Assessing the feasibility of reestablishing ecosystem processes on the Mississippi River in the Twin Cities, Minnesota Christian Lenhart 1, John L. Nieber.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

Washington Department
Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
Moffatt Thomas Lower Boise River Wetlands Restoration Project Sponsor:Pioneer Irrigation District Presenter: Scott L. Campbell Legal Counsel for Pioneer.
Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
Marylands Approach to Success Stories Presented to the Region III States Meeting May 12, 2009 Presented by Jim George.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
City of Tybee Island 2007 Master Plan Summary Report Area Character Maps and Area Development Recommendations.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Chattahoochee River Restoration Aquatic Ecosystem Restoration City Mills Dam Eagle and Phenix Dam.
Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
Nebraska Department of Environmental Quality TMDLs 101 An Explanation of the Federal Clean Water Act’s TMDL Requirements and How they Impact Carter Lake.
© Mark Godfrey Brian Richter, Director Global Freshwater Program © Insert Image Credit Environmental Flows for People and Nature.
1 Floodplain Management Session 13 Biology Management and restoration of floodplain ecology Prepared by Susan Bolton, PhD, PE.
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Hydrology River Ecosystems and Humans. Dimensions of river ecosystems Longitudinal Lateral Vertical Temporal 2.
Mid-Range Water Supply Forecasts for Municipal Water Supplies Matthew Wiley, Richard Palmer, and Michael Miller Department of Civil and Environmental Engineering.
Jordan River Rehabilitation Project March 22 nd /6/20151.
Planning for Restoration of the Mississippi River in the Twin Cities Christian Lenhart.
Ground Water and Ecosystems Restoration Division Assessing the Effectiveness of Restoration Technologies Elise Striz and Joe Williams.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Aquatic Biodiversity Ocean 91% of all water Polar ice caps and glaciers 2.3% Lakes, streams, and rivers 2.8% Rest largely groundwater.
11-4 How Should We Protect and Sustain Wetlands?
Stream Ecology: River Structure and Hydrology Unit 1: Module 4, Lectures 1.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
King County Normative Flow Project Parametrix, King County, Herrera, & Foster Wheeler Normative Flow Studies King County Department of Natural Resources.
Fishery Biology. Fisheries Management n Provide people with a sustained, high, and ever-increasing benefit from their use of aquatic resources n Problems.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Natural Riparian Resources Water Landscape & SoilVegetation.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Stream Processes and Habitat Ryan Johnson. Overview Watershed Processes – Factors and their effects on the watershed as a whole Stream Processes – Factors.
Asian Carp Regional Coordinating Committee [TITLE] [Author] [Date]
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Geography Project Mekong River Yu Qi Xian, Angel 4A(38)
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
River Systems Earth Space Science Mr. Coyle. The Hydrologic Cycle Infiltration = Groundwater System Runoff = Surface Water System Runoff = Precipitation.
Flowing water.  vitally important geologically, biologically, historically and culturally.  contain only 0.001% of the total amount of the worlds water.
Urban Storm Water Runoff and Inland Lakes: A Tale of Two Cities Jarron D. Hewitt and Martin T. Auer Department of Civil and Environmental Engineering,
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Considering Ecosystem Services in Restoration Decisions on the Upper Mississippi River System ACES, 2008 K. S. Lubinski K. Barr J. Barko S. Bartell R.
Setting Goals for Stream “Health:” The Next Generation of Watershed Plans? The Waterlands Group San Francisco Estuary Institute Aquatic Science Center.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Estimating the Volume of Fine-Grained Sediments Behind Four Low-Head Dams, Kalamazoo River, Michigan. In cooperation with the Michigan Department of Environmental.
Fran Dunwell Hudson River Estuary Coordinator Hudson River Estuary Program/NYSDEC.
Pam Jeane Deputy Chief Engineer- Operations Sonoma County Water Agency Habitat Enhancement and Water Delivery.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Ecosystem Management Chapter 5. Shifting management n Fisheries management is shifting from commodity production of single resource to management of whole.
Kansas Streambank Database Erika Stanley Kansas Water Office March 16, 2016.
