Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Injection systems W. Bartmann, M. J.Barnes, C. Bracco, E. Carlier, B. Dehning, L. Drosdal, R. Folch, B. Goddard, V. Kain, A. Lechner, F. Loprete, R. Losito,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
R. Assmann - LTC Two Beam Operation R.W. Aßmann with W. Venturini and V. Kain LTC Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
Wednesday 8.9 External crossing angles:
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
SPS extraction, transfer lines, injection
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Monday 18 October : Collimation system
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Injection and Dump Protection
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Status from the collimator impedance MD in the LHC
Scrubbing progress - 10/12/2012
Collimation margins and *
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
Beam dynamics requirements after LS2
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
IP8 aperture measurements (07:30-10:30)
Tuesday 20 September 2011.
Wednesday 23/2 Thanks CRYO!!!.
Another Immortal Fill….
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Presentation transcript:

Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E. Gianfelice-Wendt, B. Goddard, E.B. Holzer, W. Höfle, V. Kain, M. Meddahi, S. Redaelli, J. Uythoven, D. Valuch, J. Wenninger, C. Zamantzas, M. Zerlauth

Outline Comparison of 2010/2011 performance Mitigations in 2011 Potential future injection loss reduction Issues in operation Performance reach for Dec-11, Injection losses

2010 vs 2011 Loss typeLosses in % of dump threshold B1/B2 8b16b24b48b96b144b TCDI shower1/23/54/623/24<50?<75? Uncaptured beam4/212/312/520/8<40?<60? not optimised 12-Dec-11, Injection losses Now we have: 144 b injections (~1.5e11, ~2 um) in normal operation 288 b (1.05e11, um) injected with 30 % of dump threshold

Mitigation techniques Overinjection and MKI failure – Interlocking and good procedure (covered by Chiara) TL showers: – Local shielding between TCDIs and LHC – Beam scraping in SPS (covered by Karel) – Opening TCDIs – BLM sunglasses – Moving/adding TCDIs – Improve stability of MSE (covered by Lene) Uncaptured beam – Local shielding at TDI – Minimisation of capture losses – Injection and abort gap cleaning – Carefully monitoring beam quality in injectors (transv. beam size and shape, bunch length, satellites) – BLM sunglasses 12-Dec-11, Injection losses

B1 TDI MKI Q8 Triplet factor 4 Open TCDI gap: loss shower on LHC BLMs for B1 12-Dec-11, Injection losses

Move/add TCDIs Results of studies by Eliana Gianfelice: – New locations for TCDIs in TI 2 and TI 8 – FLUKA simulations started – impact of Q20 optics to be checked 12-Dec-11, Injection losses6

Local TDI shielding - ALICE 12-Dec-11, Injection losses7 A. Di Mauro, A.L. Perrot, JP. Corso

Capture P. Baudrenghien for the RF team: SPS bucket length is double of LHC bucket due to RF frequency ratio 200/400 MHz MD on reducing injection losses by increasing nominal matched voltage of 3.5 MV to 6 MV (currently in operation) Running with mismatched voltage causes bunch length shrinking after capture  long. emittance blow up needed to reach the aim of 1.2 ns long bunches 12-Dec-11, Injection losses8 Bunch Length Mean and Noise Amplitude during Ramp P. Baudrenghien for RF team

Abort gap and injection cleaning AGC already in 2010 but became more automatised Inj cleaning introduced in 2011, now operational and automatised Main difference wrt safety: injection cleaning has to be calculated on the fly – can be less controlled by MCS 12-Dec-11, Injection losses Effect on luminosity Fixed display for abort gap population Application to improve handling of AGC and IC

BLM sunglasses - background Why sunglasses: Unnecessary beam dumps due to TCDI and unbunched beam shower from outside Aim of sunglasses: Factor 5 margin between injection losses and BLM thresholds for comfortable operation Many options discussed (C. Zamantzas and J. Emery, MPP, 30-Sept-11): – replace certain monitors by LICs and relax thresholds at 450 GeV  no HW modification, certain thresholds constantly higher for 450 GeV – blind out BIS input from certain BLMs while injection via deploying additional energy level, regrouping crates, new monitor flag  need external signal, threshold change only at injection, severe changes to SIS or BLM system 12-Dec-11, Injection losses

BLM sunglasses – LIC solution Potential to increase thresholds of ICs by factor 60 with replacing present ICs by LICs No change to BIS system nor BLM firmware needed List of monitors to be replaced for B1 and B2 identified Procedere: – Replace certain monitors (over Christmas stop) – Start with present thresholds (be sure to be aware of any bad injection) – Define maximum thresholds for LICs – Apply increase of thresholds via monitor factor in case unnecessary dumps limit operation 12-Dec-11, Injection losses

BLM sunglasses B1 12-Dec-11, Injection losses

BLM sunglasses B2 12-Dec-11, Injection losses

Mitigation techniques with expected future gain MITIGATIONPOTENTIAL FUTURE GAIN Local shielding between TCDIs and LHCPresently less gain than expected from simulations; difficult to increase shielding, in particular for TI 8 Beam scraping in SPSNo gain with present emittances, for future bigger emittances probably worse; Opening TCDIsNo gain for TI 2 (already at 5 sig), but possible gain for TI 8 (at 4.5 sig), Machine Protection! BLM sunglassesWith LICs at certain positions and removed filters factor 5 margin possible, Machine Protection! Moving/adding TCDIsPotentially significant gain, under study Improve stability of MSERipple improvement and phase stabilisation in place since 3 days, effect to be checked Local shielding after TDI No gain for inj losses, but ALICE interested to reduce background Minimisation of capture lossesNo gain: trade-off with mismatch and resulting bunch length reduction Injection and abort gap cleaningNo gain: trade off with luminosity Carefully monitoring beam quality in injectors No gain in losses but better detection of bad beam quality early in the chain; Longitudinally already well covered by BQM, transv. can be improved BLM sunglassesWith LICs at certain positions and removed filters factor 5 margin possible, Machine Protection! 12-Dec-11, Injection losses14 TL Shower Uncaptured beam

Operational issues Steering, MKI failure RF loops, monitoring of phase – To be automatised TCLIA losses – not fully understood 12-Dec-11, Injection losses Lower jaw losses Upper jaw losses Asymmetry of grazing losses (+4/-6 sig) seems to be correlated to injection losses on the lower TCTH jaw TCTH losses rather constant for b injections

Performance reach bunches (1.05e11 ppb, um) injected at 30% of thresholds  promising for full SPS batch injection with higher bunch intensities Limit is the time spent for injection - sometimes already difficult for 36, 72 or 144 b How to reduce time spent at injection: – Improve trajectory stability hardware wise – Make steering straight-forward by more sophisticated info in IQC (trajectory at collimators, envelopes for monitors and correctors, intensity dependent and thus easy colour code) – Improve transverse diagnostics of SPS-LHC transfer – Don’t change supercycles in injectors while LHC filling 12-Dec-11, Injection losses

Summary Since 2010 many mitigations put in place which allowed injecting up to 288 bunches this year Ongoing improvements: – MSE stability improvement by EPC – BLM sunglasses – IQC – Transverse diagnostics for SPS-LHC transfer Improvements under study – Moving/adding TCDIs in 2011 there was a lot of work on reducing losses at injection – in 2012 focus on reducing the time spent at injection 2012 set-up time for injection: 4 shifts 12-Dec-11, Injection losses Thank you!