CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
PAC June LHC Machine Protection Rüdiger Schmidt R.Assmann, E.Carlier, B.Dehning, R.Denz, B.Goddard, E.B.Holzer, V.Kain, B.Puccio, B.Todd, J.Uythoven,
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Preconditions for operating at 5 TeV in 2010 Session th January 2010 J. Wenninger BE/OP How to safely reach higher energies and intensities? Settings.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Overview of Machine Protection for the LHC
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
B. Todd et al. 25 th August 2009 Observations Since v1.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
The LHC from commissioning to operation Mike Lamont for the LHC team.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
BT AB/CO/MI 18 th September 2007 Safe Machine Parameters Chassis.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Hand-shake Signals Between LHC Machine and Experiments
Setup beam intensities for FCC-hh
Introduction SMP = Safe Machine Parameters
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
LHC Morning Meeting - G. Arduini
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Beam Dump and Injection Inhibits
Summary Thursday h21: Stable beams fill #1303.
LHC dry-runs (BE-BI view)
Wednesday Ramp single nominal bunches for loss maps
Machine Protection System Commissioning plans
Thursday Fill 1364 (24 bunch) dumped at 07h
1v1.
Tuesday morning 08:30-09:00 Squeeze with probe.
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Interlocking strategy
LHC Morning Meeting - G. Arduini
What systems request a beam dump? And when do we need them?
Presentation transcript:

CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator status information… Uses it to generate flags and values… Transmits it to areas of the accelerator complex… *fast *safe *reliable *available

CERN Machine Protection – A Future Safety System? Safe Machine Parameters

CERN Machine Protection – A Future Safety System? Safe Machine Parameters

CERN Machine Protection – A Future Safety System? Safe Machine Parameters

CERN Machine Protection – A Future Safety System? Safe Machine Parameters

CERN Machine Protection – A Future Safety System? Safe Machine Parameters

CERN Machine Protection – A Future Safety System? Safe Machine Parameters LHC - 1 Connect Energy – Access IR6 ½ day + N. Voumard LHC - 2 Connect Intensity – Access IR4 ½ day + M. Ludwig LHC - 3 Connect Beam Presence Flags – Access IR4 ½ day + M. Gasior LHC - 4 Connect Timing ½ day + J.-C. Bau LHC - 5 Connect Software Interlocks and Squeezing Factor ½ day + J. Wenninger LHC - 6 Moveable Devices and Stable Beams – ramp to physics, squeeze, no beam LHC - 7 Beam Presence Flag Limit – scrape a beam LHC - 8 Setup Beam Flag – set-up beam, ramp through transition SPS - 1 SPS CNGS / LHC / HiRadMat Cycle Flags – cycling SPS needed ½ day + B. Puccio SPS - 2 SPS Probe Beam Flag – circulating Probe Beam SPS - 3 SPS Setup Beam Flag – circulating Setup Beam SPS - 4 SPS Nominal – circulating “not-setup” beam