TRD Emergency Actions for Temperature Control: (1) Heaters On/Off (2) Pump On/Off K. Andeen 20 March 2013.

Slides:



Advertisements
Similar presentations
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Advertisements

How to Use Stowe School District
Using Outlook Benefits of Using Outlook Now – Better formatting of HTML mail (with bullets, fonts, etc.) – Great calendar, ability to send meeting.
LPA Pre-Award Certification and Assurance: 1 By pasting the address at the bottom of this page in your address box at the top of your browser, you can.
How to Use HSPInStore.com A Honeywell Branded Signage Site for Distributor Partners & Buying Group Members
How Refrigerators and Freezers Work
Downloading and Installing AutoCAD Architecture 2015 This is a 4 step process 1.Register with the Autodesk Student Community 2.Downloading the software.
UConn ECE is your opportunity to take UConn courses while still in high school. The UConn ECE courses you will take are equivalent to the same course at.
How to Get an Address. What is ? is a way to send and receive electronic mail. You do this by setting up an account with one of.
AccuMax Multi-Point Injection Mechanics
When the status is “Report Denied”, means that PMA Admins review the inspection report and they deny it. The Reports Correction Procedure can be start.
2-Stage Heat Pump Defrost Options Defrost options: –30, 60, 90, 120 or Auto (Infinity/Evolution only) Defrost initiate temp: 32° F Defrost terminate temp:
P-value method dependent samples. A group of friends wants to compare two energy drinks. They agree to meet on consecutive Saturdays to run a mile. One.
TRD GAS Refill Version 3, 13th June 2013 K. Andeen, B. Beischer, Th. Kirn, A. Putze, G. Schwering, Th. Siedenburg I. Phys. Institute B 1.
TRD GAS Refill Version 4, 13th April 2014 K. Andeen, B. Beischer, Th. Kirn, A. Putze, G. Schwering, Th. Siedenburg I. Phys. Institute B 1.
StressChill App Click the StressChill icon (shown to the right) to open the app. If you do not see this on the desktop, you will find it in the pull up.
1 BRIDGEPAD (BP) SYSTEM TRAINING Adapted for ScoreBridge Users By John de Ridder PSBC Revised 2 November 2009.
Information guide.
How to make the worksheet for the TRD Gas Refill K. Andeen (KIT) Updated 7 Feb 2014 Objective : This worksheet does all of the TRD Gas Refill calculations.
GFP in the IUID Registry – A Basic Look Walt Clark, CPPM Raytheon IIS.
NMU Voic Welcome to. This presentation will walk you through the setup and use of the NMU Voic system. Follow the step by step instructions.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started + Information for Reviewers AMS World Marketing Congress /
1  TRD Expert Oncall Mobile: (from outside CERN: )  Karen Andeen: Office: +41 (0) Mobile:  Bastian.
MSA Five Star 4-Gas Monitor Air Monitoring Instrumentation.
Interactive Program of Study iPOS. To Access the Program of Study log into ASU Interactive
Photo Story 3 Importing Pictures. When you create a new Photo Story, the first thing that you will do is import pictures. You can import pictures from.
BAKE BROIL - SELECT PROGRAM - CONV BAKE CONV BROIL SELF CLEAN On any diagram screen, double click any of the following components to bring you to a description.
Downloading and Installing Autodesk Revit 2016
Downloading and Installing Autodesk Inventor Professional 2015 This is a 4 step process 1.Register with the Autodesk Student Community 2.Downloading the.
Go to your school’s web locker site Your user name is the first letter of your first name, the first four letters of.
Making Python Pretty!. How to Use This Presentation… Download a copy of this presentation to your ‘Computing’ folder. Follow the code examples, and put.
Calibration instructions for Quarknet Cosmic-Ray Detector How to Plateau the Counters A friendly guide for students and teachers Edited by Jeremy Paschke,
Service Section Technical Training December 2005.
LCMS-325 TQ Operation Chem 115 Paul Hrvatin Winter 2013.
Running Queries - LV This presentation describes how to run Miquest queries on the EMIS LV system. You should have already created them from the spreadsheet.
Thesis Defense and Submission 1 Spring  Register for Spring semester  Deadline to submit thesis to GPS: Friday, April 22 nd at NOON  Deadline.
Subtractive Manufacturing Exercise #1 Step #2 Key Fob Project Using Velocity CNC Software for the CNC Milling Machine Note: In order to use this set of.
New features of Chamber Monitor Panel E. Furfaro 9 april 2012.
Adding, editing, and deleting items using CONTENTdm Administration.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
DegreeWorks Training Guide A Degree Evaluation and Advising Tool for DALTON STATE Information for Faculty and Advisors Last updated 10/17/2011 Using the.
Attendance & Grading 1.Logging In & Navigating the Mail Menu 2.Viewing & Printing Your Attendance Roster 3.Creating TBA Schedules 4.Positive Attendance.
It’s always important that all of your nodes be numbered. So the way to do that is to go to Options at the top of the screen then select Preferences. When.
Example 3.1a Sensitivity Analysis and Solver Table Add-in.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
Shape Memory Alloy Thermomechanical Testing ME356 Spring April 2016.
Evolution of the gas system control for flight
Welcome to Team PosaCash Training video “Invitations and Marketing site” Where We Create POSITIVE.
TRD HV Off/On for an AMS-02 Power Down or Power Off (and then presumably Power Up / On) K. Andeen 12 Nov 2013.
Calibration Instructions for Quarknet Cosmic Ray Detector
Confirmations, Bulk s, and System Text
Helpful Hints Complete your profile completely and accurately. You will match to more scholarships if you provide complete information. Check back frequently.
RB Controls Clocking in and out follow ups inner office messages
20 Oct 2014: HV Trip? K. Andeen 21 Oct 2014.
Basic Troubleshooting Techniques
BRC1E61 – Energy Saving Function
Start program Start Start Time Duration Counter.
How to fix Update Failure Error “0x800f081f” on Windows 10 KB ?
Attendance Using GradeQuick
QUESTION INSTRUCTIONS
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
Digital Chart Recorder Operation
RB Controls Clocking in and out follow ups inner office s
QUESTION INSTRUCTIONS
Diagnostics Analytical 920 LC Semi-Prep 940 LC
CTAERN/DOE System Level Counselor Coordinator Profile Entry Initiative
MACROS MUST BE ENABLED FOR THIS FILE TO WORK
RB Controls Clocking in and out follow ups inner office s
How to someone and get what you want!
Presentation transcript:

