Superconducting Undulator R&D Review SLAC, LBNL, ANL Jan. 31, 2014 07:00 AM (PST) Kings River Room (B052-306), SLAC or “Go-To-Meeting” teleconference.

Slides:



Advertisements
Similar presentations
LegalMeetings: Recording, Editing & Posting Rachel Medina Leah Peabbles David Bonebrake.
Advertisements

© 2013 Microsoft Corporation. All rights reserved. Schedule a Lync Meeting You can simply schedule an Lync Meeting by using the Outlook add-in for Lync.
Managed Scheduled Ad hoc White Glove.
SCU Development at LBNL Soren Prestemon Lawrence Berkeley National Laboratory Superconducting Undulator R&D Review Jan. 31, 2014.
For presenters and organizers
Created by Office of Distance Education of Learning Technologies.
Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or.
LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
SCU Measurements at LBNL
A Brief Guide to Conducting Virtual IARU Meetings For 24-hour Customer Support, please visit:
We appreciate your patience as our presenters join the webinar. Your meeting today is being hosted by the OFA Grant Review Team. Welcome!
ICT at Work Global Communication.
What is Skype and how do you use it? Before we start, it is a REQUIREMENT of this lesson to have a valid address. If you don’t have one, please.
RETN Campus Managers Region 11 Telecommunications Network.
P. Emma, …for the SCU R&D collaboration: ANL, LBNL, SLAC August 28, 2014 P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC C. Doose, J. Fuerst, Q. Hasse, Y. Ivanyushenkov,
Joining the Meeting When joining a meeting, choose one of the following methods: In the Outlook invitation, click Join online meeting or the meeting link.
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
1 Logistics Collaboration Wiki (Peter Yim, CIM3, and Susan Turnbull, GSA): – bin/wiki.pl?SOAforEGovernment_2007_05_0102http://colab.cim3.net/cgi-
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Doc.: 18-14/0056r00 Submission 20 August 2014 Jay Holcomb, Itron, Inc. Slide 1 Agenda for Teleconference Meeting 20 August 2014.
LCLS-IISC Parameters Tor Raubenheimer. 2 Operating modes keV (120 Hz) keV (100 kHz) keV (100kHz) 4 GeV SC Linac Two sources:
Course Technology Student Navigation Guide. Step 1 – Initial Login Screen ►
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
DCN 6-12/0004r1 Slide 1 IEEE DySPAN-SC WG January 30 th 2012 Telephone Conference Agenda Date: NameCompanyAddressPhone Chen Sun.
LCLS-II Capabilities & Overview LCLS-II Science Opportunities Workshop Tor Raubenheimer February 10 th, 2015.
DCN 6-12/0002r0 Slide 1 IEEE DySPAN-SC WG January 12 th 2012 Telephone Conference Agenda Date: NameCompanyAddressPhone Chen Sun.
The Halton Resource Connection The Halton Resource Connection An Overview of Participating in a THRC Webinar.
Doc.: 18-14/0056r01 Submission 20 August 2014 Jay Holcomb, Itron, Inc. Slide 1 Agenda for Teleconference Meeting 20 August 2014.
Doc.: 18-13/07r2 Submission January 24, 2013 John Notor, Notor Research Slide 1 Agenda for Teleconference Meeting January 24, 2013 Date: January.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Doc.: 18-13/045r0 Submission April 19, 2013 John Notor, Notor Research Slide 1 Agenda for Teleconference Meeting April 19, 2013 Date: March 26,
July 9, 2014 Welcome! Making the Most of WorldCat Discovery The webinar will begin shortly.
Remote / Conferencing Tools – ILP Training. CONFIDENTIAL Virtual Meeting Audio Conferencing Web Conferencing Video Conferencing Virtual meetings use advanced.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Partners in Professional Excellence The Halton Resource Connection (THRC) is a program of The Milton Community Resource Centre (MCRC) In partnership with.
Committee on Earth Observation Satellites Martin Yapur & Anne Kennerley WGISS-41 Canberra, Australia March 14, 2016 WGISS Infrastructure Project (WISP)
Step to join public session - Register 1.View all session in the month. 2.Then select any topic what you’re interested 3.Click any link which you will.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
CSS ONLINE CLASSES GUIDELINES CSS-2017 Sessions Contact: CSS Competition Zone Pakistan.
For Web Events hosted by The Center
GoToMeeting Attendee Guide
FEL SCU development at APS/ANL
Summary of Session: Magnets and undulators for light sources 2
WGISS Infrastructure Project (WISP) Report
Cisco WebEx.
Quick Start Guide for Guest Speakers
Infrastructure Readiness Training January, 2017
Lync Meetings Join a Lync Meeting Lync 2013 Quick Reference
Lync Meetings Join a Lync meeting Schedule a Lync meeting
Lync Meetings Join a Lync Meeting Lync 2013 Quick Reference
SCU R&D Motivation P. Emma …for the SCU R&D collaboration: ANL, LBNL, SLAC Close-Out Review Mar. 3, 2016.
Undulator Tolerances for LCLS-II using SCUs
How to schedule a Webex meeting!
SCUs for the LCLS-II HXR FEL P. Emma July 8, 2014
Presenting a Webex session
LCLS-II-HE FEL Facility Overview
Infrastructure Readiness Training for FY2018 December 12, 2017
UW Trustee Conference Calls
LCLS-II-HE FEL Facility Overview
WGISS Infrastructure Project (WISP) Report
A Cold SCU Phase-Shifter
IEEE DySPAN-SC WG March 08th 2012 Telephone Conference Agenda
WGISS Infrastructure Project (WISP) Report
Lync Meetings Join a Lync Meeting Lync 2013 Quick Reference
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Presentation transcript:

