PEEM III Endstation Design Review

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Vacuum Vessel Production Readiness Review
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
ELI-NP The Way Ahead-Workshop March 10-11, 2011 Vacuum System for Beam Transport Catalin M. Ticos National Institute for Lasers, Plasma and Radiation Physics.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
SR Vacuum Systems and Front Ends
MERLIN BEAMLINE RIXS refocusing mirror system D. Yegian
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
N.L. Tran, J.Z. Sexton, T.J. Grassman, B. Fruhberger, A.C. Kummel University of California, San Diego S.V. Patel, T.E. Mlsna Seacoast Science AFOSR MURI#
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
SAXS/WAXS Conversion for Beamline Engineering Review.
Magnet development experiments B. Plaster Last collaboration meeting (February 2007) x : field direction y : “vertical” z : axial N = 40 cos θ coil 1/7-prototype.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
MERLIN RIXS Endstation Design Review
THE IOWA IQ-2 Q MACHINE. Schematic diagram of IQ-2 HP-E HP-W Pumping system 30 cm 198 cm 60 cm 63.5 mm 50 cm.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SCH Controls Readiness Review- Cryostat Nov 4-5, 2015 Kurt Cantrell.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
Developments of the FETS Ion Source Scott Lawrie.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
EBTF Design Review Technical Meeting Group
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Additional Upstream Coil Shielding
Cryomodule Assembly Plan
(WBS ) Alan Wootton, LLNL April 24, 2002
CRYOMODULE FINAL ASSEMBLY
BGC Collaboration Meeting –
SNS PPU Cryomodule Space Frame
Vacuum System Design for the Target Monolith System
Presentation transcript:

PEEM III Endstation Design Review Endstation Layout Support System Vessel Magnetic Shielding

PEEM III Endstation Design Review Endstation Layout – Sector 11

PEEM III Endstation Design Review Endstation Layout

PEEM III Endstation Design Review Microscope Sample Prep and transfer General HV – UHV in Sample and Mirror Sections < 2x10-7 Gauss AC Field Nanometer Scale Stability-Sample to Optics “Easy” access to internal components

PEEM III Endstation Design Review Microscope - Details Fiber-Optic Laser Separator Replacement Optics Internal Support 5-Axis Sample Manipulator UHV Sub-Chamber 90 degree Optics and Mirror CCD Cameras

PEEM III Endstation Design Review Support System High stiffness - vibration isolated internal support Semi-kinematic mounting Epoxy-granite filled base Visco-elastic damping Isolated chamber and external components

PEEM III Endstation Design Review Support System - Assembly Install/Align base stand with visco-elastic damping pads Install/align filled base Side mounting pads for jacks/ball plates Mount internal table support legs and align fiducialized table (or plate) Install/align struts and chamber

PEEM III Endstation Design Review Vacuum Vessel

PEEM III Endstation Design Review Vacuum Vessel - Details HV required – UHV desirable SS plate weldment Differentially pumped, double o-ring, window frame to lid seal “Standard” conflat ports

PEEM III Endstation Design Review UHV Sub-Chamber - Details Aluminum conductance limited UHV-HV sub-chambers O-Ring base/lid seal Glass viewing window Be-Cu sheet interface

PEEM III Endstation Design Review UHV Sub-Chamber - Details

with 10" OD tee pumping system, 800 l/s ion pump + 1000 l/s turbo Table 5. Gas loading on the Main Peem3 chamber and pressure after 100 hours with 10" OD tee pumping system, 800 l/s ion pump + 1000 l/s turbo Main PEEM3 vacuum tank Outgassing rate 100hrs Area Gas load fraction torr l/s/cm^2 cm^2 torr l/s % Al tank 1.00E-10 33500 3.35E-06 4 Mu metal 203225 2.03E-05 27 Al optic table 5000 5.00E-07 1 Separator magnet 3500 3.50E-07 Epoxy Castal E301-KT,RT75 2.56E-07 173 4.43E-05 59 kapton wires 1.00E-09 2000 2.00E-06 3 Viton O-ring double (cm) 3.00E-10 300 9.00E-08 Viton O-ring 20 KF40(cm) 1.80E-08 251 4.52E-06 6 Total outgas rate 7.54E-05 Main tank pump l/s 880.95 Pressure in main tank torr 8.56E-08 torr

Schematic arrangement of Peem3 pumping for UHV sub-section and main tank Tee Cu/Be rolled sheet Hole for electrons Main Pumping Adaptor Mu metal Stove Pipe UHV Pump Tee UHV sub- chamber Turbo Window Valve UHV Pump bellows Main Pumping Bellows Ion Pump 2 Main microscope tank Ion Pump 1

Table 7. Gas loading on the UHV sub-chamber and pressure after 100 hours with 8" OD tee pumping system and 800 l/s ion pump. Pressure in main tank = 8.5e-8 torr. Sub UHV chamber Box 20x20x20cm - 1/2" Al plate with viton O ring seals Outgassing rate 100hrs Area Gas load fraction torr l/s/cm^2 cm^2 torr l/s % Al sub chamber tank 1.00E-10 2400 2.40E-07 36 Lenses 5.00E-10 180 9.00E-08 14 Ceramic 2.30E-10 4.14E-08 6 Sample manipulator 400 9.20E-08 Viton O-ring (cm) baked 3.00E-10 240 7.20E-08 11 Total outgass rate 5.35E-07 81 Leaks from main tank area cm^2 length cm Conductance l/s 25um gaps in overlap sleeve walls 0.25 1.2 1.12038 (2x4" and 3x1.5" sleeves) 2mm Aperture for electrons 0.0314 0.36688 total leak conductance 1.48726 l/s Gas load of leak torr l/s 1.27E-07 19 Total gas load 6.63E-07 100 UHV sub-ch pump l/s 269.65 P in UHV sub-cham torr 2.46E-09 torr

PEEM III Endstation Design Review Magnetic Shielding

Magnetic Shielding requirements require < 2x10-7 Gauss AC AC field on the floor of +-0.3mGauss (1Hz) Need attenuation of ~ 2500 Crude cylinder model indicate 2 layers attenuate ~1600 3 layers attenuate ~ 26000 Better calculation by Amuneal suggest 3 layer attenuation ~ 7000 Thickness of shield = 3mm for mechanical rigidity Shield spacing = 25mm – as large as possible given space constrains Degaussing of inner shield with AC and internal coils Magnetic field at Peem3 location Model of mu metal shields with Vacuum chamber removed

PEEM III Endstation Design Review Magnetic Shielding 3 Concentric boxes with ~ 1’’ gap Assembled from outside – in Separated with aluminum spacers/handle mounts PEM fasteners @ ~3.5” spacing No penetrations > 5 diameters in critical areas - tubulations ~ 3 diameters in 2 pump sections

PEEM III Endstation Design Review Magnetic Shielding Tubulation Details

PEEM III Endstation Design Review The End (Hopefully)