Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/1 Issue 1.3 SGB LEAK PREVENTION SYSTEM SGB GmbH.

Slides:



Advertisements
Similar presentations
AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
Advertisements

THE RADIX TRAFFIC BELOW GROUND VEHICLE DETECTOR RTM MAGNETOMETER COMPONENTS Radix Sensor RTM300 3-axis magnetometer technology monitors changes in the.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
INSTALLATION INSTRUCTIONS IMPORTANT: Read all instructions before performing any work. To avoid the risk of electric shock, turn off power before installing.
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Pipes Single Wall Pipes Double Wall Pipes
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
Assumption University Thailand EE4503 Electrical Systems Design Raceways 1.
Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
“A driver initiated program” Lance Morgan Dave Conklin.
Petroleum Equipment Institute
Start here >> Network IQ Training Manual Chapter 4 - Fibre Optic Hardware.
Jan Bremert Technical Director Tba International GmbH & Co. KG Fabersweg Norderstedt Germany Phone.: Fax:
31/03/11FV 1 CEDAR from flammable gas safety point of view.
ExSite “ Sharing of Best Practices” The following illustrations of system interconnections are provided only as a guideline. Actual connections are dictated.
ADT490 TroubleShooting Locating Grounds A. 2 How are the Circuits Installed ‣ Before looking for the actual location of a fault on a circuit, look at.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
High Sensitivity External Leak Detection for Liquid Fuel Pipelines David Parman P.Eng. Ken McCoy.
11022 Transcutaneous Signal Transmission for LVAD February 18, 2011 Yevgeniy Popovskiy, Vince Antonicelli, Craig LaMendola, Chrystal Andreozzi.
OP055, Issue 03, May 2015 Page 1 of 2 Outside Plant The RetractaNet XS TBE-I4 ST Tapping Box is used to breakout and distribute the.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Design Considerations for Telecommunications Pathways and Spaces
MWM – Martinek Water Management GmbH Mozartstraße 23 A – 6845 Hohenems Austria Tel.: Fax : E – Mail Internet.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Floor Warming. 2 RaySol System 3 RaySol Applications Freezer Frost Heave Prevention Concrete Floor Warming Heat Loss Replacement Tile and Marble Floor.
SA Power Networks 2015 Service & Installation Rules (S&IR) Presenter: Martin Wilkes – Network Connections Manager.
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
Installation. Indoor Unit Installation Typical Installation.
Release Detection for Piping Spring Types of Piping Safe Suction “Unsafe” Suction Pressurized.
■ Instruction Manual Thank you for purchasing this product. You are requested to use right, reading this instruction manual before use. Microwave Motion.
APM Automation Solutions Ltd. Good Installation Practice Guidelines Eran Perlstein, Customer Support Director.
IPC Stress Relief Lands and terminals shall be located by design so that components can be mounted or provided with stress relief bends in.
Unit 4: General Safety Practices
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
UTH-65A VER. CAUTIONS ! PLEASE USE THE OUTLET PREPARED BY A QUALIFIED SERVICEMAN AND MUST CONFIRM IT BEFORE APPLY[SING AN ELECTRIC CURRENT.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Teleconf ACS – FREIA 28th March 2017
Microwave Motion Activator I (Automatic Door Sensor)
IT-4189 Supply and installation of a cryogenic distribution system
SBN Far Detector integration model overview
Quick help for fault location and reliable detection of defects
A very first look at siting issues
New Install Proposed rule changes
(vertical cryostat, Gersemi)
THUM Adapter Impact on Hazardous Area Classification
Personal Protective Equipment
INVESTIGATIONS AND COMPLIANCE
Pressure Level Sensor OTT PLS
Monitoring Faults.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Quick help for fault location and reliable detection of defects
Cryomodule Assembly Plan
Appalachian Underground Corrosion Short Course
Progress and plans, Mechanics system of CEPC
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/1 Issue 1.3 SGB LEAK PREVENTION SYSTEM SGB GmbH Hofstrasse 10 DE Siegen GERMANY Tel: + 49 (0) Fax: + 49 (0) Site-prep Manual Issue: 1.3;

