Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Shielding studies at TDIs Results from Rob Appleby – Studies made for P8 (LHCb) – Aimed to look at what shielding can improve Local LHC BLMs LHCb RICH.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
MKI failure event 17-April-11 Recall from logbook: MKI D (1st one seen by the beam) had a real flashover between the two sets of 36b during the 3rd 72b.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Aperture measurements during LHC commissioning 2017
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Beam dump at 03:00:
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
SPS extraction, transfer lines, injection
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Machine availability reaching well over 80%
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Wire almost entirely through beam before BLM triggers dump
Yesterday morning Held 1647 for a while – SPS kicker problem
Machine Protection during Beam Commissioning
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Beam dynamics requirements after LS2
Saturday Nov Stop proton operation. Switch back to ions
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Programme for Friday 9 July
Summary Tuesday h23: Machine closed. Precycle started.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Injection Studies: 50 ns ABT/BTP.
Another Immortal Fill….
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice, B. Goddard, V. Kain, M. Meddahi, A. Nordt, G. Papotti, J. Uythoven, S. Weisz, J. Wenninger LHC Beam Operation Workshop Evian, 7-9 Dec 2010

Outline Observed loss levels at injection Expectations for the future Mitigation techniques Extraction losses - quench limit at Q4 and Q5? Limits for 2011 operation Commissioning strategy for mentioned systems Evian, 7-9 Dec 102Inj/Extr Losses

Losses at injection Loss reasonwhere TCDI cutting transverse beam tailsloss shower on cold elements: Q6,Q7,Q8,MSI Uncaptured beam SPSTDI upper jaw with shower on: TCTVB, MQX, MBX, TCLI Uncaptured beam LHCTDI lower jaw TCTVB, MQX, MBX, TCLI OverinjectionTDI lower jaw, TCTVB, MQX, MBX,… MKI failureTDI upper jaw,… Evian, 7-9 Dec 103Inj/Extr Losses Injected batch Uncaptured LHC beam Uncaptured SPS beam MKI TDI

Losses in injection area – B2 Losses for B2 bunch train injections of: 8 – 16 – 24 bunches Loss peaks in % of dump threshold: Losses from TL shower: 5% at Q7 Losses from TDI shower: 4% at MBX Otherwise less than 1% Evian, 7-9 Dec 104Inj/Extr Losses 23-Oct 10 B2

Losses in injection area – B1 Evian, 7-9 Dec 105Inj/Extr Losses Losses for B1 bunch train injections of: 8 – 16 – 24 bunches Loss peaks in % of dump threshold: 16b injection (bad inj!): 10% at MSIB 6% at Q8 and Q5 24b injection: 12% at MBX 3% at MSIB 23-Oct 10 B1

Losses in injection area – B2 48 b Evian, 7-9 Dec 10Inj/Extr Losses6 Loss peaks in % of threshold: 24% at Q7 8% at TCLIB 5% at MKI Not much time spent optimising beams or injection! 18-Nov 10 B2

Losses in injection area – B1 48 b Evian, 7-9 Dec 107Inj/Extr Losses Not much time spent optimising beams or injection! Loss peaks in % of threshold: 23% at MSIB 20% at MBX 15% at Q8 18-Nov 10 B1

Trying to inject into the AG…no MKI kick abort gap keeper prevents MKI from firing train of 32 bunches is directly dumped on upper TDI jaw Comment from Alice: prepared for 288 bunches impacting on TDI losses from grazing tests on TDI in agreement with simulations 32 bunches onto TDI.4L2 Evian, 7-9 Dec 108Inj/Extr Losses

Expectations on how losses will evolve Assumptions on injected beam intensity progression for 2011 – Max 96 or 108b per injection for operation – Injection Tests with higher intensity – 144b with 50 ns?? – Requirements for ecloud and other studies – 25ns?? Uncaptured beam in LHC – Measurements by Philippe, 30 th Sept 2010: Present dump level at 1e10 per injection (= 3.3e6 p/m) – Limit was originally assumed to 2.6e8 p/m – will be a factor ~100 worse for nominal bunch scheme TCDI shower about linear with intensity increase per injection Evian, 7-9 Dec 109Inj/Extr Losses Loss typeLosses in % of dump threshold B1/B2 8b16b24b48b96b144b TCDI shower1/23/54/623/24<50?<75? Uncaptured beam4/212/312/520/8<40?<60? not optimised

