Pavement Restoration on Main Replacement Projects Pipe Splitting and Keyhole Technology At Southwest Gas Corporation Southwest Gas Corporation Kenny Pollock.

Slides:



Advertisements
Similar presentations
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Advertisements

New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Environmental Drilling By: Josh Humphreys October 8,2006.
Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
POLYPATCH. PolyPatch: What is it? Hot-applied, pourable, self- adhesive patching material Hot-applied, pourable, self- adhesive patching material has.
INDIAN VALLEY COMMUNITY SERVICES DISTRICT. It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition,
City and County of Denver 2015 Capital Projects - Wastewater
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Designers & Fabricators of Water & Waste Water Equipment Water Pump Stations.
SubAir Unit location The first step to installing a SubAir System is to select a suitable location for the unit. The ideal location minimizes any disruption.
Composite Wrap for Non-leaking Pipeline Defects Lessons Learned from Natural Gas STAR Transmission Technology Transfer Workshop Duke Energy Gas Transmission,
First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, Eliminated need for concrete thrust blocking Case History:
Engineering Services Department of Public Utilities.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
|0 THE SKINNER COMPANY PRODUCT REVIEW
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
TransCanada Corporation (TSX/NYSE: TRP)
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
Gwinnett County’s Post Development Stormwater Management Program
Steve Lefler - Principal Engineer Duke Energy
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Intermediate SFFMA Objectives: – Hrs received.
TRENCHLESS TECHNOLOGY
Triton Lining Systems LLC. The City of Sac City, Sac City Iowa, Water Distribution Pipe In-Situ Rehabilitation July 2012.
ORT-E A turn-key Engineering Based Manufacturer and systems integrator. Oak Ridge Tool Engineering, Inc. Oak Ridge Tool Engineering, Inc. Engineering Systems.
Composite Wrap Lessons Learned from Natural Gas STAR EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and Pioneer Natural Resources.
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Introduction to Construction General Permit Inspections.
CWP Gas Job Funnel. CWP Funnel  CWP recently completed a gas funnel program for entry level laborer positions  Candidates were prescreened prior to.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Problem: surface ponding. Solution: surface or subsurface drainage.
We provide and maintain all utilities such as Electricity, Water, Waste Water, Heating and Cooling Services, Refuse Collection, and the Garrison Recycling.
TRENCHLESS TECHNOLOGIES Submitted By:- Kamaldeep Gupta C-3.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
1 Public Works Operations March 11, Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
The BRP Road Patch Exclusive Australian Distributors.
Delivering proven solutions to improve your productivity Municipal Customer September, 2011.
The City of Mesa EFV Program Anthony Cadorin Gas Planning Engineer City of Mesa Natural Gas Division Mesa, Arizona.
AG Mechanics Fall Semester Review. 1.1 Define terminology 1. Agricultural mechanics – a broad area of knowledge and skills related to performing construction,
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
IRRIGATION SYSTEMS. OBJECTIVES 1. Describe irrigation & its purpose 2. Explain preparation for irrigation systems 3. Calculate GPM 4. Identify & explain.
State Route 342 Bypass and Realignment Solution Joint Effort of the Nevada Department of Transportation, Storey County, and Comstock Mining.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
Concrete Repair.
Agenda Updates to Driveway and Sidewalk specifications and permits
WATER MAIN REHABILITATION
In order to design a sprinkler or drip irrigation system for the lawn, we must first know how much flow is available in gallons per minute from the water.
THE SKINNER COMPANY Product Review
Fuel Supply System Service
4th Annual Construction Law Summit
Overfill Prevention Technology and Maintenance
2018 Pavement Workshop May 23-24, 2018
Water Main Rehabilitation Cured-In-Place-Pipe Technology
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Public Works 2020 Budget and CIP Review.
Marshall Pollock Monday, April 20, 2009
Presentation transcript:

Pavement Restoration on Main Replacement Projects Pipe Splitting and Keyhole Technology At Southwest Gas Corporation Southwest Gas Corporation Kenny Pollock Manager Gas Operations Support Staff

What is Keyhole? 12”/18”/24” diameter core precision cut through pavement Core set aside for reinstatement after repairs Underground facilities exposed by vacuum excavation Repairs made from the surface using long-handled tools Hole is then backfilled to base of pavement Utilibond Grout is then mixed with water and poured into hole Core is reinserted back into the hole and bonded to the pavement for a permanent restoration Road is re-opened to traffic within 30 minutes to an hour –Weather conditions dictate curing time

Chronological Order of Keyhole Events At Southwest Gas 1999 –Research began on keyhole processes Spring of 2001 –First live demo of coring equipment Completed core

Chronological Order of Events cont.’ Summer of 2002 –Live demo, including vendors of various tools and products used for “Keyhole Processes.” Winter of 2002 –Presentation to the City of Phoenix on “Keyhole” processes.

Chronological Order of Events cont.’ Spring 2003 –Field demo for the City of Phoenix, Scottsdale, Gilbert, as well as several other utilities in the Phoenix metropolitan area. Demo included one 18” core, vacuum excavation, Trenton patch, backfill utilizing the “Soil Compaction Supervisor”, and the reinstallation of the original core. Spring 2005 –Demo for Pima County and City of Tucson

Keyhole Processes and Equipment Keyhole Processes and Equipment Post Wrapping Anode Installation using the Thermo weld process

Keyhole Processes and Equipment cont’. Valve Box Replacement Electro fusion Service Tee

Keyhole Processes and Equipment cont’. Service to main mechanical connection Flow Control

Keyhole Processes and Equipment cont’. Snake Eyes II Camera Utilized for down hole inspection Soil Compaction Supervisor Soil Compaction Supervisor w/data logging capabilities

Coring Units Truck Mounted Skid Steer

Division Success Northern Nevada Division –Currently performing service replacement and service to main connections Utilizing the Split and Pull method –Anode installations for isolated steel project –Bond wire installations –Sub-surface utility engineering (SUE)

What’s in the Future? Processes continue to be improved and refined –Service replacement, stop offs, both emergency and planned. New Tools and Technology improvements –As existing processes are mastered, new ones are evolving re., different types of electro fusion, welding through a keyhole, launching cameras for inspection, etc. New Vendors and Equipment –Manufacturers continue to bring down the cost of tooling and equipment –Ideas and techniques for new processes are being shared by tooling manufacturers

Northern Nevada Replacement Project Byron Elkins Manager Operations Planning and Analysis

Example: Open Trench: 500’ of PVC Main w/10 Services 500 x 3.8 = 1,900 Square Feet of Pavement Restoration Required Split & Pull w/Keyhole: 500’ of PVC Main w/10 Services 500 x.5 = 250 Square Feet of Pavement Restoration Required

Benefits Reduced Labor Improved relations with governmental agencies Enables excavations on “No Cut Streets” One-stop Shop Improved customer satisfaction Visually Aesthetic No Maintenance

Questions?