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/2 Issue 1.3 Introduction This document is an overview about the necessary steps is an overview about the necessary equipment is based on the information laid down in GDS – the different sections are referenced is a summary with regard to the site preparation to install a leak detection system Designed for: Architects PMC’s Main Contractors

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/3 Issue 1.3 Place to mount the SGB Vacuum Leak Detection Cabinet See also: and Close to the discharge area (Filling point) 1 Meter Distance to the corbings or bollards Attention: In case if there is not the possibility to mount the Leak Detector closed to the filling (e.g. no space to protect the box), please ask the PMC Technical Manager for advice

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/4 Issue 1.3 Place to mount the SGB Vacuum Leak Detection Cabinet DO‘s: - Place closed to the filling-point DONT‘s: - „too-early“ mounting of the box Due to risks of damages during site civil works - Wrong conduits are used Entry seals to avoid migration of vapors cannot be installed

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/5 Issue 1.3 Pedestal for the Leak Detection Cabinet There a pedestal has to be built: 1.Horizontal measurements of the concrete pedestal 2.Measurements of the protection box 3.Space for the conduits (opening of the protection box) RED AREA is the space to terminate the conduits 600 mm 1100 mm 300 mm 800 mm 700 mm 180 mm

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/6 Issue 1.3 Pedestal for the Leak Detection Cabinet 4.Vertical measurements of the concrete pedestal > 200> 300 Termination over a LEAK TIGHT AREA! (independent of the place where the Leak Detector is mounted)

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/7 Issue 1.3 Conduits, general Conduits are required for: 1.Electrical wiring between Protection Box and Indicating Unit (Shop) (for information: 4 wires + Ground) Electrical wiring between Protection Box and VISY INPUT (Fafnir) (for information: 2 wires per sensor in one cable e.g. 4 sensors means one cable with 8 wires) 2.The tubing between the monitored interstitial space of the pressure lines and the manifold in the Protection Box CAUTION: If there are more than 3 tubes to routed through one conduit, install a second conduit to the same manhole. 3.The Tubing for the exhaust line An Animation for these Conduits follows next page! See also: and

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/8 Issue 1.3 Conduits, general Requirements for the conduits: 1.Routed with a continuous fall to the manhole 2.Buried at a depth that the tubes are Frost protected (~ 60 cm) 3.The distance between manhole and Leak Detector should not exceed 50 m 4.Routed from every manhole to the place where the Leak Detector is mounted (concrete pedestal) 5.D=75 mm (or 100 mm) for electrical wiring 6.D=32 mm, for Tubing, recommendation: UPP 7.Use specified Conduit Entry Boot to enter the manhole See also:

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/9 Issue 1.3 Conduit Plan Conduit exhaust, 32 mm Conduit pressure lines, 32 mm Conduit electrical, 75 or 100 mm

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/10 Issue 1.3 Conduit Plan Conduit exhaust, 32 mm Conduit pressure lines, 32 mm Conduit electrical, 75 or 100 mm

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/11 Issue 1.3 Routing of the Conduits Place where the concrete pedestal for the leak detector will be built Conduits for the leak detection system

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/12 Issue 1.3 Grounding of the box See also: and Prepare the grounding, that also the protection box can be grounded Grounding point in the box Existing grounding plan

Introduction Conduits, general Contact to SGB Conduit Plan Grounding Place to mount Pedestal Measurem. A/13 Issue 1.3 If you need more information Martin Huecking+ 49 (0) (Technical Director)+ 49 (0) Jost Berg+ 49 (0) Hans-Gerd Jersemann+ 49 (0) (Sales or if you have proposals to optimize our documentation or if you need assistance for a site lay-out Please contact: