Deniz Bertuna, Tyler Drake, Jason Hohl, Gavin Kutil, Ryan Quakenbush, Gauravdev Singh Soin October 18, 2007.

Slides:



Advertisements
Similar presentations
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Advertisements

Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Team Delta Special Recon Ops Launch Readiness Review Taylor Boe Andrew Gilbert Bobby Stillwell Emily Howard Grace Harsha Andrew Buckner November 11, 2008.
Flight Club Critical Design Review Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams October 14, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Daniel Sayle, Patrick Byrne, Sarah Kemp, Anna McLeland, Katie Thompson 11/2/10 TEAM MUNCHIES LAUNCH READINESS REVIEW.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Team Mate Launch Readiness Review Jason Schelz, Will Hakes, Emma Mossinger, Ethan Long, Brendon Barela, Amelia Weller 11/02/10.
Team Space Jam Critical Design Review Bridget Chase, Shane Meikle, Jamie Usherwood, Ben Azlein, Megan Scheele, Taylor King, and Paul Guerrie October 5,
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
Team Thumbs Up Launch Readiness Review Nick Lenk Eddie Cyrus Brian Inglis Chase Prichett Greg Nelson Jake Varey 11/11/08.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Oddballs Critical Design Review Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend 10/18/07.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Design Review Corinne Desroches Saad Alqahtani Charles MacCraiger Alexa Warly Connor Jacobson Kyle Skjerven Matt Busby.
1 Student Hands On Training I (2009) BalloonSats & Ballooning BalloonSats & Ballooning.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Lightning Rod Critical Design Review Fall 2010 Rev A Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
James Bader, Jordan Dickard, Blake Firner, Amanda Kuker, Michael Lotto, Diana Shukis
Ryan Olin, Austin Granger, R.J. Kakach, Seth Frick, Joey Senkyr AEM /24/09.
Team Ramrod Critical Design Review Dan Armel, Michaela Cui, Andrew Grimaldi, Kyle Kemble, Silvia Peckham, Chris Sawyer, & Kelsey Whitesell 2007 October.
PDR Presentation Team JHK Experiment TIC February 27, 2003.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
Team McLOVIN mission name: G Force, Intensity, and the Power… of Love Deniz Bertuna Gauravdev Singh Soin Gavin Kutil Jay Hohl Ryan Quakenbush Tyler Drake.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Junk in a Box Critical Design Review
Mission Statement... The Space Wolverines will;
Brandi Casey Lee Wilson
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
Space Debris Critical Design Review
Launch Readiness Review
Team TWSS Launch Readiness Review
Team SCREAM Launch Readiness Review
Panoramic Rays Critical Design Review
Presentation transcript:

Deniz Bertuna, Tyler Drake, Jason Hohl, Gavin Kutil, Ryan Quakenbush, Gauravdev Singh Soin October 18, 2007

 Objective The objective of our team mission is to test and build a satellite that will be sent to approximately thirty kilometers and measure light intensity at different atmospheric levels and take high quality images. The team wishes to further the studies of light intensity being performed by Professors Brown and Fesen in their efforts to create a low budget, high quality, near space platform for astronomical purposes.  Expected Results Our main goal is to gain data of light intensity of the sky further to promote the research of Professors Brown and Fesen in hopes of advancing the field of low cost near space astronomy.

 Level 0  (Objective Requirements- Derived from Mission Statement)  Construct a BalloonSat in order to improve or understanding of light intensity between the altitudes of 15 and 30 kilometers with a budget of $200.00, and a weight less than or equal to 800 grams by November 10, 2007  Measure light in the infrared frequency in nanometers at different atmospheric altitudes.  Track the temperature (˚C) of the photodiode to correctly evaluate dark current noise effects on data.  Obtain high quality images of the curvature of the earth at 30 kilometers.  Keep the inside of the BalloonSat above 0 ˚C

 Level 1  (System Requirements- Derived from Level 0)  The Balloonsat, excluding the photometer, must be maintained at an optimal temperature of 25 ˚C.  The balloonsat must be connected to an inverted plastic tube will be fixed through the center of the balloonsat. The rope, which is tied to the balloon, is threaded and knotted through the tube.  Balloonsat must be carried by a latex balloon filled with helium, carrying a parachute deploying on burst, and capable of carrying a net payload of twelve kilograms

