May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

JUSTIFY. Methodology for Measuring NaviGAtor ITS Performance ITS Georgia Annual Meeting 2010 Presented By: Prasoon Sinha, P.E, PTOE Department Manager,
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Hardin County Engineering Department September 12, 2006.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
SR A1A / SR 200 Reconstruction Project
SAFETY FUNDING APPLICATION STA STA-62 & Harrisburg/Middlebranch and Harrisburg Rd & 30 th St. Safety Improvements.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Safety and Design National Technical Services Team 1 Systematic Approach to Intersection Safety May 11, st Annual Missouri Traffic and Safety Conference.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
The Roads Ahead Leroy D. Alloway, Director Community Development.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
County of Fairfax, Virginia 11 Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17,
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Maryland at Edgerton Channelization  Maryland Avenue – Ramsey County Roadway  ADT 20,000 plus  Maryland/Edgerton Intersection in top 10 Citywide for.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
1 CEE 763 Fall 2011 Topic 3 – Safety Management Process – Other Steps CEE 763.
Imagine the result I-10 Speed Study Update Akhil Chauhan Thomas Montz ARCADIS Statewide Traffic Engineers Meeting June 26, 2012.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
Transportation Projects City Council Workshop May 14, 2013.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
Oregon’s All Roads Transportation Safety (ARTS) Program Zahidul Siddique, Ph.D., PE, PTOE Oregon Department of Transportation October 26, st International.
MED SR 18 Corridor Project MED PID October 13, 2015.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Visit Our Website at: Click to edit Master title style.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Pioneer Road Relocation and Reconstruction Project
us 30 and SR 603 – Ashland county September 7, PUBLIC meeting
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Chapin Town Hall Meeting
District 6 – Safety Applications
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Florida Department of Transportation
ROUNDABOUTS Improving Safety and Efficiency
Double Crossover Diamond Interchange
Using CMFs in Planning for Virginia’s Project Funding Prioritization
Contract 60X10 Informational Meeting Weber I-55
Parks Highway Reconstruction: Lucas Road to Big Lake Road
Clark County, WA Safety Management Program
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project

SAFETY STUDY PRESENTATION PROJECT LOCATION & DESCRIPTION Tallmadge Road Corridor Parliament Drive to Sunnybrook Road Distance – 1.1 Miles Approximate ADT – Opening Year 2019 – 15,940 Certified Traffic Obtained & Used for Analysis (Certified at 0% Per Year Growth)

POR – Tallmadge Road Corridor Study Area SAFETY STUDY PRESENTATION

REGIONAL PRIORITY The Congestion Management Process Study published by AMATS in July 2012 lists Congestion Reduction Strategies for various intersections. Listed below is the strategy for the study corridor: I-76 / Tallmadge Road / Mogadore Road Interchange – Reconfigure Interchange. This is the highest crash corridor in Portage County (80 Crashes). Next Closest area is the State Route 59 corridor near the State Route 261 intersection (68 crashes). SAFETY STUDY PRESENTATION

CRASH ANALYSIS SUMMARY 80 Crashes Reported in Study Area from 2010 – Rear-end 10 Angle 8 Left Turn 7 Sideswipe - Passing 5 Fixed Object 4 Other Non-Collision 3 Sideswipe – Meeting *Note the High Number of Rear-End Crashes

SAFETY STUDY PRESENTATION CRASH ANALYSIS Much Higher than Average Rear-End Crashes Inefficient Cluster Signal Operation at I-76 WB Exit Ramp / Mogadore Road / Tallmadge Road Intersection Non-Traditional Interchange Geometrics at I-76 / Tallmadge Road Interchange Conclusion – Congestion Related Crashes Resulting from Inefficient Operations in Study Area

SAFETY STUDY PRESENTATION CRASH ANALYSIS I-76 WB Exit Ramp / Mogadore Road / Tallmadge Road Intersection

SAFETY STUDY PRESENTATION LOOKING EAST ON MOGADORE ROAD (WEST)

