Backup Rationalisation Reorganisation of the CERN Computer Centre Backups David Asbury IT/DS Friday 6 December 2002.

Slides:



Advertisements
Similar presentations
Computing Infrastructure
Advertisements

XenData SX-520 LTO Archive Servers A series of archive servers based on IT standards, designed for the demanding requirements of the media and entertainment.
Disk-to-Disk Backup So Much Data, So Little Time Timothy Antonowicz Senior Systems Engineer Bowdoin College Copyright 2007.
James Crowley C3 – Crowley Computer Consulting. Presentation  Available at
STANFORD UNIVERSITY INFORMATION TECHNOLOGY SERVICES IT Services Storage And Backup Low Cost Central Storage (LCCS) January 9,
A new standard in Enterprise File Backup. Contents 1.Comparison with current backup methods 2.Introducing Snapshot EFB 3.Snapshot EFB features 4.Organization.
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald TRIUMF Steven McDonald & Konstantin Olchanski TRIUMF Network & Computing Services
10/11/2006 Office of Information Technology Princeton University Educause 2006 Copyright Copyright Charles Augustine This work is the intellectual.
Data & Storage Services CERN IT Department CH-1211 Genève 23 Switzerland t DSS TSM CERN Daniele Francesco Kruse CERN IT/DSS.
NetBackup 6.0 What’s New. What’s New in NetBackup 6.0 Management and Reporting Core Product Enhancements Disk Management and Optimization Additional NetApp.
The Ultimate Backup Solution.
Guide to Linux Installation and Administration, 2e1 Chapter 13 Backing Up System Data.
Storwize V7000 IP Replication solution explained
BACKUP/MASTER: Immediate Relief with Disk Backup Presented by W. Curtis Preston VP, Service Development GlassHouse Technologies, Inc.
NovaBACKUP 10 xSP Technical Training By: Nathan Fouarge
CT NIKHEF June File server CT system support.
Backup & Recovery Concepts for Oracle Database
Mass RHIC Computing Facility Razvan Popescu - Brookhaven National Laboratory.
High Availability & Oracle RAC 18 Aug 2005 John Sheaffer Platform Solution Specialist
1 Objectives Discuss the Windows Printer Model and how it is implemented in Windows Server 2008 Install the Print Services components of Windows Server.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
HEPIX 3 November 2000 Current Mass Storage Status/Plans at CERN 1 HEPIX 3 November 2000 H.Renshall PDP/IT.
Selling the Database Edition for Oracle on HP-UX November 2000.
Oracle Recovery Manager (RMAN) 10g : Reloaded
Windows Server MIS 424 Professor Sandvig. Overview Role of servers Performance Requirements Server Hardware Software Windows Server IIS.
11 The Ultimate Upgrade Nicholas Garcia Bell Helicopter Textron.
Online Databases Status Oracle 8i Servers, release Platform: Compaq Tru64 UNIX V5.1 (Rev. 732) Production DB d0onprd, on d0olc, 64 users, 34Gb.
Make your numbers and build your pipeline Capacity UPSELL.
The GSI Mass Storage System TAB GridKa, FZ Karlsruhe Sep. 4, 2002 Horst Göringer, GSI Darmstadt
CASPUR Site Report Andrei Maslennikov Sector Leader - Systems Catania, April 2001.
Maintaining File Services. Shadow Copies of Shared Folders Automatically retains copies of files on a server from specific points in time Prevents administrators.
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
CASPUR Site Report Andrei Maslennikov Lead - Systems Karlsruhe, May 2005.
