PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Spreadsheets in Finance and Forecasting Project Session 3a The Next Step: Planning Your Visits.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
1 Towards an Upgrade TDR: LHCb Computing workshop May 2015 Introduction to Upgrade Computing Session Peter Clarke Many peoples ideas Vava, Conor,
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
June 19, Outcome of the CERN meetings Preparing the upgrade R&D proposal M. Shochet.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Formula student as part of a mechanical engineering curriculum Dr Huw Davies – ENGIN.
Tracking at the ATLAS LVL2 Trigger Athens – HEP2003 Nikos Konstantinidis University College London.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
VCE Learning. To unpack the challenge of enhancing the quality of VCE learning What does the student need to know about how to interpret the task ? Ho.
Fine Pixel CCD Option for the ILC Vertex Detector
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
M. Gilchriese ATLAS Upgrade Introduction January 2008.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
The Region of Interest Strategy for the ATLAS Second Level Trigger
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Sponsored by the National Science Foundation GEC 20 Proposal & GEC 18 Survey Results Sarah Edwards Marshall Brinn Niky Riga March 18, 2014.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
ILD Optimization Why – when – what Ties Behnke, DESY Henri Videau, LLR.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
Cosenors House, Dec p 11 New Detector Initiatives Agenda 10:00 Coffee 10:30-12:30 Talks-part i (~15mins ) Mike Tyndel - Introduction to NDI group.
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
IC Design and Technologies for HL-LHC A. Marchioro CERN-PH-ESE.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Welcome to the 2 nd ECFA HL-LHC Experiments Workshop at Aix-les-Bains As for 2013, the bulk of the material has been organised by Preparatory Groups, but.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
SUMMARY AND DISCUSSION SAVERIO D’AURIA. SUMMARY Expertise from various experiments and from people with different background We tried to factorize what.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
R&D per l’LHC upgrade di fase 2 1 Iniziative verso la fase 2 : USA: Snowmass, (Jul 29 - Aug 6, 2013) HL-LHC Experiment ECFA Workshop, Aix-les-Bains Oct.
Introduction to the Electronics and Readout Systems Session Ph. Farthouat, CERN.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Technology and R&D Summary and next steps Burkhard Schmidt.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Preparation and practice are essential for success in your examination
SVT – SuperB Workshop – Annecy March 2010
Organization and Goals for the Workshop
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Technical Design for the Mu3e Detector
WP microelectronics and interconnections
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
NAPAC’19 SPCC Mtg Synoptic
Presentation transcript:

PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning mechanics and standard electronics are in other groups – Not much introduction necessary – No generic R&D – Can be more flexible and include a few invited talks on topics not included in session PG2: Solid state tracking detectorsOld PG2 (tracker)+HGCAL120’

How to Organise This Time: Stay with all plenary format to keep the communication flow Should not need as much introduction Should involve theory and accelerator communities much more closely with more talks in these areas Try to build on synergies identified/developed since last time and emphasise common approach Therefore have proposed to organise sessions now more by R&D area than sub- detector/system  Need to keep clear relationship with HL-LHC detector needs (not a generic R&D discussion)  Need a way of preparing material that is as inclusive as possible ie: open groups to contributions from all interested collaborators through dedicated meeting or mini-workshops Can be more flexible and include a few invited talks on topics not included in sessions From first global prep meeting (Frank was not present)

Daniel’s and Frank’s first thoughts Needs and interests of all four experiments must be covered – But we might need to make some choices to fit in 2 hours IMHO, we should focus on synergies and on challenges and wherever possible how we intend to tackle these! Our interpretation of “Solid State Tracking Detectors” is the Trackers, the High Granularity Calorimeter (since it was requested in column 2 but no beam radiation detectors or luminometers etc. IMHO, we are quiet advanced in the outer tracker and I see the main challenges in the pixel systems ergo propose to concentrate there – It’ll be less glory but probably more challenging

Session 2013

Need to have 5 min in between each talk! Can accommodate 5-6 talks max What about – Intro – 10 min (+5) layouts; concepts; physics motivation; challenges – Sensors – 20 min (+5) Short status on OT since the R&D is mainly done Status and next steps on commercial aspects – Will ATLAS and CMS go for a common MS? Pixel challenges (technicalities in small pitches / thickness) Etc. – Pixel electronics – specific challenges – 20 min (+5) RD53 – radiation hardness of 65nm – granularity/connectivity – HGCal – 15 min (CMS specific but novel) (+5) Technicalities – challenges – synergies/specifics – Summary Talk – 10 min Concise executive summary of the challenges ahead! Daniel’s and Frank’s first thoughts on topics Will need to clarify overlap with PG5 but IMHO the specifics belong here 95 min 20 min gives room for 1 (2?) more talk CMOS – 10 min ? Rates (trigger & readout)? – Could be part of the pixel electronics) – Do we want it for OT Should we discuss BB? Should we discuss modules? We could discuss problems with services and power?? Am I to focused on ATLAS and CMS?