The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR 4 th February 2011.
USHA Autumn Seminar in association with AUDE A Presentation by Richard Habgood APS President Thursday, 12 th September 2013.
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
H EALTH & S AFETY Alan Kaye District 1070 Health & Safety Officer.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 “They’re out and they come into force on 6 th April 2015” Presented by Dave Carney (Director of Carney.
CDM 2015 A project is more than just a construction site Martin Lee Group SHEQ Manager.
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
The Construction (Design & Management) Regulations
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
WHS Management Plans.
Health and Safety Executive Construction (Design and Management) Regulations 2007 Proposed revision.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
UK’s CDM Regulations 2007 and its Applications in Singapore
CDM - The Role of The Principal Contractor By John Johnston AIIRSM Health and Safety for Beginners
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
April 2006 Managing Health & Safety Kevin Burniston Lisa McCaulder.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
CDM 2015 – HSE’s PERSPECTIVE Health and Safety Executive
9 SEPTEMBER 2015 – KATHERINE MORRIS AND LUCY BOCHENEK Is it possible to comply with the safety aspects of the Petroleum & Gas (Production & Safety) Act.
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Health and safety presentation for the compulsory schooling sector Health and safety Everyone’s business.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
CDM 2015 What we’ve learnt so far 20 October 2015.
Health and safety Everyone’s business
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
IOSH Midlands South Branch Legal Update 30 September 2015 Andrew Litchfield – Wragge Lawrence Graham & Co LLP.
Health and Safety Executive Health and Safety Executive HSE update September 2015 Liz Hunter HSE Inspector of Health and Safety.
CDM 2015 Simon Longbottom 20 May Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Be Prepared For Change Are you Prepared?. Be Prepared For Change Are you Prepared?
CDM Construction Design and Management
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Being there When you need us Thats our policy. Construction (Design & Management) Regulations 2015.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
The heart of health and safety. CDM 2015 HSE Consultation A short overview from the IOSH Construction Group John Lacey & Paul Haxell.
Leading transport safety
Sentencing in health and safety cases – The impact of the new regime
CDM Client Briefing Tim Knowles
Jamie McPherson Partner – MVM Legal
Jennifer Mills, Partner Rachael Judge, Associate Anthony Harper
HSE Update Lisa Skinner HM Inspector of Health & Safety
What happens if it all goes wrong?
Leading transport safety
Leading transport safety
Leading transport safety
Design Risk Management Spotlight on CDM 2015
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing.
Expensive commercial practices
The ICO: New Powers and Penalties
Effective Construction Safety Management
Client duties on CDM Regulation 2015
Presentation transcript:

The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015

The Rail Safety Summit  2015 SEAN ELSON Partner, Pinsent Masons LLP

The Rail Safety Summit  2015 LEGAL H&S DEVELOPMENTS 2015 Watch This Space Sean Elson Partner Pinsent Masons LLP

The Rail Safety Summit  2015 FOR TODAY Removal of fine limits in magistrates courts Sentencing guideline proposals Revision of CDM

The Rail Safety Summit  2015 Sentencin g developments

The Rail Safety Summit  2015 SENTENCING DEVELOPMENTS Limits on fines in the magistrates’ court ends S.85 Legal Aid, Sentencing & Punishment of Offenders Act 2012 Offences committed post 12 March 2015 Magistrates’ no longer restricted to £20K for each offence Consider what this means: –Magistrates could imposed multi-million pound fines – how likely is this? –Will have significant impact on tactics and strategy – will benefits accrue for large companies in trying to keep less serious cases in the magistrates’ court?

The Rail Safety Summit  2015 SENTENCING – A DEVELOPING THEME There is no good news (for dutyholders) in relation to sentencing developments! Now an additional liability to pay increased court costs Proposals to introduce sentencing guidelines – if adopted will result in a game changing level of fines for large and very large companies

The Rail Safety Summit  2015 OVERVIEW The Sentencing Council published its consultation on introducing sentencing guidelines for all health and safety offences and corporate manslaughter on 13 November 2014 Consultation ended 18 February 2015 – guidelines likely The proposals for fines are far in excess of current levels Key issues will be level of culpability and seriousness of risk harmed

The Rail Safety Summit  2015 DEFINING CULPABILITY Level of culpability extremely important Very High Deliberate breach or flagrant disregard of the law High Fell far short of the appropriate standard Medium Fell short of standard in a manner that falls between descriptions in high and low culpability Low Did not fall far short of appropriate standard