Data Synchronization by Dennis Sparrow. Infrastructure  New York Board of Trade (NYBOT) maintains 3 sites –Primary Trading Floor –Primary Data Center.
GStore: GSI Mass Storage ITEE-Palaver GSI Horst Göringer, Matthias Feyerabend, Sergei Sedykh
20-22 September 1999 HPSS User Forum, Santa Fe CERN IT/PDP 1 History  Test system HPSS 3.2 installation in Oct 1997 IBM AIX machines with IBM 3590 drives.
21 st October 2002BaBar Computing – Stephen J. Gowdy 1 Of 25 BaBar Computing Stephen J. Gowdy BaBar Computing Coordinator SLAC 21 st October 2002 Second.
SLAC Site Report Chuck Boeheim Assistant Director, SLAC Computing Services.
CASTOR: CERN’s data management system CHEP03 25/3/2003 Ben Couturier, Jean-Damien Durand, Olof Bärring CERN.
Focus 2 March 2000Recent AFS Problems and Current Planning 1 Focus 2 March 2000 H.Renshall PDP/IT.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility (formerly CEBAF - The Continuous Electron Beam Accelerator Facility)
S.Jarp CERN openlab CERN openlab Total Cost of Ownership 11 November 2003 Sverre Jarp.
Backup. What to back up? Pictures Documents (include s if using Off Line Program) Video’s Music System Image – Programs – Registry – Operating System.
IDE disk servers at CERN Helge Meinhard / CERN-IT CERN OpenLab workshop 17 March 2003.
TiBS Fermilab – HEPiX-HEPNT Ray Pasetes October 22, 2003.
14 th April 1999CERN Site Report, HEPiX RAL. A.Silverman CERN Site Report HEPiX April 1999 RAL Alan Silverman CERN/IT/DIS.
CASPUR Site Report Andrei Maslennikov Group Leader - Systems RAL, April 1999.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
D0 Taking Stock1 By Anil Kumar CD/CSS/DSG June 06, 2005.
Reliability of KLOE Computing Paolo Santangelo for the KLOE Collaboration INFN LNF Commissione Scientifica Nazionale 1 Roma, 13 Ottobre 2003.
Randy MelenApril 14, Stanford Linear Accelerator Center Site Report April 1999 Randy Melen SLAC Computing Services/Systems HPC Team Leader.
Macromolecular Crystallography Workshop 2004 Recent developments regarding our Computer Environment, Remote Access and Backup Options.
HEPIX Backup Survey David Asbury CERN/IT/FIO HEPIX, Rome, 6 April 2006.
Backup Exec System Recovery. 2 Outline Introduction Challenges Solution Implementation Results Recommendations Q & A.
Focus 28 March Tape Service and CASTOR Issues Focus 28 March 2002 H.Renshall IT/DS.
01. December 2004Bernd Panzer-Steindel, CERN/IT1 Tape Storage Issues Bernd Panzer-Steindel LCG Fabric Area Manager CERN/IT.
W.A.Wojcik/CCIN2P3, HEPiX at SLAC, Oct CCIN2P3 Site report Wojciech A. Wojcik IN2P3 Computing Center URL:
Unit 1: IBM Tivoli Storage Manager 5.1 Overview. 2 Objectives Upon the completion of this unit, you will be able to: Identify the purpose of IBM Tivoli.
Virtual Server Server Self Service Center (S3C) JI July.
UNIX Operating System. A Brief Review of Computer System 1. The Hardware CPU, RAM, ROM, DISK, CD-ROM, Monitor, Graphics Card, Keyboard, Mouse, Printer,
Open-E Data Storage Software (DSS V6)
Integrating Disk into Backup for Faster Restores
Backup & Recovery of Physics Databases
Experiences and Outlook Data Preservation and Long Term Analysis
The Ultimate Backup Solution.
XenData SX-550 LTO Archive Servers
CASTOR: CERN’s data management system
IBM Tivoli Storage Manager
Presentation transcript:

