Welcome to the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing.

Slides:



Advertisements
Similar presentations
SAM 2007 v4 The Student Experience Including SAM Projects, SAM Exams and SAM Training.
Advertisements

E-Portfolio July2014 Managing Multi-source Feedback.
OnBase E-Forms and Workflow
MIP Workbench: Revisions FEMA Learning Management System FEMA REVISION LEAD.
MIP Workbench: Revisions FEMA Learning Management System Audit Lead.
MIP Workbench: Revisions FEMA Learning Management System FEE ADMINISTRATION ROLE.
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
PRESAGE-CTE Seminar MED Programme MED Programme Paris, 22 nd September 2009.
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Self-paced study guide for Online Performance Evaluations – Detailed steps for Employee Self-evaluation.
Self-paced study guide for Online Performance Evaluations.
Homepage To learn about eLOMA click on the ‘Learn about eLOMA’ link under the Tools For Professionals.
Page 1 of 53 The Work In Progress functionality of Transfers enables you to retrieve a transfer request, view/change the request status depending on your.
SP14 Producer Training. Welcome  Welcome  Introductions  Classroom Protocol  Agenda.
MANAGE PRE-SCOPING MIP Home. Manage Pre-Scoping/SS03 SS03 “Pre-scope project: Pre-scoping checklist”  This is the pre-scoping checklist. The goal of.
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
MIP Workbench: Revisions FEMA Learning Management System PROJECT ADMINISTRATION ROLE.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Welcome to the Manage Flood Mapping – Setup Map Production module of the “MIP Release 3 Study Workflow Training” course! This module guides you through.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
Creating a Web Site to Gather Data and Conduct Research.
Nipissing’s ROMEO e-System Internal Research Funding (IRF) Internal Research Grant Application Form (IRG)
Welcome to the Manage Revalidation module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the revalidation process.
MIP Workbench: Revisions FEMA Learning Management System TASK LEAD ROLE MODULE.
Welcome to the Manage Scoping module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing the.
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
MIP Workbench: Revisions FEMA Learning Management System PROJECT LEAD.
Training by the Office of Library and Information Services Contact for more information: karen.gardner- or
Welcome to the Create Project module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of creating study.
ELodgement User Guide July 2009 Level 8, 15 Blue Street, North Sydney NSW 2060 Tel:
1 MIP Sequencing Tool Training Introduction to the Sequencing Tool.
Susan G. Komen Central Wisconsin Affiliate Komen Grants eManagement System GeMS Community Grants Application Training October 2015.
System for Administration, Training, and Educational Resources for NASA External Training Requests for Users and Supervisors November 2009.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Module Table of Contents (By Section) Produce Preliminary Map Products Citrix Web Interface & Load Data Artifacts Validate Content Submission Perform Independent.
Early Childhood Outcomes Indicator 7 Data Collection Application Review.
MIP Workbench: Revisions FEMA Learning Management System REVISION RESOURCE MANAGER.
Researcher training for ACAP © Created by Isaac P. E. Mailleue Research Integrity Coordinator University of North Carolina at Greensboro September 2013.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Welcome to the Manage Flood Mapping – Distributing Preliminary Map Products module of the “MIP Release 3 Study Workflow Training” course! This module guides.
SMART Tip Sheets Maryland February 2008 IGSR Technical Support: Client Referral Consent Referral Accepting Referrals This tip sheet focuses.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Learning Partner Associate Requirements and Application Process.
2016 TELPAS Online Testing. TELPAS Assessment Management System Accessed at
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
HTBN Batches These slides are intended as a starting point for further discussion of how eTime might be extended to allow easier processing of HTBN data.
7 Day Self Assessment Tool (7 Day SAT) March 2016 Survey - User Guide v4 (March 2016)
This tip sheet focuses on how to share client records and make client referrals using SMART. Total Pages: 6 Client Consent and Referral Consent Referral.
Rev. May 2016 cuResearch User’s Manual. What is cuResearch? Introduction to cuResearch More information is available on the CURO website:
Welcome to the Manage Flood Engineering module of the “MIP Release 3 Study Workflow Training course! This module guides you through the process of obligating.
Standard Operating Procedure
Broker training for Callidus Cloud EnvisionRxPlus for 2018
Conducting the performance appraisal
To the ETS – Agreement Management Online Training Course
To the ETS – Agreement Management Online Training Course
Conducting the performance appraisal
MyGaDOE Portal Provisioning for Security Officers
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Orders & Shipment Tracking
ETS Submission Process for New Project Applications
Fantastic Graphics Inc. 2017
To the ETS – Encumbrance Online Training Course
Online Training Course
To the ETS – Agreement Management Online Training Course
To the ETS – Agreement Management Online Training Course
To the ETS – Encumbrance Online Training Course
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Welcome to the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing the quality assurance of Data Development Tasks for a study project area. Only authenticated users with a NSP QA Task Lead, Study Project Administrator, and Independent QA Task Lead role can manage quality assurance of Data Development Tasks. Training manual users will find workflow and role diagrams throughout the modules. Web-based users, may click on the “View Workflow” and “View Role” buttons to see where you are in the workflow and role descriptions with associated organization types. Module Table of Contents (By Section) Validate Content Submission (No Audit) Validate Content Submission (Audit) Authorize Independent QA Perform Independent QA/QC Audit Submission Store Content Self Quiz Where are you in the Workflow? MANAGE QUALITY ASSURANCE

