1 South Gas Regional Initiative Work Plan 2011-2014 Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.

Slides:



Advertisements
Similar presentations
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
1 Madrid, 19 th February st SG Meeting South Gas Regional Initiative.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
European Developments Transmission Workgroup 1 st December 2011.
1 South Gas Regional Initiative 14 th Stakeholders Group meeting Madrid, 11 th July 2011.
European Developments Transmission Workgroup 3 rd May 2012.
GRI NW European Energy Work Plan 2011 – 2014 Robert Spencer 20th Madrid Forum, 26 September 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative South South-East
29th November 2016 Teleconference
21st IG Meeting South Gas Regional Initiative
Harmonization of Cross Border Transmission Tariffs between
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
29th April 2014 Teleconference
4th October 2016 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
29th November 2016 Teleconference
12th December 2014 Teleconference
Gas Regional Initiative South South-East
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
ERGEG comment to KEMA study on Art. 3 and 7
Gas Regional Initiative South South-East
Presentation transcript:

1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011

2 Work Plan : elaboration process. South GRI Work Plan » Carried out within the established deadlines, following EC request; » Based on previously approved Action Plan ; » Submitted to public consultation, with high participation and involvement from stakeholders.. 13 July - Final Work Plan submitted to EC and ACER.

3 SGRI Work Plan : priorities Main priorities, actions and deadlines:. Capacity allocation (CAM) » Open Subscription Procedures (OSP) for short term capacities (annual); » Joint mechanisms (CAM FG-NC pilot testing) starting from PT-SP (Jan. 2012); » Analysis of Virtual Interconnection Points; » Set up a TSOs Common Allocation Platform (Dec. 2014).. Congestion management (CMP) » Design of a CMP pilot project in the interconnection FR-SP (Jan. 2012); » Extension of this coordinated CMP mechanism to SP-PT (Jan. 2013).. Investment – Ten-Year Network Development Plans » Follow-up of project status from Open Season FR-SP (biannual); » Input from NRAs and TSOs to Community-wide TYNDP (Jan. 2013); » Elaboration of Regional Investment Plans (GRIPs) by TSOs (biannual); » Evaluate need for new infrastructure with market mechanisms and other factors (permanent).

4 Main priorities, actions and deadlines:. Balancing » Contribute to the elaboration of FG-NC (permanent); » Investigate the use of the gas markets for balancing purposes (Jun. 2013); » Analyse the current balancing zones and possible integration (Dec. 2013); » Pilot project for a common balancing platform (Dec. 2014).. Tariffs » CNE-ERSE joint study on tariff regimes in Spain and Portugal (Dec. 2011); » Further studies to evaluate tariff structures (Dec. 2012).. Interoperability » Contribute to the development of FG and NC (permanent); » Analysis of interoperability aspects that need to be harmonised (Jan. 2014); » Harmonisation of gas-day, communication protocols, quality standards, programming and nomination schedules (Dec. 2014). SGRI Work Plan : priorities

5 Main priorities, actions and deadlines:. Implementation of the 3 rd Package - Transparency » Supervision of implementation of transparency provisions in Regulation 715/2009/CE, for transmission, LNG and storage (Dec. 2011).. Developing hub-to-hub trading in the South region » Debate on the Gas Target Model within the SGRI (permanent); » Hub development: promotion and endorsement of organised gas markets (hubs) (Dec. 2013); » Final goal: contributing to a true hub-to-hub gas trading in the region (Dec. 2014). The Work Plan includes a timeline table with detailed deliverables, deadlines and responsibilities for each priority SGRI Work Plan : priorities

6 Final remarks. The Work Plan developed by regulators is widely supported by operators and stakeholders;. Participative and transparent elaboration process;. Contents much in line with priorities at EU level;. Detailed timetable of actions and deliverables;. TSOs already working on first priorities (CAM, CMP, Regional Investment Plans);. Implementation following EU developments (Framework Guidelines and Network Codes) will be key.

7 Thank you for your attention