Summary of injection limitations and performance ‘reach’ MKI failure and overinjection – interlocking and good procedure Transverse losses at TCDIs on LHC BLMs – factor 2 intensity increase for operation in 2011 is feasible – factor 6 intensity increase per injection for 288 inj bunches needs loss reduction Uncaptured beam in LHC – already for 2011 operation probably injection cleaning needed – factor 100 loss increase for full nominal injection scheme: several mitigation techniques needed Evian, 7-9 Dec 1010Inj/Extr Losses

Mitigation techniques Overinjection and MKI failure – Interlocking and good procedure TL showers: – Local shielding between TCDIs and LHC – Beam scraping in SPS – Opening TCDIs (machine protection, covered in Verena’s talk) – BLM sunglasses (temporal inhibit of BLM channels) Uncaptured beam – Local shielding after TDI – Minimisation of capture losses – Injection and abort gap cleaning – Carefully monitoring beam quality in injectors (transv. beam size and shape, bunch length, satellites) – BLM sunglasses Evian, 7-9 Dec 1011Inj/Extr Losses

Shielding of TCDIs Evian, 7-9 Dec 1012Inj/Extr Losses 3 problematic TCDIs – TCDIV – TCDIH – TCDIH Shielding with concrete and iron

Shielding of TCDIs Evian, 7-9 Dec 1013Inj/Extr Losses TCDIH MB.A7R8 3 problematic TCDIs – TCDIV – TCDIH – TCDIH.87904

Shielding of TCDIs Vittorio Boccone’s simulations and expectation for loss reduction on cold elements – TCDIV  factor 8 gain – TCDIH  factor 5 gain – TCDIH  factor 4 gain Evian, 7-9 Dec 10Inj/Extr Losses14

Scraping tails Evian, 7-9 Dec 10Inj/Extr Losses15

Scraping tails Non-gaussian tails in transverse plain Evian, 7-9 Dec 1016Inj/Extr Losses Scraping in SPS: deployed and operational no improvement expected

BLM “sunglasses” Options considered: 1.Update of all LHC BLMs with new functionality, but only BLMs in injection regions to receive triggers  impact on all LHC BLMs 2.Add separate new BLM system with new functionality, keep all old monitors for acquisition (increase/disable thresholds at 450 GeV)  additional new BLM system 3.Rearrange/add new BLM system to enter a new BIC with masking capability, with masking of interlock signal triggered by pre-pulse  additional new BIC system 4.Reroute affected BLMs to BIC channel, and introduce a timing system triggered blank of the signal for these channels only  best compromise – no changes to BLM or BIC systems (at FPGA levels) BIC inputs BLM system affected monitors standard monitors time-out switch Evian, 7-9 Dec 1017Inj/Extr Losses implementation urgent for early 2011 – responsible?

Mitigation techniques Overinjection and MKI failure – Interlocking and good procedure TL showers: – Local shielding between TCDIs and LHC – Beam scraping in SPS – Opening TCDIs (machine protection, covered in Verena’s talk) – BLM sunglasses Uncaptured beam – Local shielding after TDI – Minimisation of capture losses – Injection and abort gap cleaning – Carefully monitoring beam quality in injectors (transv. beam size and shape, bunch length, satellites) – BLM sunglasses Evian, 7-9 Dec 1018Inj/Extr Losses

TDI shielding Simulations by Rob Appleby 2m concrete block after TDI Loss reduction on triplet BLMs by a factor 3 On TCTVB only 30% reduction – requires probably more sophisticated shielding Evian, 7-9 Dec 1019Inj/Extr Losses

Minimisation of capture losses No improvement from injectors expected RF voltage reduction as for ions: – was found to create significant satellite population – not planned to be used for p+ Evian, 7-9 Dec 1020Inj/Extr Losses

Injection gap cleaning Bucket 1 Evian, 7-9 Dec 1021Inj/Extr Losses barrier method

Injection gap cleaning Bucket 1 Evian, 7-9 Dec 1022Inj/Extr Losses barrier method

Injection gap cleaning Bucket 1 Evian, 7-9 Dec 1023Inj/Extr Losses barrier method

Injection gap cleaning Bucket 1 Evian, 7-9 Dec 1024Inj/Extr Losses Keep cleaning on as long as possible Injection part length not important for 2011 gap instead of barrier cleaning foreseen barrier method

Injection/Abort Gap Cleaning results with barrier method For later injections losses decreased by: a factor 3 for AGC only a factor 9 for injection and AG cleaning Commissioning time before deployment needed! Evian, 7-9 Dec 1025Inj/Extr Losses

Monitoring beam quality of injectors SPS BQM thresholds tightened from 20% to 3-4% (from highest SPS bunch) 800 MHz diagnostics being improved 80 MHz in PS? Transverse beam shape  scraping in the SPS – any diagnostics to add? Fast BLMs being added at LHC injection (and SPS extraction) to diagnose source of uncaptured beam loss (LHC or SPS) Evian, 7-9 Dec 1026Inj/Extr Losses

