North Coast Surety 1 Welcome to Bid List Connection Slide Show presentation to explain how data can flow in the bidding process. To view the slide show.

Slides:



Advertisements
Similar presentations
Instruction: Use mouses left button. Use mouses left button. If mouse buttons dont work, use arrow keys of keyboard for slide show. If mouse buttons dont.
Advertisements

Instruction: Use mouses left button. Use mouses left button. If mouse buttons dont work, use arrow keys of keyboard for slide show. If mouse buttons dont.
NXT Wheel Spider Building Instructions MAXA ROBOTICS 2011.
Numbers 1-20.
People QuickBooks Lesson One Getting Started. Intuit Proprietary & Confidential Lesson Objectives To gain an overview of the course and the topics to.
The Little Monsters’ Song. How many monsters can you see?
Sixteen Squared. 256 One Squared 1 Three Cubed.
Multiplication Facts 9 through x 5= 50 Number One.
We count one, two, three….
HundredsTensOnes 111 HundredsTensOnes 152 HundredsTensOnes =143.
Centralized Bidder Inquiry System An example of a sample project inquiry.
North Coast Surety 1 Welcome to Bid List Connection Slide Show presentation to explain how a bond might get processed in the bidding process. This explanation.
Navigate to the User Control Panel Click on User Control Panel Site:
Lecture 9: Default Settings in Open Office Temple College English Department.
North Coast Surety 1 Welcome to Bid List Connection Slide Show presentation to explain how XML works, in English. The technological complexities are not.
The Cardinal Numbers Study target
Numbers.
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Required Trainings Cornerstones of Confidentiality Health Insurance Portability and Accountability Act (HIPAA) Information Security Training (IST) Program.
E-Cert Version 2 A Presentation by Maggie Chilton for a Chamber of Commerce.
To navigate through this Tutorial use your mouse, or Page Up key or Page Down key Registration Tour Unlock the “POWER” of V7.2 Introduction Slide One.
Checkout Options Tour Unlock the “POWER” of V7.2 To navigate through this Tutorial use your mouse, or Page Up or Down Key Introduction Slide One.
COSAPI ENGLISH TRAINING PROGRAM Conducted by: Marco Loyola Florián Basic Group Class 6
Global Human Hepatitis B Immunoglobulin Industry 2015 Market Research Report Website : No of Pages: 167 Published: October 2015 Single.
Global Potassium Citrate Industry 2015 Market Research Report Website : No of Pages: 167 Published: October 2015 Single User PDF: US$
Maths Level 1 Week 2 Day 2. Today! Morning: – Starter: Alphabet Spaghetti – Tutorial: Add and subtract decimals up to 2 decimal places – Break – Tutorial.
Numbers ZERO 0 ONE 1 TWO 2 THREE 3 FOUR 4 FIVE 5.
Animals we love. 11 eleven Do you remember these numbers?
It is a new ___ for you, Lydia. Is the book on the_____? Look, what are these/those? Oh, I like this_______, It is______. I like your__ ! Let’s find.
Grade 2 Unit 2. Saudi Arabia Saudi Arabia ㄕㄚ ㄨ ㄉㄧ ˋ ㄚ ㄌㄚ ㄅㄛ ˊ - many camels - many desert areas.
Unit 6 How many?.
Dept user Logs in from Home Page for tender creation Login with user name and password.
GLOBAL CONCRETE PIPE INDUSTRY 2016 MARKET RESEARCH REPORT Published – Aug 2016 Complete Report concrete-pipe-markethttp://
GLOBAL DIGITIZER INDUSTRY 2016 MARKET RESEARCH REPORT Published – Aug 2016 Complete Report market.
GLOBAL OIL PRESS INDUSTRY 2016 MARKET RESEARCH REPORT Published – Apr 2016 Complete Report press-markethttp://
Task 2f – part a Prove that you can receive an WITH an attachment, open it AND save the attachment to your user area. Open the with the attachment.
Telling Time.
Primary Longman Elect 3A Chapter 3 Numbers
Unit 4 / Lesson 2 Shopping List. Unit 4 / Lesson 2 Shopping List.
Place Value II By Monica Yuskaitis.
1 - one 2 - two 3 - three 4 - four 5 - five 6 - six 7 - seven
Numbers Let's recap !.
Place Value II.
Numbers.
What time is it? or What’s the time?.
We count one, two, three….
Numbers 1 2 one two 3 4 three four.
TWO MINUSES MAKE A PLUS (and other stories)
Creating a Customized List of Classes Using Microsoft Access 2000®
Look at the clock. Thirteen One Fourteen Two Fifteen Three Sixteen
May 25, Week Thirty-Two May 18, Week Thirty-One.
Counting Chart: Numbers 1 to 100
1 ONE 2 TWO.
Primary Longman Elect 1B Chapter 4 Numbers 11–20.
March 10, Week Twenty-Two March 3, Week Twenty-One
  or 0. 1 one tenth.
Number word cards months
DEFINITIONS.
Thirty-six eighty thirty fifteen ten seventeen Forty-seven Forty-one
Numbers
September 14, Week Two September 7, Week One.
Numbers and Number Names 0-20
HOW TO TAKE MONTHLY REPORT OF ATTACH VEHICLE
Look at the clock. Thirteen One Fourteen Two Fifteen Three Sixteen
STRIKE THE NUMBER! PLAY.
MATHS TIME! nine ten eleven fifteen eight
September 14, Week Two September 7, Week One.
Odd and Even Numbers.
+/- Numbers Year 1 – Addition and subtraction within 20
Presentation transcript:

North Coast Surety 1 Welcome to Bid List Connection Slide Show presentation to explain how data can flow in the bidding process. To view the slide show the press the left mouse button or the arrows keys on your keyboard to proceed through the slides.