Superconducting Undulator R&D Review SLAC, LBNL, ANL Jan. 31, :00 AM (PST) Kings River Room (B ), SLAC or “Go-To-Meeting” teleconference

SCU R&D Review, Jan. 31, 2014 Superconducting Undulator (SCU) Motivation Using an SCU for the LCLS-II HXR undulator… …allows full performance to 5 keV (SASE & self-seeded) and with m less undulator (or more taper) …has orders of mag. less sensitivity to rad. dose …is much less sensitive to e  emittance (new high-rate gun) …produces very low pressure in a small vacuum chamber (gas scattering at 1 MHz) Schematic of the LCLS-II facility with the new SCRF linac and two new undulators, along with the existing copper (Cu) linac, undulator and experimental halls. The “Cu Linac” is in the 3 rd km of the SLAC tunnel. HXR FEL SXR FEL

SCU R&D Review, Jan. 31, 2014 SCU R&D Plan in Brief ANL… Build 2-m test cryostat (based on existing design at APS) Build & test 1.5-m long NbTi prototype planar undulator ( u = 21.0 mm) LBNL… Build & test 1.5-m long Nb 3 Sn prototype planar undulator ( u = 18.5 mm) Develop and apply shimming to each of the NbTi and Nb 3 Sn cold masses Both Labs… Develop (refine) field measurement and field correction techniques Demonstrate predicted field, field quality, end-field corrections, field measurement and tuning, cold mass fiducialization, and integration of cold mass into cryostat Goal: Within 18 months deliver fully functional SC prototype undulator(s) which meet LCLS-II specifications see presentations on Jan. 31

SCU R&D Review, Jan. 31, 2014 Review Committee and Charge NameInstitute AddressConfirmed Mikael Eriksson, chairMax – 12/18/13 Sara – 12/18/13 David – 12/17/13 Joachim – 12/18/13 Johannes – 01/08/14 Review Committee: Charge to the Committee: 1.Is the SCU R&D plan technically sound, and is it well enough defined in scope, schedule, and cost so as to produce definitive results that can support a baseline design change to the hard x-ray LCLS-II undulator, by May 2015? 2.If the plan appears insufficient, what recommendations can the committee make to improve the chances for supporting a baseline change within 18 months? 3.What further alterations might be made to solidify the plan and move it forward in time or reduce costs?

SCU R&D Review, Jan. 31, 2014 DRAFT Agenda for Jan. 31 Review * (2014) Review Agenda (all times Pacific/SLAC): 07:00 AM (5 min)Welcome and ChargeNorbert Holtkamp (SLAC) 07:05 AM (30 min)SCU Advantages in LCLS-IIPaul Emma (SLAC) 07:35 AM (20 min)Undulator Tolerance EstimatesHeinz-Dieter Nuhn (SLAC) 07:55 AM (50 min)SCU Development at ANLEfim Gluskin (ANL) 08:45 AM (10 min)(break)- 08:55 AM (50 min)SCU Development at LBNLSoren Prestemon (LBNL) 09:45 AM (20 min)SCU Field MeasurementsDiego Arbelaez (LBNL) 10:05 AM (25 min)(executive session)Committee Only 10:30 AM(adjourn)- * Carried out by video conference to save travel. Chairman assembles committee response in writing within 2 weeks (Feb. 14, 2014) Meeting site at (no password needed):

SCU R&D Review, Jan. 31, 2014 Tele-Conference Instructions We will use Go-To-Meeting to connect You don’t need any previous experience Brief instructions will be sent before the meeting (see right side of this slide  ) These will download the software you need You only need a computer (with monitor screen) and a telephone (cell OK) You can swap PC-mic/speakers for phone Call P. Emma if trouble ( ) 1. Please join my meeting. meeting/join/ Use your microphone and speakers (VoIP) - a headset is recommended. Or, call in using your telephone: United States: +1 (213) Germany: +49 (0) Sweden: +46 (0) Access Code: Audio PIN: shown after joining the meeting. Meeting ID: Please join my meeting. meeting/join/ Use your microphone and speakers (VoIP) - a headset is recommended. Or, call in using your telephone: United States: +1 (213) Germany: +49 (0) Sweden: +46 (0) Access Code: Audio PIN: shown after joining the meeting. Meeting ID: We will hold a connection test on Jan. 27 at 08:00 AM (Pacific Time) = 17:00 European Time, if you can attend. I will send a reminder on Jan. 23. You will simply click the blue link at right and dial the telephone (or use your PC microphone & speakers) as also listed at right. We will confirm that all of you can connect. It should be brief and easy. Note country-specific phone numbers (toll free from within country). Note country phone numbers