TRD Emergency Actions for Temperature Control: (1) Heaters On/Off (2) Pump On/Off K. Andeen 20 March 2013

Xenon Vessel Heaters ON/OFF

Xenon Vessel Heater On/Off Qualifying Conditions: if the Box C temperature drops below 8/9 degrees and will not be warming up soon (ask Joe if you do not know what the maneuver plans are) we consider turning on the Xenon vessel heaters. Confirm all actions with the trd-expert list first. – Call Klaus Lubelsmaier – Stefan Schael, Thomas Kirn, Thorsten Siedenburg, Bastian Beischer, and Karen Andeen. Once the procedure is agreed, follow next steps… If you’re doing a gas refill in the next few days, REMEMBER that the Xenon Vessel should not be more than 5 deg C warmer than the Mixing Vessel. To avoid this, turn off the heaters at LEAST 36 hours before the refill should start.

Xenon Vessel Heater ON  Be sure that there is item 14 in the TQ list—ask LEAD. It should currently be disabled.(If this item does not exist and you the TRD expert do not know how to fix this, Mike knows how to fix this.)  Confirm with LEAD that you have ability to send commands.  Then, open a new TRD terminal and type: cd ~/COMMANDING/TRDGAS./Heat_Xenon.csh A  Watch for 8 replies Check for these changes in the TRD-Gas Monitor plots (see next slide):  Current should go from 0.6 A to 1.4 A (plot 92, center)  Xenon heater enable Bit changes from 0 to 1 (plot 95, lower left)  Xenon Temperature and Pressure (top left, plots 90 and 93) should increase  CO2 pressure and temperature (same plots) should be unaffected It takes ~8 hours to heat up from 8 degrees. There is a thermostat, so the heater will increase to a certain point, then shut off, then turn back on again, etc. until you shut it off. (See next instructions.) The Box C temperature will increase by about 1 degree from where it would have been otherwise

Xe Pressure Increases CO2 Press. Unchanged Xenon Temp Increases CO2 Temp. Unchanged From 0.6 to 1.4 From 0 to 1

Xenon Vessel Heater OFF Do once you have confirmed that the temperature range is out of danger— the Box-C temperature should be at 10 or 11 degrees.  Confirm with LEAD that you have ability to send commands.  Open a new TRD terminal and type: cd ~/COMMANDING/TRDGAS./Disable_Heaters.csh A  Watch for 3 replies  Have LEAD check that item 14 in the TQ list is now disabled again. Check for these changes in the TRD-Gas Monitor plots (see next page):  Current should go from 1.4 A to 0.6 A (plot 92, center)  Xenon heater enable Bit changes from 1 to 0 (plot 95, lower left)  Xenon Temperature and Pressure (top left, plots 90 and 93) should decrease  CO2 pressure and temperature (same plots) should be unaffected The Box C temperature should decrease by about 1 degree from where it would have been otherwise.

