I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.

Slides:



Advertisements
Similar presentations
International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Advertisements

Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
I-Web Documentation Part V – I-Web Access FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8.
Program Management Portal: Overview for the Client
Module 4: System Maintenance Intuit Financial Services University Internet Banking Certification Training.
Time and Expense Entry.  Weekly Timesheet ◦ Time Entry  Expense Report ◦ Types of Expense ◦ Expense Report Screen ◦ Expense Entry  Team Leader Approval.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Basic Building Condition Assessment – Part 1 Prepared for Delivery through AGLEARN.
Next   back MCFRS Technology Training Personnel Accountability and Unit Roster Training Module.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
ASENT_MTTR.PPT Maintainability Predictions Last revised 8/11/2005.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Building Condition Assessment and Documentation Part II – Overview and Direction Randy Warbington, PE Facilities Program Manager Southern Region USDA Forest.
CUPSS Training Part 2 of 3 Sessions. Housekeeping Items Telephone Number for Webinar Support – To Ask a Question – Type your question in.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Mandatory Annual ACE Training Fiscal Year 2011 – 2012.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 14 Enterprise Resource Planning Systems.
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
SMART Agency Tipsheet Staff List This document focuses on setting up and maintaining program staff. Total Pages: 14 Staff Profile Staff Address Staff Assignment.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
LBTO IssueTrak User’s Manual Norm Cushing version 1.3 August 8th, 2007.
Mandatory Annual ACE Training Fiscal Year 2010 – 2011.
1 Team Leader TKS Job Aid. 2 Viewing the On-line Presentation If you are viewing this presentation via Internet Explorer for best results resize the “Notes”
Financial Planning For Major Capital Projects ECIS Annual Leadership Conference Seville, Spain April 25, 2014 Presenter: Larry Kraut.
Enhanced Travel Forms Package April 2015 Julie Hughes, Travel & Complex Payment Supervisor.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
IIS Home Screen (Teacher) Copyright © 2011 Pearson Education, Inc. or its affiliates. All rights reserved.1.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 3: Customizing Document Elements.
ADP Portal: How to Request & Cancel Time Off Into The Future June 2009 All Employees Eligible for Vacation/Sick Benefits Dalton State College Requests.
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
XP New Perspectives on Microsoft Access 2002 Tutorial 1 1 Microsoft Access 2002 Tutorial 1 – Introduction To Microsoft Access 2002.
S9k Production Floor System Ingredient Inventory Production Inventory Production Dashboard.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training RMA.
Periodic Review of JHA Reviewing job hazard analysis ensures that it remains current and continues to prevent accidents and injuries. It is possible that.
Overview of Condition Assessment Process. Main Topics to Cover in the Overview  What is a Condition Assessment? 1. Why is it important? 2. Why is consistency.
Fire Hazards Analysis the ORNL Approach Jeff Sipes Fire Protection Engineer April 17, 2007.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Management System Part II: Inventory of Radiation Sources – Regulatory Authority Information System (RAIS)
RAILER SMS Track Inspection Version
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Midwest alio ® Conference November 13-14, 2013 Fixed Assets Michael Williams.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Software Maintenance1 Software Maintenance.
AX DEVELOPMENT FOR NON- DEVELOPERS Why did my 15 minute change take 3 weeks.
Priority PDA module overview Developed in conjunction with organisations who use field service engineers, carrying out on-site installs, repairs or maintenance.
PMIS Introduction to Sunflower Release 2.9 New Features And Custom Enhancements Training Presentation US Department of Health and Human Services.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Advanced Software Engineering Dr. Cheng
Overview Rental Quote Overview
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
MICROSOFT DYNAMICS® AX
Software Application Overview
TOPSpro Special Topics
Compliance Monitoring Activities State Inspections
Microsoft Office Access 2003
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Unit I Module 3 - RCM Terminology and Concepts
Product Training RMA Where “Lean” principles are considered common sense and are implemented with a passion! ©2008 TTW.
Project Name - Testing Iteration 1 UAT Kick-off
Quick reference: entering a requisition In escape RECEIVING AN ITEM
AV 13 Avantis Capabilities for Effective Asset Management
Presentation transcript:

I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim Morrison, R3 Steve Hodges, R3 Mark McDonough PE, SRS National Facility Engineering Meeting, Portland OR, April 28 – May 1, 2008

Buildings Work Items  Work Item Screen Access  New Buildings Work Item Screen  New Work Item Tutorial  RS Means Facilities Maintenance and Repair Cost Data  Work Item Resources  Work Item Reports Portland, OR Forest Service National Facility Engineering Meeting

Buildings Work Item Screen Access

Note: Remember Real Property Surveys Can Be Entered

Work Item Screen – Basic Tab

Work Item Screen – Complex Tab

Buildings Work Item Tutorial Buildings Work Item Tutorials Link:  Three Buildings Work Item Tutorials  Access The Work Items Form Via The Buildings Application  Mark A Task as Complete  Add a Basic or Complex Task To A Building

RS Means Cost Data

Work Item Cost Factors  FOREST SERVICE STANDARD FACTORS Design – 10%Contract Admin – 10%Overhead – 15%  HERITAGE FACTOR Historic Buildings  REMOTENESS FACTOR (Only Factor Controlled by Field) - Calculated From “Estimated Travel Time” Field Travel Time Cost Factor 1 Hour (Default Setting) 1 2 Hours Hours 2 8 Hours 3 > 8 Hours 4

