The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.

Slides:



Advertisements
Similar presentations
Progress Report Günther RosnerNuPECC, Milano, 9/3/121.
Advertisements

FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Status Report Walter F. Henning.
The Preparatory Phase Proposal a first draft to be discussed.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Status of QUACO project
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 3rd Annual Report meeting January 29, 2008 J. Eschke,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
Preparatory projects and funding opportunities 17 th June 2010 – Copenhagen, Denmark Christopher Parker and Rachel Burn European Union European Regional.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
O. Kester, 6 th MAC meeting, Darmstadt, 10/10/2011 FAIR ACC planning and schedule O. Kester 6th FAIR - Machine Advisory Committee Meeting
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Itzhak Tserruya Weizmann Institute of Science
Status of HESR 18th March Gießen Dieter Prasuhn.
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
(Procurement, testing of magnets)
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Patrick Roach Robert Arena ET-493 Fall 2014 Advisor: Rudolph Rode
FAIR – the Universe in the labororatory
Lafayette New Terminal Program Update
CYCLE 2019 Application Process & Timeline
Imaging & Engineering STAP Meeting 12th-13th of April 2018
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 13 MARCH 2019
Welcome Update on ESS Construction Project
Lafayette New Terminal Program Update
and collaboration with France
Presentation transcript:

The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121

Darmstadt Günther RosnerNuPECC, Sevilla, 5/10/122

Member States Günther RosnerNuPECC, Sevilla, 5/10/123 All numbers in 2005 € (escalation until 2018 ca. +50%) Spain expected to join soon (with M€) Negotiation with the UK on Associate FAIR Member status Talks with China on Associate FAIR Member status Contribution to experiments (6.6 M€)

Modularised Start Version Günther RosnerNuPECC, Sevilla, 5/10/124 APPA CBM/HADES NuSTAR PANDA Experiments M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA M0 M1 M2 M3

July 2012 Günther RosnerNuPECC, Sevilla, 5/10/ M€ German contribution to civil construction – largest BMBF grant ever

Further CC Planning 08 / / / / 2012 Update of basic design due to change requirements of the authorities Detailed design architecture Structural design Günther RosnerNuPECC, Sevilla, 5/10/126

CC Licensing II / 12III / 12IV / 12I / 13 Permission for piling works Permission for ground water management Application for soil storage Partial permissions of radiation protection Günther RosnerNuPECC, Sevilla, 5/10/127

CC Current Preparatory Work 09 / 1210 / 1211 / 1212 / 12 Relocation of cables (below SiS 100) Ground water measuring points Piling works Internal site roads Günther RosnerNuPECC, Sevilla, 5/10/128

CC Tendering and Contracting Work sectionStatus Relocate cables below SiS 100 in progress; end of work in Oct Measuring points for ground water date of submission: ; start of work in Oct Piling worksdate of submission: ; start of work in Nov Interal site roadsdate of submission: ; start of work in Jan Site logisticsin preparation, announcement estimated in Oct Günther RosnerNuPECC, Sevilla, 5/10/129

Experimental Site Günther RosnerNuPECC, Copenhagen, 15/6/1210

Compact & cost effective Fast cycling superconducting magnets dB/dt ~ 4T/s Accelerators SIS100 magnets are being built. Contracts/tenders for many other parts of SIS100 and CR in preparation. HESR grant allocated to FAIR; ready for being built/tendered by FZJ and FAIR. IKRB meeting on 9/10/12. MAC meeting on /11/12. Günther RosnerNuPECC, Sevilla, 5/10/1211

Experiments Project – structure defined – staff in place Experiment Coordinators – employed Expert Committee Experiments – First meeting 19 Nov Resources Review Boards – First mtgs. beginning of 2013 FAIR Scientific Council Martino Board of FAIR Collaborations Nilsson Research Division Rosner APPA Neff, Stiebing, BD Resources Review Board Rosner CBM Müller, Eschke Resources Review Board Rosner NuSTAR Gerl, Herlert Resources Review Board Rosner PANDA Schmitt, Schepers Resources Review Board Rosner Expert Committee Experiments 3 APPA, 2 CBM, 2 NuSTAR, 2 PANDA Project Office Lehmann Liaison Office Varentsov Third Party Issues Nicmorus Günther Rosner12NuPECC, Sevilla, 5/10/12

Status Technical Design Reports on experiments – Required by most funding agencies – Currently NUSTAR: 4 approved + 3 review in progress PANDA: 2 approved + 3 review in progress APPA: 1 review in progress CBM: submission 2013 Risk assessment experiments – first one completed In preparation – Detailed common timelines – Construction Memoranda of Understanding Günther Rosner13NuPECC, Sevilla, 5/10/12

Timeline Günther RosnerNuPECC, Sevilla, 5/10/ Building permits Site preparation Civil construction contracts Building of accelerator & detector components Completion of civil construction work Installation & commissioning of accelerators and detectors Start Data taking

Thank you very much Günther RosnerNuPECC, Sevilla, 5/10/1215