Once a Data Development Task is completed, the “Validate Content Submission” task will be sent to the NSP QA Task Lead to validate the content. The purpose of this task is to ensure that the mapping partner has submitted a complete package. There are two different Validate Content Submission screens. If Independent QA was neither funded nor planned for the task, the validate screen appears with an option for the NSP to perform an audit. If Independent QA was required, the screen appears without the option to audit (as shown here). Reminder: Online Help content provides assistance to users and is available throughout the MIP. MANAGE QUALITY ASSURANCE NSP QA Task LeadQA01 No Audit Manage Quality Assurance ROLE: NSP QA Task Lead Description of Role: Responsible for validating content submissions, auditing submissions (if appropriate), and storing submissions. Also responsible for independent QA of mapping products. Organization Type: ModRMC, ModHQ QA01 Validate Content Submission Decide if the task passes or fails validation If the task passes, the project moves forward to: Indep QA (QA02) if funded for QA Authorize indep QA (QA00) if planned for QA Audit (QA03) if selected during validate Store (QA04) if neither indep QA nor audit is required If the task fails, the project goes back to the data development task for rework. Validate Content Submission (No Audit)

For a multiple area project, a specific task (e.g. Acquire Base Map) may have many areas associated with the task that are completed at different times. Because the areas can be completed at different times, each area goes through the QA process separately. The result is that several instances of the same Data Development Task may appear on your Work Item List for Validate Content. Throughout this module the role performing the activity and a numerical or descriptive identifier for the screen are displayed in bold on the bottom left and right hand corners of the screen shot to the right. MANAGE QUALITY ASSURANCE NSP QA Task LeadQA01 No Audit Where are you in the Workflow? Validate Content Submission (No Audit)

Fill out the checklist and enter the date the content was received. Caution: Certification that the submittal adheres to guidelines and specifications, data capture standards, or validation of the datums and projection will only be performed if the NSP Task Lead role is currently funded to perform those activities. Independent QA occurs in the next workflow step. If the submittal is complete, select “yes” to validate submission. This will route the task to the Independent QA Task Lead, or to the Study Project Administrator to authorize Independent QA (if the QA had been planned). If the submittal is incomplete, select “no” to send the task back to the Data Development Task lead for rework. After the rework is complete, the task will return to be validated again. MANAGE QUALITY ASSURANCE NSP QA Task LeadQA01 No Audit Validate Content Submission (No Audit)

Once a Data Development Task is completed, the “Validate Content Submission” task will be sent to the NSP QA Task Lead to validate the content. The purpose of this task is to ensure that the mapping partner has submitted a complete package. If Independent QA was neither funded nor planned for the task, the validate screen appears with an option for the NSP to perform an audit (as shown). Note: Clicking the Save Work button will save the data a user has entered; however, a user can not save a screen that is only partially completed. MANAGE QUALITY ASSURANCE NSP QA Task LeadQA01 with Audit Validate Content Submission (Audit)

Fill out the checklist and enter the date the content was received. Caution: Certification that the submittal adheres to guidelines and specifications, data capture standards, or validation of the datums and projection will only be performed if the NSP Task Lead role is currently funded to perform those activities. Independent QA occurs in the next workflow step. Check “Audit Required” to audit the task. The “Audit Data Development” task will then appear on your Work Item List (provided the content is validated). Determine whether the task will count toward national metrics. At the present time, only fully digital, countywide mapping projects meet national metrics. MANAGE QUALITY ASSURANCE NSP QA Task Lead QA01 with Audit Validate Content Submission (Audit)

If the submittal is complete, click “yes” to validate submission. This will route the task to your Work Item List for an audit (if audit is required) or to Store Content. If the submittal is incomplete, select “no” to send the task back to the Data Development Task lead for rework (whether or not you have required an audit). After the rework is complete, the task will return to be validated again. Important Note: If you want to send the task directly to audit, you must indicate “yes” for “Validate Content Submission” and check “Audit Required.” For all study workflow tasks, there will be a Review screen (where all task information entered can be reviewed) and a Complete Task screen. MANAGE QUALITY ASSURANCE NSP QA Task LeadQA01 with Audit Validate Content Submission (Audit)

