific objective Performed occasionally Unique inspection report Specialist 100% process contract partly process contract partly project order 100% project order

6 Requirements for the development of kpi reports about performance/quality Contract manager Manager M&R RDir Dir Conditions: *Uniform *Countable voor meerdere mngt. niveaus *Comparable *Agreed frequency *Agreed format *Agreed time *Effective en efficiënt Therefor: one source for data, format and report Contract manager Manager M&R RDir Dir ProRail Government, contractors

7 What is necessary for kpi-reports Database + Kpi-report per management level Report format =

8 Overview of kpi-reports Activities Maintenance specifications Compound specs RAMS * Amount of train free periods per category * Amount of train free periods within plan RA M S KPI’s: * Amount of failures: 4 categories * Average failure time RA MS KPI’s: * Track length with exceedings of specs * Amount of exeedings * Standard deviation * Visual quality track (under construction) * Switch geometry (under construction) TRACK ENERGY SUPPLY * Thickness wire * Geometry deviation LEVEL CROSSING: SIGNALLING: * ATC: deviation norm

9 Roles & tasks to operationalise kpi’s Owner/specialist of a kpi *Specialist *Minitor system existing kpi *Improve kpi’s *Develop new kpi *Proposal for Management team *Implement new kpi’s *Help-desk function Contact person from other organisations (contractors, etc. ) Process manager kpi-reporting *Is the conductor of the whole proces: *has the overview over all kpi’s *has an overview over the whole process *faciltates a goog running process *Stimulates improvements Reporter *Makes from data information *Makes kpi-report according format *Distribute of kpi-report to contact persons *Makes proposals to improve

10 Distribution of kpi-reports Reporter of a kpi-report ProRail 1e level 2e level 3e level Managers Employees Contact persons StruktonBAMVSRT Kpi en SKI- rapportages Levels of reporting: *National *National per contractor *Per region *Per contractmanager *Per contract *…….

11 Process to change of implement a kpi Owner/ specialist of a kpi Tune Contact- person other organisation Reporter kpi and owner database Examine possibilities database Proposal to MT *Benefit & Necessity *Costs implementation *Costs exploitation *Yes/No trend break *…………. Management- team Reporter Manager Specialist Process manager kpi-proces Third parties Yes/No to develop a proposal to develop or change a new kpi Request of proposal for a new kpi

12 Walter Meeng; reporter about failures (SAP) Andre Duinmeijer; owner kpi and specialist

13 Wido de Witte; rapporter kpi track geometry Willem v. Ginkel; owner kpi and specialist

14 Marc Pieters; reporter kpi ATC (Automatic Train Control) Albert Bokhorst; owner kpi and specialist

15 Stand: 23 september 2003 Implementation planning

16 Organisation

OPC OPC+ Outsourcing M ix of workplan & specs OPC-07 Alliance s pecs & kpi’s, settle units Tendering Output contract based on specs, kpi’s & incentives Maintenance: 100% outsourced Internal seperation of management- execution of M&R Managing workplan Today Latest development: to tender an output maintenance contract

18 A performance database has to be developed Foot inspections Technical inspections (Incidents) Functional inspections Quality inspections Telemonitoring measuring QuoVadis, POSS, DOS, ……… Track geometry, Switch geometry, Wire geometry, Bridges ………… KO GO Renewal Product Inspection ormat Object database PM Inspection format For all systems Managing: Object quality status Target 1 Target 2Target 3Target 4 Target 5 LCM/IHM Target 6 Performance database

19 Inspection The performance database will be a key instrument to manage & control performance (contracts) ObjectSpecs Judgement Good Moderate Bad Measure …………… O x X x …………… Small Scale Maintenance Large scale Maintenance Renewal …………… O x X x

20 Thank you for your attention Any questions?