Homework Solution Tracking Signals Turner Industries MGMT E-5070 Manual Computer-Based.

Slides:



Advertisements
Similar presentations
Homework Solution Weighted Averages - Exponential Smoothing - Trend
Advertisements

Oklahoma Aggregate Data 1st Quarter 2013 January 1 – March 31, 2013 EVERY WEEK COUNTS.
4/16/ Ardavan Asef-Vaziri Variable of interest Time Series Analysis.
Tutorial on Tukey Charts Farrokh Alemi, Ph.D. Sunday, 11/25/2007.
An Introduction to Statistical Process Control Charts (SPC) Steve Harrison Monday 15 th July – 1pm Room 6 R Floor RHH.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Sales Forecasting “All planning begins with a forecast.”
Time Series Analysis Autocorrelation Naive & Simple Averaging
Forecasting.
Connecting with Clients Our Client Connection Service.
Operations Management R. Dan Reid & Nada R. Sanders
Learning Objectives  Recommend the appropriate forecasting model for a given situation.  Conduct a Delphi forecasting exercise.  Describe.
08/08/02SJSU Bus David Bentley1 Course Part 2 Supply and Demand Management.
Sales Forecasting “All planning begins with a forecast.”
Measuring Market Opportunities Potentials and Forecasts.
Solution MGMT E st Quarter Forecast for the Fourth Year.
Homework Solution Weighted Averages - Exponential Smoothing - Trend Cool-Man Air Conditioners Manual ManualComputer-Based TM MGMT E-5070 Part B.
ISQA 459/559 Advanced Forecasting Mellie Pullman.
Extending that Line into the Future St. Louis CMG February 12, 2008 Wayne Bell – UniGroup, Inc.
Chapter 4 Forecasting Mike Dohan BUSI Forecasting What is forecasting? Why is it important? In what areas can forecasting be applied?
WARM-UP WHAT TYPE OF FUNCTIONS ARE EACH OF THESE? 1).75 X 2) 3X 2 – 2 3) 3X -.75 Homework out.
Time Series Analysis Introduction Averaging Trend Seasonality.
Forecasting and Statistical Process Control MBA Statistics COURSE #5.
Box and Whisker Plots/Graphs Used to show data Broken up into 4 quarters or quartiles. Uses a number line Need to find 5 numbers in order to create.
Time-Series Forecast Models EXAMPLE Monthly Sales ( in units ) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Data Point or (observation) MGMT E-5070.
Time-Series Forecast Models EXAMPLE Monthly Sales ( in units ) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Data Point or (observation) MGMT E-5070.
Forecasting MD707 Operations Management Professor Joy Field.
ERCOT Financial Summary For the Month Ended September 30, 2005
Simplex Linear Programming
Deseasonalizing Forecasts
Example 16.6 Regression-Based Trend Models | 16.1a | 16.2 | 16.3 | 16.4 | 16.5 | 16.2a | 16.7 | 16.7a | 16.7b16.1a a16.7.
Situational Analysis Understanding the Market Definition and Measurement.
Review Use data table from Quiz #4 to forecast sales using exponential smoothing, α = 0.2 What is α called? We are weighting the error associated with.
What is an Inventory Management System?. Inventory Management System is a computer-based system for tracking inventory levels, orders, sales and deliveries.
Chapter 7 Demand Forecasting in a Supply Chain
Manual Computer-Based Homework Assignment Tracking Signals Turner Industries Due on, or before February 19th.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 8 Forecasting To Accompany.
Chart Assistant Based upon collected process metrics data determines whether process is in control using statistical methods.
Process Control Charts By: Brian Murphy. Control Charts are an on-line process- monitoring technique. Used to determine if a process is capable or out.
Objectives  Understanding Fractions  Concepts of Half & Quarter  Writing Fractions  Fun With Fractions.
Forecasting Purpose is to forecast, not to explain the historical pattern Models for forecasting may not make sense as a description for ”physical” behaviour.
Tech 31: Unit 3 Control Charts for Variables
Analysis for Marketing Planning
Monthly mean of stream lines at 200 hPa (upper) and 850 hPa (lower)
BUS 3059 Competitive Success/snaptutorial.com
BUS 3059 Education for Service-- snaptutorial.com.
BACK SOLUTION:
BUS 3059 Teaching Effectively-- snaptutorial.com.
Variable Control Charts
Revenue Forecasting Nov. 9, 2006
Moving Averages OCR Stage 8.
Moving Averages.
February 2018: SKF demand outlook Q1 2018
st Qtr 2nd Qtr 3rd Qtr 4th Qtr
The Derivative as a Function
How am I doing? Summative Tests– 1st Quarter 100% 90% 80% 70% 60% 50%
Box and Whisker Plots 50% Step 1 – Order the series.
Evaluation of a Stochastic Oscillator Equity Trading Method
How am I doing? Weekly Reviews – 1st Quarter 100% 90% 80% 70% 60% 50%
PowerPoint Template จัดทำโดย
Forecasting - Introduction
A statistical process control chart illustrating the handover scores observed for each handover before and after implementation of the standardised handover.
February 2015: SKF demand outlook Q1 2016
October 2016: SKF demand outlook Q4 2016
Weeks T1 to T15 correspond to data collection in 2015 (January 5–April 18). Weeks T1 to T15 correspond to data collection in 2015 (January 5–April 18).
S chart demonstrating the reduction in average days spent on the waiting list for known patients awaiting admission to the intestinal failure unit. S chart.
Measuring for improvement: from Toyota to thoracic surgery
S chart showing sustained reduction in length of stay (LOS) for all inpatients and a reduction in the variation around the mean length of stay. S chart.
Moving Averages.
(A) Weekly statistical process control (SPC) chart showing percentage of FIT order rate. (A) Weekly statistical process control (SPC) chart showing percentage.
Presentation transcript:

Homework Solution Tracking Signals Turner Industries MGMT E-5070 Manual Computer-Based

1 st Quarter Forecast for the Fourth Year

Naïve Approach Tracking Signals

Tracking Signal Chart Naïve Approach Qtr Qtr Qtr Qtr Qtr Qtr UPPER CONTROL LIMIT LOWER CONTROL LIMIT NO TRACKING SIGNALS TRACKING SIGNAL Tracking Signal Tripped UCL

1 st Quarter 4 th Year Forecast

2-Quarter Moving Average Tracking Signals

Tracking Signal Chart Two - Quarter Moving Average Approach Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr UPPER CONTROL LIMIT LOWER CONTROL LIMIT NO TRACKING SIGNALS TRACKING SIGNAL Tracking Signal Tripped UCL

Trend Line Tracking Signals

Tracking Signal Chart Trend Line Regression Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr UPPER CONTROL LIMIT LOWER CONTROL LIMIT TRACKING SIGNAL Narrow CL Wide CL

Tracking Signal Chart Trend Line Regression Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr UPPER CONTROL LIMIT LOWER CONTROL LIMIT TRACKING SIGNAL

Homework Solution Tracking Signals Turner Industries MGMT E-5070 Manual Computer-Based