North Coast Surety 2 This is Part II is a series, and viewers should be acquainted with parts I to understand what XML is Owner Contractor Surety Agent Surety Company Data Flow To view the slide show the press the left mouse button or the arrows keys on your keyboard to proceed through the slides.

North Coast Surety 3 Owner Contractor Surety Agent Surety Company The owner currently publishes the basic project data in a trade journal, and some also publish on their websites. Either way the contractor enters the data into the application they use to assemble the bid. Examples would be excel, lotus, or various estimating software. Caltrans is one owner that uses their website for posting upcoming bids and will be sued as our example.

North Coast Surety 4 Caltrans Contractor Step One Contractor logs onto Caltrans site and locates a project they are interested in bidding

North Coast Surety 5 Caltrans Contractor | List of Bid Items | Special Provisions | Download aecXML Bid File Roadway To Be Constructed With Asphalt Concrete Over Asphalt Treated Permeable Base And Aggregate Base And, Subbase And, Concrete Box Girder Bridge To Be Constructed. 01-Men /14.8 * Date Advertised 4/2/2001 Bids Opening in Sacramento * Bids Open 5/22/2001 Estimate: $15,478,000 In Mendocino County Near Hopland From 0.2 Km South Of Pieta Creek Bridge To Russian River Bridge. 300 Working Days * 10% DBE * Cost per set: Bidders: $38, Non-Bidders: $31. Step Two Caltrans adds to their site the option of downloading the project data in an industry standard XML format Actual project listing from Caltrans site

North Coast Surety 6 Caltrans Contractor | List of Bid Items | Special Provisions | Download aecXML Bid File Roadway To Be Constructed With Asphalt Concrete Over Asphalt Treated Permeable Base And Aggregate Base And, Subbase And, Concrete Box Girder Bridge To Be Constructed. 01-Men /14.8 * Date Advertised 4/2/2001 Bids Opening in Sacramento * Bids Open 5/22/2001 Estimate: $15,478,000 In Mendocino County Near Hopland From 0.2 Km South Of Pieta Creek Bridge To Russian River Bridge. 300 Working Days * 10% DBE * Cost per set: Bidders: $38, Non-Bidders: $31. Step Three Contractor selects the download option and selects “save this program to disk”. Actual project listing from Caltrans site Project Name.XML from

North Coast Surety 7 Caltrans Contractor | List of Bid Items | Special Provisions | Download aecXML Bid File Roadway To Be Constructed With Asphalt Concrete Over Asphalt Treated Permeable Base And Aggregate Base And, Subbase And, Concrete Box Girder Bridge To Be Constructed. 01-Men /14.8 * Date Advertised 4/2/2001 Bids Opening in Sacramento * Bids Open 5/22/2001 Estimate: $15,478,000 In Mendocino County Near Hopland From 0.2 Km South Of Pieta Creek Bridge To Russian River Bridge. 300 Working Days * 10% DBE * Cost per set: Bidders: $38, Non-Bidders: $31. Step Four Contractor saves the downloaded file in the directory they have selected to hold downloads. Actual project listing from Caltrans site Project Name.XML from

North Coast Surety 8 Caltrans Contractor Step Six Contractor logs out of Caltrans site

North Coast Surety 9 Step Seven Contractor logs onto Bid List Connection (or any other program that can process an XML transaction)

North Coast Surety 10 Step Eight Contractor selects “My Bid List”

North Coast Surety 11 Step Nine Contractor enters their user name and password

North Coast Surety 12 Step Ten Contractor can edit existing bid list entries or…

North Coast Surety 13 Step Eleven Contractor creates a new project

North Coast Surety 14 Step Twelve Contractor selects “Import Project Data”

North Coast Surety 15 Step Thirteen Contractor selects downloaded “Project Name.XML” file

North Coast Surety 16 Step Fourteen Contractor imports the data from the file and completes the remaining fields in the project information panel

North Coast Surety 17 Step Fifteen Contractor sends electronic bid request to surety agent, with digital signature Owner Contractor Surety Agent Surety Company

North Coast Surety 18 Step Sixteen Surety Agent receives from Contractor with XML file attachment Surety Agent from contractors company information Project name from project information

North Coast Surety 19 Step Seventeen Surety Agent Imports XML file attachment and processes the bid request. Owner Contractor Surety Agent Surety Company

North Coast Surety 20 Step Eighteen Surety Agent sends XML transaction to Caltrans. Owner Contractor Surety Agent Surety Company

North Coast Surety 21 End Step Nineteen Caltrans verifies Bond Beginning