DATA DICTIONARIES  NEW BUILDINGS WORK ITEM DATA DICTIONARY  BUILDINGS MODULE DATA DICTIONARY Buildings_User_Board.htmhttp://fsweb.r6.fs.fed.us/eng/facilities/user_board/ Buildings_User_Board.htm

Work Item Reports BLDWK03JRL REPORT – Provides List of All Work Items For A Building

Work Item Reports

NEW TASK LEGACY TASK

Printing Condition Assessment Forms NEW TASK  Run BLDSRV01JRL Report

Printing Condition Assessment Forms NEW TASK  Run BLDSRV01JRL Report - Can Query Security ID, Admin Org, Building ID, or Building Type

Printing Condition Assessment Forms NEW TASK  Run BLDSRV01JRL Report

Printing Condition Assessment Forms  The BLDSRV01JRL Report will print with all the building information completed  Inspector Name, Inspection Date must be filled in  Fill in Travel Time on Building Details screen  Will automatically print basic or complex (can be changed)  Print & take this form to the field to use during assessments

Annual, DM, Capital Improvement Name: TASK TYPE Definition: The type of work being completed. It either is annual maintenance, deferred maintenance, or capital improvement. 1. Annual Maintenance. Work performed to maintain serviceability or repair failures during the year in which they occur. Includes preventive and/or cyclic maintenance performed in the year in which it is scheduled. Unscheduled or catastrophic failures of components or assets may need to be repaired as a part of annual maintenance. Annual maintenance may include repairs, preventative maintenance, and cyclic maintenance. 2. Deferred Maintenance. Maintenance that was not performed when it should have been or when it was scheduled. When allowed to accumulate without limits or consideration of useful life, deferred maintenance leads to deterioration of performance, increased costs to repair, and decrease in asset value. Deferred maintenance needs may be categorized as critical or noncritical at any point in time. Continued deferral of noncritical maintenance will normally result in an increase in critical deferred maintenance. All work items default to DM in I-Web, users must select other task type when applicable. 3. Capital Improvement. The construction, installation, or assembly of a new fixed asset, or the significant alteration, expansion, or extension of an existing fixed asset to accommodate a change of purpose.

REASON Name: REASON Definition: The reason that justified performing the work. 1. HEALTH AND SAFETY: Addresses a threat to human health and safety that requires immediate interim abatement or long-term permanent abatement. 2. RESOURCE PROTECTION: Addresses a threat or risk of damage, obstruction, or negative impact to a natural or cultural resource. All work items default to this reason, user must select other reasons when applicable. 3. FOREST MISSION: Addresses a threat or risk to carry out the mission of the organization. Needs are related to administration and providing services (transportation, recreation, grazing, etc.) and are not covered by Health and Safety reasons or Resource protection.

WORK ITEM PRIORITY Name: WORK ITEM PRIORITY Definition: The priority of the task to be completed.  CRITICAL: A requirement that addresses a serious threat to public health or safety, a natural resource, or the ability of the organization carry out its mission. (Financial Health – Common Definitions for Maintenance and Construction Terms, July 22, 1998).  NON-CRITICAL: A requirement that addresses potential risk to public or employee safety or health, compliance with codes, standards, regulations etc., or needs that address potential adverse consequences to natural resources or mission accomplishment. (Financial Health – Common Definitions for Maintenance and Construction Terms, July 22, 1998).

New Buildings Work Item Screen Features  Burden of cost estimating removed from the condition survey process  Costs automatically updated annually via RS Means  Consistent, Repeatable, Defendable process as required by OIG  Tabs: Basic, Complex, RS Assem, RS Unit$  Custom Work Items – Coming Soon, Recommended to be used only when Basic, Complex, RS Assem, RS Unit$ tabs do not contain needed item  Basic Buildings – All buildings with no mechanical, electrical, plumbing systems, approximately 30,000 FS facilities  Basic & Complex forms appear by default to Category and Subcategory, but can be changed by selecting the alternate form when appropriate  Work items needed prior to next survey can be entered by populating the “Planned Start Date” and selecting “Annual Maintenance” task type  If “Planned Start Date” of a task passes before task is checked “Complete”, the task type will automatically change to “Deferred Maintenance”

New Buildings Work Item Screen Features  Legacy Tasks  Easily identified by Cost Factor = 1  Direction to close out all legacy tasks after one 5-year survey cycle  Check “Complete” box to close task  Delete tasks that are converted to new condition survey form tasks  Delete tasks that are no longer needed or do not match new Basic or Standard condition survey work items  “Actual $” & “Actual Finish” fields are optional for local cost tracking  Must populate “Estimated Travel Time” field on main building form for correct Remoteness Factor to be applied to work items

Future Developments and Ideas  Use input from field to update and modify work items and forms after first year of data collection and reporting  Basic and Complex form printed from I-Web with header information auto-populated  Form will identify if building is listed on RP Inventory  Mobile application similar to ERL (data logger or PDA)  Selection of corporate Maintenance Management System software, use is optional  Custom work item tool is under development  Tools to use I-Web RS Means data for detailed project cost estimates

Building Work Item Resources  Tutorials for I-Web Buildings Work Items:  Buildings Data Dictionary and Buildings Work Item Data Dictionary

Real Property Separation of Duties Clause  View “2007 Instructions” at this link for alternative solutions to Separation of Duty requirements for Real Property Inventory takers who are also Infra Data Stewards

 Powerpoint presentations available in folder “Facility Condition Assessments” at: Condition Survey Training Documents Facility Condition Assessments