 Level 2  (Subsystems Requirements- Derived from Level 1)  2.1) The photodiode circuit is connected to the Basic Stamp, where all of the data from the photometer will be stored.  2.2) The Basic Stamp will be preprogrammed to record the data in the proper format.  2.3) The camera will be connected to the power source via a switch. The operation of the camera will be controlled by a timing circuit which will be programmed to take photographs at regular intervals of one minute.  2.4) The HOBO will consist of two sensors, one recording external temperature of the balloonsat and the other recording internal temperature in ˚C.  2.5) The heating unit must operate properly to ensure that the subsystems (excluding the photodiode) will function even though the exterior of the balloonsat will experience temperature extremes of -70 ˚C. Insulation will also be used to keep the BalloonSat above the required 0 ˚C  2.6) In order for the balloon to reach its desired altitude of 30 kilometers, each system has to obey the 800 grams weight limit. The balloon will also carry a parachute, to ensure a soft landing velocity of nearly 100 kilometers an hour, and a GPS tracking system to help the team recover the balloonsat.

 Construct a BalloonSat to test light intensity at high altitudes.  Measure light in the infrared frequency.  Record temperature of the photodiode.  Obtain high altitude photographs

 -Low dark current silicon photodiode  -OPA129 Integrator  -OPA27 op amp voltage follower  pF Panasonic metalized polypropylene film capacitor  -DIP-packaged reed relay  -LM335 temperature detection circuit  -4.1 inch PVC pipe with a diameter of inch  -1 x 1/18 aluminum bar  -Plano-convex lens of 30mm diameter and 25mm focal length  -HOBO  -Digital Camera with timing circuit  -Foam Core  -Condensation Gel Packets  -Insulation  -BASIC Stamp The BASIC Stamp has been ordered and received. Nothing else will needed to be ordered.

 In order for our group to have a successful flight and collect substantial data, several tests will need to be performed on both our satellite structure and its inner components. Our group established a detailed day-by-day test schedule to ensure a successful mission. Most importantly, our group needs to test our photodiode because our data will not only reflect our success as a group but also will provide data for the further studies of Dr. Brown and Dr. Fesen. Our group aims to have complete confidence in both our structural and subsystems designs. With that in mind, our group will conduct multiple tests using different conditions. From there our group will utilize this information and apply that to out separate designs for best performance. The way that the group will determine which tests were more successful than others will be by means of video photography. With that the data can be analyzed and then properly utilized.

 6.1 Stair Test The stair test will be implemented to test the structure of the BallonSat. If the parachute of the balloon fails, the payload needs to survive a harsh landing, which is what the stair test is designed to do. 6.2 Whip Test To simulate the flight the BalloonSat will experience once the balloon pops at its maximum altitude. By attaching a cord to the satellite it will be spun around to simulate flight. 6.3 Drop Test Incase the parachute fails to deploy, the satellite will be put to very high velocities, so the payload will be dropped from a height of twenty meters to simulate the landing force it could experience. 6.4 Cooler Test The payload will experience extreme cold temperatures during flight; by making sure all the experiments function properly, the BalloonSat will be placed in a cooler of dry ice for three hours to experience how long it will be in flight in these extreme temperatures  6. 5 Photometer Testing and Calibration The photodiode must first be calibrated to record accurate data. The current plan involves exposing the photodiode to a know wavelength in a completely dark room to learn the variation constant. This can most easily be done with various colors of light or a laser pointer. Testing on the photometer will mostly involve the circuit and basic stamp functioning compatibly together.

 Subsystems test  Cooler/ heater  Light/ photodiode  Electrical  HOBO  BASIC stamp  Camera and timing circuit  Heater

 We have tested our BalloonSat’s structure. Through recreational activities of kicking, punching, wearing it as a shoe, soccer, football, and dropping from various heights.  As we expected, our structure held form from all that we did.  This was a preliminary prototype to see the basic structure of what our final BalloonSat will look like.

 The main expectations are to formulate an average value of light intensity at various altitudes to further promote the research of Professors Brown and Fesen in hopes of advancing the field of low cost near space astronomy.  Collect temperature and humidity readings at increasing altitudes during the duration of the flight.  Take High quality images of the horizon at the balloons maximum height.