APPEARANCE OF THE TANK BEFORE THE COATING INSTALLATION OF THE SCAFFOLDINGS
INSTALLATION OF COMPRESSOR & PIPPING THE BLASTING POT PREPARATION,TEST BLASTING FOR PROFILE & CHECK FOR PRESSENCE OF OIL
MATERIALS TO BE USED FOR THE INTERNAL COATING CHECKING THE SURFACE TO A WHITE METAL FINISH
CONDUCT CHLORIDE TEST FOR SALT CONTAMINATION TEST RESULT 1PPM (3 PPM IS THE MAXIMUM VALUE)
APPLICATION OF ENECON PUTTY TO THE JOINT & DEEPLY PITTED AREA CONDUCT WET FILM THICKNESS DURING APPLICATION 1 ST COURSE COATED WITH ENECON CHEMCLAD SC
2ND COURSE COATED WITH ENECON CHEMCLAD SC APPLICATION FROM 3 RD COURSE TO THE TOP AREA, 1 ST PART APPLICATION FROM 3 RD COURSE TO THE TOP AREA, 2 ND PART
APPLICATION FROM 3 RD COURSE TO THE TOP AREA, 5TH PART APPLICATION FROM 3 RD COURSE TO THE TOP AREA, 3 RD PART APPLICATION FROM 3 RD COURSE TO THE TOP AREA, 4 TH PART
FINISHING OF THE TOP PART OF THE & THE ENTIRE 6 COURSE BLASTING & PAINTING OF THE BOTTOM PART OF THE TANK
AREA BEING REPAIRED A 12X16 HOLE WAS MADE & DAMAGED THE COATING FINAL APPEARANCE OF THE AREA AFTER THE REPAIR WITH ENECON PUTTY & OVERCOAT WITH CHEMCLAD SC
TANK 2 BEFORE ENECON CHEMCLAD SC APPLICATION TANK 2 AFTER ENECON CHEMCLAD SC APPLICATION