The Multi-Site RAM Experience Norm Rabin Senior Quality Manager, Calibration Roche Diagnostics, Indianapolis.

Slides:



Advertisements
Similar presentations
Upgrading from Calibration Manager to Blue Mountain RAM
Advertisements

Compliance From The Ground Up September 18, 2013 Earlene Gibbons Director, Operational Technology.
MICHAEL MARINO CSC 101 Whats New in Office Office Live Workspace 3 new things about Office Live Workspace are: Anywhere Access Store Microsoft.
Visual Scripting of XML
VValidation of Shipping Paper against the regs CCarrier & State Variations AAddress Book TTwo-Year History of Shipments DDiagram of box for.
Bill Clark Manager, Seattle Facilities & Engineering Space Planning, BMRAM System Owner.
Deploying GMP Applications Scott Fry, Director of Professional Services.
Tracer Call Center Recording and Quality Assurance.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Mobile Resource Manager v2. Core Pillars  Engine - High fuel costs, vehicle maintenance  Productivity - Customers expect increasing levels of service.
Regulatory Compliant Performance Improvement for Pharmaceutical Plants AIChE New Jersey Section 01/13/2004 Murugan Govindasamy Pfizer Inc.
Integrity - Service - Innovation Enterprise Risk Management for the Federal Government – Where’s the Value? Donna Davis Defense Finance and Accounting.
Validata Release Coordinator Accelerated application delivery through automated end-to-end release management.
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Lean Operations for Water and Wasterwater Controlling Cost While Improving Efficiency… A Real World View.
Microsoft Visio is diagramming software for Microsoft Windows. It uses vector graphics to create diagrams. The 2007 Standard and Professional editions.
Enterprise Risk Management in DHHS
1 Copyright © 2014 PPM 2000 Inc. SINGAPRORE, AUGUST 2014 Denis O’Sullivan, CPP INCIDENT MANAGEMENT TECHNOLOGY CHALLENGES.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Getting the Most Out of Blue Mountain RAM
Chapter 16 Maintaining Information Systems
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 18 Maintaining.
Click to add text © 2010 IBM Corporation OpenPages Solution Overview Mark Dinning Principal Solutions Consultant.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Spreadsheet Management. Sarbanes-Oxley Act (SOX, 2002) Requires “an effective system of internal control” for financial reporting in publicly- held companies.
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 August 15th, 2012 BP & IA Team.
Internal Auditing and Outsourcing
DRAFT Richard Chandler-Mant – R Consultant The Challenges of Validating R Managing R in a Commercial Environment.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
A Balancing Act Between Risk Appetite and Risk Tolerance Federal Information Systems Security Educators’ Association Conference March 2005 Ezra Cornell.
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
System Analysis and Design
Maintaining Information Systems Modern Systems Analysis and Design.
Quality Assurance Program Presenter: Erin Mustain 1.
Serena Project Case Study Sapphire, Atlanta April 23, 2007.
2011 AMC INSTITUTE COMMUNITY CONFERENCE “ACCREDITATION - IT’S ALL ABOUT BEST PRACTICES” Suzanne C. Pine, CAE AMC – National Accounts, PCVB AMCI Accreditation.
MERCURY BUSINESS PROCESS TESTING. AGENDA  Objective  What is Business Process Testing  Business Components  Defining Requirements  Creation of Business.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 3 Slide 1 Chapter 16 Maintaining Information Systems.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
1 Implementing Monitoring and Reporting. 2 Why Should Implement Monitoring? One of the biggest complaints we hear about firewall products from almost.
 PBMA-KMS deployed in March of 2001 is the first fully operational NASA-wide multi-functional Knowledge Management System  Knowledgebase 200+ Best Practices.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 18 Maintaining.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation 21 CFR Part 11 Support for CS1000/3000.
The Right Choice for Call Recording Strategic Value for Call Centers Tracer Call Center Recording and Quality Assurance.
Compliance Audit Subcommittee Reporting Work Plan Copenhagen, Denmark 6th of May 2010.
HP PPM Center release 8 Helping IT answer the tough questions
SAM for SQL Workloads Presenter Name.
© 2015, Fiatech Size Does Matter Making Big Data Small Case Studies.
State of Georgia Release Management Training
ROI Gains in Blue Mountain RAM Scott Fry, Director of Professional Services September 18, 2013.
AIQ Analytical Instrument Qualification. AIQ – Analytical Instrument Qualification Varian, Inc.’s Analytical Instrument Qualification documentation has.
Page 1 Portfolio Committee on Water and Environmental Affairs 14 July 2009.
Chapter 16 Maintaining Information Systems. Objectives:  Explain and contrast four types of system maintenance.  Describe factors affecting maintenance.
6/13/2015 Visit the Sponsor tables to enter their end of day raffles. Turn in your completed Event Evaluation form at the end of the day in the Registration.
IBM Control Desk Enabling the Enterprise App Store –
Capture This! PO105 James Green. Table of Contents Capture Overview Laserfiche Tools Case Scenarios Questions and Answers.
Blue Mountain Quality Resources, Inc. Global Compliance and Standardization with an Enterprise CMS Jim Erickson, President Blue Mountain Quality Resources,
GLOBAL CAPTURE AND MANAGEMENT OF DATA Devising the solution, delivering the promise proven solutions for creating time in a busy commercial world Corporate.
Test Lab Management and
Automating Accounts Payable
Cisco Compliance Management and Configuration Service
Supporting quality devices
Chapter 18 Maintaining Information Systems
Strategic Value for Profit Centers
Microsoft Implements Your Vision
ולידציה מול כיול-השונה והדומה
Maintaining Information Systems (SAD- 18)
Chapter 16 Maintaining Information Systems
Chapter 18 Maintaining Information Systems
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