The Rail Safety Summit  2015 ISSUES RELEVANT TO CULPABILITY High –Failing to put in place measures recognised as standards in the industry –Ignoring concerns raised by employees or others –Failing to make changes after prior incidents –Allowing breaches to subsist over a long period of time Low –Significant efforts were made to address risk but inadequate on this occasion –No prior event or warning indicating a risk

The Rail Safety Summit  2015 WHAT MAY THE PROPOSALS MEAN? Fines for large (over £50m turnover)/very large companies could be substantially higher (NB: Fines in relation to rail related cases have been relatively high anyway) The extent to which processes were in place as opposed to an isolated lapse may become a litigation battleground Establishing whether culpability was “low” will be very important in setting fines Even more important to show existing procedures are in place and are effective/what do others in the industry do? Very large companies may fall outside the ranges in the Guidelines and “all bets are off”

The Rail Safety Summit  2015 CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015

The Rail Safety Summit  2015 KEY CHANGES Principal Designer role introduced CDM 2015 new L Series Guidance from HSE Change in notification criteria Removal of strict “competence” requirements CDM Co-ordinator role abolished Increased client responsibility 6 month transition period from CDM 2007

The Rail Safety Summit  2015 NOTIFYING PROJECTS – SIGNIFICANT CHANGE Requirement to “notify” a construction project to the HSE will change Criteria –Work scheduled to last longer than 30 working days and have more than 20 workers working simultaneously at any point in the project; or –Exceed 500 person days But – notification is now an end in itself – it is no longer a trigger for additional duties such as a construction phase H&S plan or appointment of a co-ordinator/principal contractor

The Rail Safety Summit  2015 TRIGGERS & NOTIFICATION – CHANGE OF MINDSET A construction phase H&S plan is now required on all construction projects – no matter how small Where there is more than one contractor then a principal designer and principal contractor must be appointed – in writing

The Rail Safety Summit  2015 MORE THAN ONE CONTRACTOR - THE CLIENT’S LEGAL DUTIES Appoint the principal designer Appoint the principal contractor Must take reasonable steps to ensure that the principal designer and principal contractor comply with their duties Provide the health & safety file to the person acquiring a structure if they dispose of their interest

The Rail Safety Summit  2015 CLIENT DUTY TAKEAWAY A CDM client must take “reasonable steps” to ensure that PD and PC comply with their duties (e.g. for the PC - throughout the construction phase) CDM 2007 Regulation 9 – take “reasonable steps” to ensure that the arrangements made for managing the project….by persons with a duty…..are suitable to ensure etc. A wider responsibility – what is the HSE guidance?

The Rail Safety Summit  2015 PRINCIPAL DESIGNER DUTIES: MORE THAN A CDMC ? Must plan, manage and monitor the pre-construction phase and co-ordinate H&S matters Plan work stages and estimate the time required to complete them Take account of the general principles of prevention (construction, maintenance & intended use) Ensure other designers comply with their duties Ensure co-operation between parties Must assist the client in the provision of pre-construction information and provide to others Must prepare the H&S file and ensure that it is reviewed and updated

The Rail Safety Summit  2015 PRINCIPAL DESIGNER – DURATION OF APPOINTMENT Client duty is to appoint a PD with control over the pre-construction phase PD need not remain throughout the life of the construction phase – though may do so (CDM both CDMC and PC at all times until end of the construction phase) HSE draft guidance recognises this If appointment ends the H&S file must be passed to PC who then review & update (Regulation 12(8) & page 36 draft guidance)

The Rail Safety Summit  2015 PRE-CONSTRUCTION PHASE REDEFINED A key change Pre-construction phase now defined as: “..any period of time during which design or preparatory work is carried out for a project and may continue during the construction phase” In other words – the PD role could extend up to practical completion to the extent that changes may be made to the design or use of materials (this was the HSE intention and is not an unintended consequence)

The Rail Safety Summit  2015 PD ISSUES Who will be competent? Not just CDMC with a different hat Will clients seek to impose role on PC or designers – consider contractual terms PI cover! How will this engage over the coming months?

The Rail Safety Summit  2015 PRACTICAL ISSUES Interactions (including PD) Appointments and PD on small works How will clients respond? What will this all look like? Construction Phase Plan for all construction works

The Rail Safety Summit  2015 CONCLUSIONS Not much change for PC’s managing construction phase Intended to enhance the Client role but will the reality reflect this The PD role will take some time to shake out Additional guidance might bring greater clarity – but does it need to be an ACoP?

The Rail Safety Summit  2015 RAIL SAFETY SUMMIT 2015