Backup Rationalisation Reorganisation of the CERN Computer Centre Backups David Asbury IT/DS Friday 6 December 2002

6 Dec 2002C5 Presentation: Backup Rationalisation2 Reasons for backup u Accidental corruption of files/mail/data u Storage failure, disks, raid arrays(!) u Need to get a server running again u Backup is very boring until ….!

6 Dec 2002C5 Presentation: Backup Rationalisation3 Different sorts of data u Home Directories u AFS u Windows DFS u Mail u Unix servers u Microsoft Exchange u Databases u Unix group & project servers u Experimental Data TSM AFS specific backup Legato TSM Castor TSM

6 Dec 2002C5 Presentation: Backup Rationalisation4 Backup Systems available u IBM Tivoli Storage Manager (TSM) u Formerly called ADSM u Run by CERN, IBM & DCS u Legato Networker u TSM did not support collocation, slow to restore u Run by Serco u Mostly computer centre backups u Veritas u TSM has some functional advantages u Expensive on Windows

6 Dec 2002C5 Presentation: Backup Rationalisation5 Proposal: Use TSM for everything (1) u Supports backing up on u Unix Solaris 2.6/7/8/9 & Linux 6/ legacy systems u Windows DFS & Exchange u AFS u Already contains archived data u pubarch (613GB, est 5M files) u vmarch (160GB, 1.6M files) u Backup exchange is running u No need to move cartridges out of silos

6 Dec 2002C5 Presentation: Backup Rationalisation6 Proposal: Use TSM for everything (2) u Collocation option supported and in use u Minimises tape mounts on restore, but more on backup u Works well with current 1TB disk staging areas u Backup during day, move to tape overnight u With ~2TB disk could keep yesterday’s backup online u Supports journal-style scan for DFS u Constructs list of files to backup as they are changed u Avoids slow scan of file tree

6 Dec 2002C5 Presentation: Backup Rationalisation7 How we propose to get there (1) u Overlap periods? u Keep existing products for restores u Mostly 6 months, max 1 year u Archived engineering data to be copied (600 files, 8TB) u Hardware upgraded (see later slide)

6 Dec 2002C5 Presentation: Backup Rationalisation8 How we propose to get there (2) u Timing: u Stop Legato service when backups age out u Latest, at end of Serco contract (end 2003) u Automation of restores u Scripts possible with TSM (may save manpower) u Like pubarch allowing controlled user access

6 Dec 2002C5 Presentation: Backup Rationalisation9 Costs today (1): Legato SunBasic Licence61 KCHF Serco Service Contract Reloads 105 KCHF Est 30 KCHF Sun Hardware Maintenance 2 x E450 machines 5 STK 9840 drives 9.4 KCHF 15.4 KCHF 9840 Tape Media 24 KCHF in 2002

6 Dec 2002C5 Presentation: Backup Rationalisation10 Costs today (2): TSM v4 IBMBasic Licence32 KCHF IBMServer & product support20 KCHF DCSClient support36 KCHF IBM Hardware Maintenance 2 x IBM F50 machines 8 x 3590E drives 9 KCHF 30 KCHF 3590E Tape Media0 in 2002

6 Dec 2002C5 Presentation: Backup Rationalisation11 Cost Comparison u Assuming all done with one product u Hardware & support costs similar u Licences must increase: u Legato: 61 KCHF to (est) 108 KCHF u TSM: 32 KCHF to (est) 82 KCHF (in v5) u Optional one-time charge for ORACLE hot backup extra RMAN product u TSM v5 charged differently from v4 u Will be cheaper as many machines already in TSM

6 Dec 2002C5 Presentation: Backup Rationalisation12 Hardware today u TSM: 2 x IBM F50 (previously HPSS): u 2/2 cpus u 4/4 x IBM 3590E tape drives (40GB capacity) u 28/28 x 18GB disk buffer u Gigabit u Fast back planes – good for I/O u Legato: 2 x Sun E450 u 2/4 cpus u 2/4 STK 9840 drives (20GB capacity) u No disk buffer u Gigabit

6 Dec 2002C5 Presentation: Backup Rationalisation13 TSM experience & tests u Unix servers already backed-up: AIX, HP, IRIX, Linux, OSF, Solaris, ULTRIX u Windows servers: u Exchange, DFS, (Active Directory) u AFS tested u Database servers (15 now in TSM) u File backup today u Incremental costs 860 CHF/1 st yr/cpu (RMAN) u DFS test (1 server): Legato 65min, TSM 46min

6 Dec 2002C5 Presentation: Backup Rationalisation14 Hardware expansion u Little or no extra cost u Add ~ E tapes (from HPSS), more needed later u add more 3590E drives (2 more available now) u Additional TSM server u Use old Legato E450 (expensive), or new machine u Use existing 9840 drives & tapes (unsuitable for backup) u Long term server platform u AIX or Solaris (linux supported recently)

6 Dec 2002C5 Presentation: Backup Rationalisation15 Immediate Plan u Replace old staging disks and increase u Start AFS backup using TSM u Move Legato clients into TSM u Nearly all are IT machines u Organise move of archived Legato data u Run with current hardware for 2003 u TSM to be run by new Operations Team u Review hardware in 2004

6 Dec 2002C5 Presentation: Backup Rationalisation16 Future growth expected u AFS – 20% increase (COCOtime) < 1TB u Windows ~ 20% est increase u Small additional unix data u Maybe 15 more databases ~ 10TB u Oracle physics dbs ~ 1TB each

Questions?