SAFETY STUDY PRESENTATION CRASH ANALYSIS

SAFETY STUDY PRESENTATION LOOKING SOUTH ON MOGADORE ROAD (WEST) AT THE I-76 EB EXIT RAMP

SAFETY STUDY PRESENTATION CRASH ANALYSIS

SAFETY STUDY PRESENTATION LOOKING WEST ON TALLMADGE ROAD AT I-76 EB RAMPS INTERCHANGE

SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT

SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 6 Acres Site Trips: 500 Daily Trips

SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 127 Acres Site Trips: 15,810 Daily Trips

SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 48 Acres Site Trips: 2,820 Daily Trips

SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 72 Acres Site Trips: 3,960 Daily Trips

SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Total Developable Acres: 253 Acres Total Site Trips: 23,090 Trips

SAFETY STUDY PRESENTATION PROPOSED COUNTERMEASURES Eliminate both Mogadore Road junctions with the I-76 Exit Ramps to Remove the Mogadore Road / Ramp Overlap Sections Relocate / Reconstruction Mogadore Road (West) to tie into Existing East End Welding Cul-de-Sac Mogadore Road (East) and Reroute all Traffic to Sunnybrook Drive Reconstruct the Traffic Signal at the Reconfiguration Intersection of Tallmadge Road / I-76 WB Ramps. Construct a Traffic Signal at the Newly Created Intersection of Tallmadge Road / Mogadore Road Convert the I-76 / Tallmadge Road Interchange from a Tradition Diamond Interchange Into a Diverging Diamond Interchange Interconnect the Traffic Signals Along the Tallmadge Road Corridor to Form a Coordinated Signal System

SAFETY STUDY PRESENTATION PROPOSED IMPROVEMENT

SAFETY STUDY PRESENTATION VACANT PROPERTY ON SE CORNER OF TALLMADGE ROAD / I-76 EB INTERSECTION

SAFETY STUDY PRESENTATION SYNCHRO MODELS Improved Interchange (Traditional) DDI Interchange

SAFETY STUDY PRESENTATION OTHER DIVERGING DIAMOND INTERCHANGES I-270 / Roberts Road Interchange in Columbus, Ohio Opened in Fall of 2013 Seven Total Crashes Between October 26 th and December 31 st, 2013 S.R. 4 / U.S. 68 Interchange in Lexington, Kentucky Opened in Fall of 2011 Two Years Before Opening vs. Two Years After Comparison:  47.8% Reduction in Total Crashes at Interchange  60.9% Reduction in Injury Crashes at Interchange

SAFETY STUDY PRESENTATION LEXINGTON KENTUCKY DDI

SAFETY STUDY PRESENTATION LEXINGTON KENTUCKY DDI

SAFETY STUDY PRESENTATION PROJECT COST ESTIMATE AND RATE OF RETURN Total Cost Estimate of All Improvements, Right-of-Way, Construction and Construction Inspection: $7,364,575 Benefit to Cost Ratio on Project: 0.75 Total Safety Funding Request: $4,350,000 Benefit to Cost Ratio on HSP Funding Request: 1.01

SAFETY STUDY PRESENTATION CURRENT PROJECT FUNDING PLAN * Local Funding will be Comprised of Funds from Portage County, the City of Tallmadge, Brimfield Township and OPWC Issue I Funds Safety Funding Request:$4,350, % Future AMATS / CEAO Request:$2,024, % Funding Type Dollar Amount % of Total Total Project Funding:$7,364,575 Local Funding:$989,581*13.4%

SAFETY STUDY PRESENTATION PROPOSED IMPROVEMENT COUNTERMEASURES

SAFETY STUDY PRESENTATION CORRIDOR SAFETY STUDY QUESTIONS MICHAEL A. HOBBS, P.E., PTOE GPD DIRECTOR OF TRAFFIC ENGINEERING MARK R. GROSSMAN, P.E. GPD CHIEF HIGHWAY ENGINEER RYAN M. GILLESPIE, P.E., PTOE GPD TRAFFIC ENGINEER CURTIS J. DEIBEL, E.I. GPD TRAFFIC ANALYST ANTHONY ZUMBO, P.E., P.S. PORTAGE COUNTY PROJECT MANAGER