The Boardman: A River Reborn Removing Dams for a Free Flowing River.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
Physical Controls on Hyporheic Flow By Randy Goetz
Ecohydrological Restoration Structure and Function
Savannah River Projects
Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž
Little Rapids Habitat Restoration St
Watersheds and Hydrology
Watershed Literacy & Engagement
Streams Hydrodynamics
River Kokemäenjoki – Flood risk management & WFD
Water Supply Planning for the Twin Cities Metropolitan Area
Longitudinal Profile Survey for Successful Culvert Replacement
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

Assessing the feasibility of reestablishing ecosystem processes on the Mississippi River in the Twin Cities, Minnesota Christian Lenhart 1, John L. Nieber 1 and Lucius Jonett 2 1 Bioproducts and Biosystems Engineering Department, University of Minnesota 2 Department of Landscape Architecture, University of Minnesota The Twin Cities reach of the Mississippi River was historically industrially dominated. Yet with increasing recreational usage an evolving economics of the Twin Cities there is growing interest in recreational, aesthetic and ecological uses of the river. The City of Minneapolis has proposed to close its upper harbor to barge traffic, creating opportunity for restoration of ecological, historic, aesthetic and recreational features. This study will provide a synthesis of existing and past work on restoration and management activities within the river (not watershed management) between Coon Rapids Dam and St. Paul (above Pool 1, within Pool 1 and upper Pool 2). Gaps and opportunities for restoration of ecological, socio-economic and aesthetic services have been identified. A preliminary assessment of the feasibility of these actions will be provided. Promising strategies wil be identified for more detailed analysis and implementation. Project Background and Purpose Physical processes Large river restoration and management issues Ecological processes Fish and mussel dispersal and passage Gaps analysis of existing study Lack of in-river work in Pool 1 and above to Coon Rapids Dam Improvement of fish and mussel passage to Pool 1 Structural focus over process Ecological restoration and watershed management has been done outside of the floodprone area. Review and synthesis of existing restoration and management work Water quality and TMDLs Total Maximum Daily Load studies have created the necessity of reducing sediment and nutrient loads and baccteria levels. Lake Pepin, a dowsntream natural “lake” on the Mississippi is imparied for turbidity while many reaches in and near the metro area are listed for bacteria. TMDLs may drive water quality improvemetns within the study area of Pool 1 and 2. Hydrologic processes: water level drawdown Prior to construction of the Ford and Lower St. Anthony Falls dams, water levels varied greatly on the Mississippi River. Seasonal drawdown could promote wetland revegetation in certain reaches and whitewater recreation in the spring below St. Anthony Falls. The Mississippi River below St. Anthony Falls (above) was a unique high gradient, boulder/cobble habitat providing excellent habitat for fish and mussels. It was one of Minnesota’s major tourist site in the 1800s. The falls and rapids were modified for hydropower and milling in the late 1800s and for barge traffic in the 1960s. Aesthetic improvements could enhance the area today, still a major destination for local residents and tourists. Processes of island formation were halted in Pool 1 via inundation and dredging for maintain the 9 foot channel for barge traffic Streamflow has changed over time, making more water available for hydropower dfdf Social, economic and aesthetic Project Examples Recreation – seasonal whitewater run in April-May Aesthetics – Use visual assessment procedure (Mullan 2009), St. Anthony Falls Economic – changing economics of cities; true cost-benefit analysis Sediment Transport was altered by the dams, creating large deposit of sediment behind Ford Dam, in Pool 1. Sediment inhibits habitat restoration options though combinations of dredging and water level variation could remove some of the sediment wedge. Dredged materials could be used to re- establish islands under appropriate physical and socio-economic situations. Social processes – re-establish gathering points, points of access along river. Many local government and non-profit organizations, including the National Park Service’s, Mississippi National River Recration Ara Aesthetics- management for aesthetic concerns rather than industrial/ economic only Economic – changing economics of cities; true cost-benefit analysis Fish passage improvements at Ford Dam would allow Lake Sturgeon and other gravel-spawning fishes to access one of the largest cobble/boulder beds on the Mississippi below St. Anthony Falls Pool 1 has excellent mussel habitat and is located next to the St. Croix river, a mussel biodiversity hotspot. The edangered Higgins Eye mussle recently re- establishing in Pool Reichardt 1857 Feasibility assessment The assessment of feasibility of rehabilitation and management actions was based on 3 aspects:  Physical constraints – hydrology, geomorphology, permanent alterations to river  Ecological issues – ecosystems processes; fish and mussel habitat; connectivity longitudinally and laterally  Socio-Economic constraints – industrial and energy uses; river recreation; tourism; aesthetics Most direct stream restoration work has been on small streams, < 1000km 2 in drainage area. Large scale rivers have different ecological, geomorphic, and socioeconomic processes at work Requires focus on process over structures Channel-floodplain processes are important for ecological connectivity and sediment deposition Ecological: big rivers such as the Mississippi are often regional centers for aquatic biodiversity of fish and mussels Socio-Economic: large rivers are often hubs of commerce and tend to have much historic and cultural importance Photo by Minnesota Historical Society (1890s prior to lock and dam projects) Processes of island formation could be re- stablished in some locations above and below Pool 1. Within Pool 1, island re-establishment would be more challenging, though a large sediment supply exists for use in island seeding.