LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Sectional Assembly and Installation
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Manufacturer’s Recommendation for Setting up a Theodolite 1)Ensure that :- the tripod head is approximately level the tripod feet are firmly fixed in the.
ModICE Modular Integrated Connector Enclosure
Click on this image to open the full PDF document.
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
1 V1.00 © 2009 ZelFlex QR Quick Released double-sided mechanical stretching frame Step by step User guide.
Mini Reel Hand Tools. JST Mini Reel Hand Tool JST is proud to introduce the JST Mini Reel hand tool and explain the features, benefits and basic operation.
Reduced Vertical Separation Minimum (RVSM)
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
Magnets for the ESRF upgrade phase II
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Connecting crank and pivot shaft assemblies. Press fits, or interference fits are sometimes used in manufacturing to reduce manufacturing costs or liabilities.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
“Consider the Possibilities” Multi-Use TS Jig FLWoodRat's.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
LCLS-II Magnetic Structure Design Review Steve Marks 7/6/11 1.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Installing a single Dreamscreen Set unit in place and attach with 2 ½ “ screw. Do not tighten the screw yet, tighten just enough to keep from falling.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Chemistry Lab Equipment
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
MBA Magnets MultiBend Achromat Magnets 8/14/2015 Review By Mark Jaski.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
STEP 1: ASSEMBLE ANGLE PLATES
Annex 5 - Tower and Lock installation
Flex Series & View Series
ModICE Modular Integrated Connector Enclosure
GLASS MEASURING GUIDE View Series.
2017 PWNAGE 8WD WCD CHANIN IN-TUBE CHASSIS ASSEMBLY INSTRUCTIONS
Endcap shielding senarios:
IHEP group Shashlyk activity towards TDR
STEP 1: ASSEMBLE ANGLE PLATES
Tips to upgrade RAM, SSD, and HDD in HP Omen 15. Intel Core i7 processor, GTX 10 series GPU, 16GB of RAM and solid storage functions configured in HP.
Undulator Assembly Procedure
KELVIN MAINTENANCE GUIDE
Removal of salon doors on 1968 Roamer Sedan.
Reader Swap out Guide.
Step 1:Disassemble battery case
One Tote Over The Line Jackie’s Basic Tote Lesson
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
QUADCOPTER PRODUCTION PLAN
Presentation transcript:

LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1

HXU32 Keeper, Pole and Magnet Assembly NEAR SIDE KEEPER NOT SHOWN

Keeper Assembly

Position Pole #1 1. Assemble Pole #1 to Keeper Rib #1. Use Vertical Spacer to create adjustment gap at bottom of pole. Clamp pole loosely in position, with set screws, approximately on center of rib. NEAR SIDE KEEPER NOT SHOWN

Position and Install Pole #1 2. Add Gage Block (in green) and Gage Shim to Keeper Slot #1 as shown. 3. Push Pole in Z direction firmly against gage block and shim to eliminate any gap or space between parts. 4. Clamp pole firmly and permanently in position using set screws.

Position and Install Pole #2 5. Remove gage shim. 6. Add Pole #2 with spacer and press firmly in the Z direction against the gage block and Pole #1. 7. Clamp pole firmly in place with set screws.

Position and Install Pole #3 8. Add Gage Block #2 to next adjacent slot. 9. Add Pole #3,with vertical spacer, and loosely retain with set screws. 10. Push Pole #3 firmly in Z direction against Gage #2 and other installed parts. 11. Clamp Pole #3 firmly into position with set screws.

Position and Install Remaining Poles 12. Repeat steps for full length of module.

Install All Poles Per Steps 1-12.

Install All Magnets Between Poles w/Magnet Clamps.