The Multi-Site RAM Experience Norm Rabin Senior Quality Manager, Calibration Roche Diagnostics, Indianapolis

Multi-site Advantages Significant Cost Savings/Cost avoidance Improved compliance across sites Easier Validation Improved Reputation with Regulatory Agencies

Multi-Site Can Save This!

WHY UPGRADE TO RAM R3 Add Similar – efficiency Bar Code Search – Efficiency and accuracy Batch Assign – efficiency Improved Audit Trail graphics Linked & Smart Fields – Auto populate Loop and System Assets – Enhanced operations Multiple Windows – efficiency Notification System Pick Lists User Defined Forms – Improved Processes Request Types – Improved Processes

Financial Gaines with RAM Reduction in Operating Budget of ~23% – Facilitates review of intervals for similar instruments – Allows alignment of ranges and tolerances – Provides quick review of extra pint calibrations – Easily indicates inside vs. outside calibrations – Facilitates compliance investigations – Allows improvement plans to reduce OCR events

Cost Savings/Cost Avoidance Multi-site License versus Single-site – One instance of the Software vs. several – One unified set of User and Functional Requirements – One comprehensive application validation vs. several – One configuration vs. several – One process vs. several Maintenance fees less User license fees about the same

Cost Savings/Cost Avoidance Cost of Application Cost of User and Functional Requirements Development Cost of validation plan development Cost of Test Script Development Cost of IQ, OQ, and PQ development and execution Cost of QA documentation package review – The executed OQ was in excess of 1000 pages – The Functional Specification was 217 pages 11”x17”

Multi-Site Points To Consider Maximum savings can be realized with a common configuration Affiliates must meet and drive to a common goal, this will take at least 1 week sequestered Flow Diagram all processes from each site and look for commonality Use Corporate Policy and Standards to drive a compliant and efficient process definition – Define the What and the How rules Be Clear who is validating what! Document this.

Drive for a Common Process

Multi-Site Points To Consider Define the functions and roles – Documentation, Asset Induction, and Change control – Calibration, work execution – Metrology or Quality review – Supervision – Preventive Maintenance – Validation

Teamwork and Division of Labor

Multi-Site Points To Consider Define the RIGHTS for each Role – What actions will each role be allowed to execute in RAM? – The RIGHTS must match the established requirements document and the flow diagram of the processes—where are double checks needed, etc. Try to mimic the current compliant process, avoid creating a totally new process

EXAMPLE OF AN ASSET INDUCTION PROCESS FLOW DIAGRAM

Multi-Site Points To Consider All Stakeholders must be engaged! – Blue Mountain – Each Site (site reps must be empowered) – Quality Assurance – IT Each site must have a Champion! Communicate, communicate, communicate – Distance and lack of engagement is your enemy Forget one of the above and major difficulties will be realized!

The Help May Be Different Than Planned