Summary: TL loss shower mitigation Shielding: – results from already shielded area in TI2 – in the noise level – loss reduction by shielding TCDIV – factor 8 TCDIH – factor 5 TCDIH – factor 4 Scraping – Deployed and operational – no improvement expected opening TCDIs – Machine protection – covered in Verena’s talk BLM sunglasses – Under discussion – best approach defined Evian, 7-9 Dec 1027Inj/Extr Losses

Summary: Uncaptured beam loss mitigation Local shielding after TDI Minimisation of capture losses – no improvement expected Injection and abort gap cleaning – allows injecting many times at loss level of first injection – not operational  commissioning time needed! Carefully monitoring beam quality in injectors – tighter BQM settings to detect satellites – add diagnostics for SPS 800 MHz cavity, PS 80 MHz, SPS transverse beam shape? – fast BLMs at SPS extraction/LHC injection BLM sunglasses Evian, 7-9 Dec 10Inj/Extr Losses28

Summary loss range for 2011 Evian, 7-9 Dec 10Inj/Extr Losses29 Loss typeLosses in % of dump threshold B1/B2 8b16b24b48b96b144b TCDI shower1/23/54/623/24<50?<75? Uncaptured beam4/212/312/520/8<40?<60? possible with present performance several mitigation techniques have to be in place (inj cleaning, shielding, BLM sunglasses)

Extraction losses Asynch dumps at 450 GeV and 3.5 TeV Losses at Q4 and Q5 – Quench limit Expectation from simulation Evian, 7-9 Dec 10Inj/Extr Losses30

Asynch dump collision settings Evian, 7-9 Dec 10Inj/Extr Losses31 collisions in P1 and P5 3.5 TeV nominal bunches beta*:3.4/3.5 with bump at P6 90 s debunching Loss/threshold: Q4: factor 180 Q5: factor 30 Ratio dump/quench: 1/3

Asynch dump end of ramp settings Evian, 7-9 Dec 10Inj/Extr Losses32 end of ramp settings 170 urad crossing angle 3.5 TeV nominal bunches beta*:11.0/10.0 with bump at P6 90 s debunching Loss/threshold: Q4: factor 230 Q5: factor 40 also MSD losses Ratio dump/quench: 1/3

Extraction losses summary 450 GeV – low losses, factor 3 (loss/threshold) for Q4, carefully tested with different bump heights and frequency offsets, all tests OK 3.5 TeV, nominal bunch int, bump in P6 – leakage to TCT.5 ~1e-3 – Losses on Q4 up to factor 230 above threshold – on Q5: factor 40 – on 19-Sept 10: D4 loss of 5.6e-3 Gy/s – from simulations expected loss level: 50% of threshold – BLM readings at Q4 and Q5 dominated by loss shower from outside (TCDQ shower) Evian, 7-9 Dec 10Inj/Extr Losses33

Commissioning Strategy - Injection Injection set-up – 2 shifts 1 st injection protection set-up with validation – 1 shift for TCDI set-up – 0.5 shift for TDI/TCLI set-up – 1 shift for TCDI validation checks – 0.5 shift for MKI failure validation checks Protection Maintainence – 1 shift every 2-4 weeks for TL steering or TCDI re-centering after trajectory change or increased TL loss levels Injection cleaning to be operational – 2 to 3 shifts Analysis of regular operational data Evian, 7-9 Dec 1034Inj/Extr Losses

Conclusion Limits for 2011 – 96 or 108b per injection for operation  looks OK – Injection Tests with higher intensity or 25 ns spacing  depending on TL shower/capture loss mitigation – Extraction losses on Q4/Q5  dominated by shower from TCDQ Loss mitigation at injection – necessary to go beyond operational intensity scope – potential techniques to further reduce losses need to be commissioned (eg Injection cleaning) installed (eg TCDI and TDI shielding) partly available in 2011 designed (eg BLM sunglasses) Evian, 7-9 Dec 10Inj/Extr Losses35 Injection Extraction

Extra slides Evian, 7-9 Dec 10Inj/Extr Losses36

Losses in inj area due to … At -700 ns, from uncaptured beam (beam in LHC) At -100 ns, from uncaptured beam or satellites (beam from SPS) Problem due to SPS 800 MHz not locking onto frequency…for many hours Missing diagnostics…SPS surveillance, and try to get signals from LHCb Evian, 7-9 Dec 1037Inj/Extr Losses

Injection gap cleaning Bucket 1 Evian, 7-9 Dec 1038Inj/Extr Losses gap method