After a Data Development Task with required Independent QA is completed and passes validation, it proceeds to Independent QA. If Independent QA was planned during “Obligate Project Funds” or “Authorize Planned Data Development Task,” the Study Project Administrator will need to authorize it. To authorize Independent QA, select the type of organization (e.g. CTP) and the organization performing the QA task. Correct selection of “Organization Type” and “Organization Name” ensures the QA task is routed to the Work Item List of all potential Independent QA Task lead(s) of that organization. MANAGE QUALITY ASSURANCE Manage Quality Assurance ROLE: Study Project Administrator Description of Role: Responsible for initiating new projects (i.e., entering all required information about project geography, responsible organization, cost, and schedule) and updating the cost and schedule information throughout the project. Organization Type: Same org that completed SM01. ModRMC, ModHQ, FEMARegion, or FEMA HQ could register to do this task. QA00 Authorize independent QA (from QA01 – then go to QA02) Study Project AdministratorQA00 Where are you in the Workflow? Authorize Independent QA

Enter the baseline “Start Date” and “End Date,” and “Cost” information, for the Independent QA Task. The contract information is not tied to any MIP functionality but it will appear in the reports. All Data Development Tasks (and associated QA) need to be completed for an area prior to making a preliminary map. MANAGE QUALITY ASSURANCE Study Project AdministratorQA00 Authorize Independent QA

The intent of Independent QA/QC reviews is to reasonably verify that the analyses and other mapping activities are performed and that the products generated during a flood map project meet the requirements of the Guidelines and Specifications and the mapping partner’s contract. Your progress on the Independent QA task should be updated on the last day of each month or as required by your contract. Enter the actual cost of the QA task to date and the physical percent complete. Enter the reporting date for “As of.” MANAGE QUALITY ASSURANCE Manage Quality Assurance ROLE: Independent QA Task Lead Description of Role: Responsible for performing Independent QA on data development tasks. Note the person assigned to this role would be able to claim any independent QA activity for a data development task (Base Map, Field Survey, Topography, Hydrology, Hydraulics, Coastal, DFIRM Database, Alluvial Fan, Floodplain Mapping, and Re-Delineation.) Organization Type: Assigned Indep QA Org. Any org type could register to do this task. QA02 Independent QA Decide if the task passes or fails independent QA. If the task passes, the project moves forward to Store Content (QA04) If the task fails, the project goes back to the data development task for rework. Independent QA Task LeadQA02 Where are you in the Workflow? Perform Independent QA/QC

Note: 100% complete is a valid entry on this screen. For a progress update only, select “Save Work.” If your Independent QA task is completed for the specific area select “Continue.” Caution: Be sure that all of your QA work is complete before completing the QA task. If you continue and click “Complete Task,” the task will be sent to the next workflow step regardless of the percent complete entered. MANAGE QUALITY ASSURANCE Independent QA Task LeadQA02 Perform Independent QA/QC

When the Data Development Task passes QA, select “Approve” and type any comments in the free text field provided. The task will then be sent to the NSP QA Task Lead to store the content. If the task fails QA, select “Reject” and add any comments. The task (and associated comments) will be sent to the Data Development Task lead for rework. After the rework is complete the task will return to be validated again and then return to Independent QA. MANAGE QUALITY ASSURANCE Independent QA Task LeadQA02 Perform Independent QA/QC

The “Audit Submission” task will be routed to the NSP QA Task Lead if an audit was required during Validate Content. The option for the NSP to audit only occurs if Independent QA is neither funded nor planned. If the Data Development Task passes the audit, select “Approve” and the task will be sent to your Work Item List to store the content. If the task fails the audit, select “Reject.” The task will be sent to the Data Development Task lead for rework. After the rework is complete the task will return to be validated again, with the option for another audit. MANAGE QUALITY ASSURANCE Manage Quality Assurance ROLE: NSP QA Task Lead Description of Role: Responsible for validating content submissions, auditing submissions (if appropriate), and storing submissions. Also responsible for independent QA of mapping products. Organization Type: ModRMC, ModHQ QA03 Audit Submission (from QA01 – if audit is required) Decide if the task passes or fails the audit If the task passes, the project moves forward to: Store Content (QA04) If the task fails, the project goes back to the data development task for rework. NSP QA Task Lead QA03 Where are you in the Workflow? Audit Submission

After the Data Development Task has been validated, passed Independent QA (if required), or passed the audit (if required), the NSP QA Task Lead will store the content of the submittal. Certify that the digital content has been stored on the NSP file structure, and type any comments in the space provided. Take the time to complete the short Self Quiz on the following page before proceeding to the next training module. MANAGE QUALITY ASSURANCE Manage Quality Assurance ROLE: NSP QA Task Lead Description of Role: Responsible for validating content submissions, auditing submissions (if appropriate), and storing submissions. Also responsible for independent QA of mapping products. Organization Type: ModRMC, ModHQ QA04 Store Content (from QA02 or QA03) NSP QA Task Lead QA04 Where are you in the Workflow? Store Content

1. When a Data Development Task passes Independent QA, the task will be routed to the Study Project Administrator to store the content. True or False 2. If Independent QA was not selected for a task, the task may be selected for an audit during the “Validate Content” activity. True or False This concludes the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course. Please proceed to the next module in the course, Manage Flood Mapping – Setup Map Production.MIP Release 3 Study Workflow Training MANAGE QUALITY ASSURANCE Self Quiz Answers: 1. False, 2. True Self Quiz