Xe Pressure Decreases CO2 Press. Unchanged Xenon Temp Decreases CO2 Temp. Unchanged From 1.4 to 0.6 From 1 to 0

An example of teperature and Pressure plots during Xenon Vessel Heating Xenon Temp / deg C Xenon Pressure/ bar Spirometer Temp/bar

An alternative method is to use the Gui. However the gui can only talk to BOTH vessel heaters (Xenon + CO2) at once. This is okay for simply turning the heater off. But for turning on be sure to get approval to turn BOTH heaters on.  Inform LEAD that you will be turning on the heaters.  Ask LEAD if you have ability to send commands. To open the gui, you MUST open 3 terminals.  In the 1 st terminal: cd ~/RUN set-command-path eas:hosc pcposp0 TRDGAS-C eas:hosc pcposp0  In the 2 nd terminal: cd ~/RUN set-command-path eas:hosc pcposp0 TRDGAS-M C  In the 3 rd terminal: Look in 2 nd terminal, where you opened TRDGAS-M C. There is a file called CmdFile which it says it will write to. Watch this file: tail –f /path-to-file/CmdFile_.....dat Vessel Heaters ON/OFF using Gui

When looking at Gui, check that:  interface is eas:hosc  server is pcposp0  Side[A/B] is a Vessel Heaters ON/OFF using Gui

To turn the heaters ON:  click [heat][vessels]  Watch for replies in the 3 rd terminal.  Watch for the changes in the plots as before (Slides 4 and 6) To turn the heaters OFF:  Click [heat][off]  Watch for 3 replies in the 3 rd terminal.  Watch for the changes in the plots as before (Slides 4 and 6) Vessel Heaters ON/OFF using Gui

Pump ON/OFF

Pump On/Off using Gui Qualifying Conditions: if the Box C temperature drops below ~7 degrees and will not be warming up soon (ask Joe if you do not know what the maneuver plans are) AND the Xenon vessel heater is already on, we consider turning on the pump—it should get you ~ 2 degrees for the BoxC temperature. This procedure is a LAST RESORT!!! Confirm all actions with the trd-expert list first. – Call Klaus Lubelsmaier – Stefan Schael, Thomas Kirn, Thorsten Siedenburg, Bastian Beischer, and Karen Andeen. Since this may affect the quality of the science data we take, this must be confirmed also with Professor Ting. Once the procedure is agreed, follow next steps…

Pump ON/OFF using Gui  Inform LEAD that the pump will be turned on.  Tell LEAD to increment the runtag. (Once finished, the runtag must be incremented again.)  Ask if you have ability to send commands to AMS. Once this is complete, you need to open the gui: you MUST open 3 terminals.  In the 1 st terminal: cd ~/RUN set-command-path eas:hosc pcposp0 TRDGAS-C eas:hosc pcposp0  In the 2 nd terminal: cd ~/RUN set-command-path eas:hosc pcposp0 TRDGAS-M C  In the 3 rd terminal: Look in 2 nd terminal, where you opened TRDGAS-M C. There is a file called CmdFile which it says it will write to. For each command sent from Gui, confirm that there are no errors here (ERR, ABORT, etc…) Also watch for proper number of replies for each command. This is the file: tail –f /path-to-file/CmdFile_.....dat

When looking at Gui, check that:  interface is eas:hosc  server is pcposp0  Side[A/B] is a Pump ON/OFF using Gui

BEFORE TURNING PUMP ON OPEN ALL FLIPPER VALVES (VERY IMPORTANT!!):  Click [Flipper Valves][Open AC]  Watch/wait for 77 Replies  Click [Flipper Valves][Open BD]  Watch/wait for 77 Replies Pump ON/OFF using Gui

To turn the pump ON:  Verify that you have cp2 and h (for half speed)  click [pump][start]  Watch for 58 replies in the 3 rd terminal.  Watch for the changes in the plots shown on the next page.  DRP will briefly turn red (“bad”) until pressure stabilizes. To turn the pump OFF:  Click [pump][stop]  Watch for 60 replies in the 3 rd terminal.  Watch for the changes in the plots shown on the next page.  DRP will briefly turn red (“bad”) until pressure stabilizes. Pump ON/OFF using Gui

Reset Command Counters after each set of replies This is example of the pump turning off. When turning on it does the opposite.