R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.

Slides:



Advertisements
Similar presentations
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Advertisements

Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
1HG may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
30 GHz waveguide line modification towards 12 GHz.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
CTF Operations & Plans Piotr Skowroński for the CLIC Collaboration 27 January 2015 CLIC Workshop
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
J.L. Navarro (CERN), for the CLIC/CTF3 collaboration.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
What is needed for the operation, the resources, infrastructure issues and plans for 2009 and beyond. Impact of short shutdown in 2010 Piotr Krzysztof.
Recent results from CTF3 Piotr Skowroński for the CTF3 Collaboration 22 January 2016 CLIC Workshop
CTF3 Brief Summary W. Farabolini on behalf of the CTF3 team W. Farabolini - CLIC Project Meeting #19119 Dec
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CALIFES A proposed electron beam test facility at CERN
Phase Feed-Forward Piotr Skowroński (CERN)
First Year of Operation at the Two-beam Test Stand
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
CLIC Drive Beam Klystron Modulators
Recent high-gradient testing results from the CLIC XBoxes
Linac/BC1 Commissioning P
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 2 Drive Beam generation Routine operation of factor 8 in the last few weeks ( A). Still limited to 2 TWTs, with one at about ½ of nominal power. Still need improvements on emittance/stability (hopefully easier with 2 (3) full TWTs). Two Beam Test Stand Structures to about nominal CLIC power. Wakefield monitors commissioned and measured, in the presence of X-band RF power. TBL Deceleration to about 35% of a 22 – 24 A beam. Commissioning and measurements of CLIC drive beam stripline BPM prototype. CALIFES Commissioning and measurements of CLIC main beam BPM prototype. First results from Electro-Optical (EO) bunch length monitor, bunch compression tests. Beam-Loading experiment in dog-leg Beam line commissioning with beam and first RF measurements. Drive Beam phase feed-forward Full commissioning of phase monitors, measured resolution, good indication on bandwidth. First tests with FONT5 electronics. Highlights

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 3 Beam recombination Factor 8 Routine operation of factor 8 in the last few weeks. Still limited to 2 TWTs One TWTs slowly failing – oscillating around about ½ of nominal power By switching the two TWT, managed to find good operating point, with performance slightly better than last year’s Still need some improvement (stability, emittance) – should be able to get back 2 fully operational TWTs at the restart, plus a 3 rd before the end of the run. Emittance Best results in CLEX for factor 4:  H = 170 um  V = 120 um for factor 8:  H = 550 um  V = 170 um Different turns are ~ ok, no unknown effects Emittance increase due to non perfect orbit Emittance Best results in CLEX for factor 4:  H = 170 um  V = 120 um for factor 8:  H = 550 um  V = 170 um Different turns are ~ ok, no unknown effects Emittance increase due to non perfect orbit Drive Beam Generation 2013 Goals  H =  V ≅ 150 um for factor 8 charge stability  Q ≈ Goals  H =  V ≅ 150 um for factor 8 charge stability  Q ≈ End st run st run 2013

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 4 Injector feedback – use phase and waveguide (bunch length) signals to feed back on phase of MKS2 and MKS3 and stabilize injector Drive Beam Generation - feedbacks Beam phase after MKS2 Waveguide (bunch length) signal after MKS2 & MKS3 L. Malina, P. Skowronski Beam phase after MKS3 Beam current after injector chicane

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 5 TBTS – Present configuration Two new Structures (TD24 type) installed Equipped with wake-field monitors Two new Structures (TD24 type) installed Equipped with wake-field monitors TD24 with wake-field monitors CEA IRFU - Saclay

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 6 Flange with Wakefield monitor feedthroughs Accelerating structure support Vacuum tank support RF cables for WFM signals with a particular shape for mounting and best fitting Quantity: 16 Same length: 900 mm Vacuum compatible (Stainless steel / SiO) Accelerating structure n°1 Vacuum tank Vacuum valve Accelerating structure n°2 Probe beam RF input and output waveguides CEA IRFU - Saclay DVG385y_ACSup 8.12 A mm 8.13 A mm ⇨ 25 um DVG385y_ACSup 8.12 A mm 8.13 A mm ⇨ 25 um TBTS – Present configuration 2013 Goal Full characterization of WF monitor, with high power in fundamental mode 2013 Goal Full characterization of WF monitor, with high power in fundamental mode

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 7 W. Farabolini WFM signals No probe Beam Drive Beam No RF power WFM signals No probe Beam Drive Beam No RF power WFM signals No probe Beam Drive Beam RF power WFM signals No probe Beam Drive Beam RF power WFM signals Probe Beam No Drive Beam No RF power WFM signals Probe Beam No Drive Beam No RF power WFM signals Probe Beam Drive Beam No RF power WFM signals Probe Beam Drive Beam No RF power WF Monitor with Drive Beam – RF in fundamental mode WFM signals Probe Beam Drive Beam RF power WFM signals Probe Beam Drive Beam RF power

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 8 Test Beam Line 2012: Reached about 30% deceleration (18 A beam) 2012: Reached about 30% deceleration (18 A beam) Potential to exceed 40% 2013 Goal

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF st run: 35% deceleration (22 A beam) st run: 35% deceleration (22 A beam) 2013 Goal R. Lillenstol, S. Doebert Quad scan Downstream end of TBL Quad scan Downstream end of TBL

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 10 Unloaded Loaded (CLIC) Increasing current Gradient along the structure CLEX LINAC DELAY LOOP COMBINER RING BL - BDR experiment Beam loading reduces field locally in the structure ⇨ is it the break-down rate lower (or higher)? CLEX probe beam has only limited current/pulse length, CLEX Drive beam has limited rep rate ⇨ use CTF3 drive beam and klystron driven X-band structure Reactivate the old ‘30 GHz PETS’ line, 1 A DB current, can reach 50 Hz Measure BDR with/without beam to get a direct comparison Experiment on the effect of Beam-Loading on BD rate Average gradient 100 MV/m Drive beam, 1-3A, MeV  50 mm circular waveguide RF T24 structure installed in CTF Goals Beam set-up, transport, RF signals check After summer shut-down: structure conditioning with klystron, break-down rate measurements 2013 Goals Beam set-up, transport, RF signals check After summer shut-down: structure conditioning with klystron, break-down rate measurements st run: Beam line commissioning with beam (1 A) and first measurements of produced RF power st run: Beam line commissioning with beam (1 A) and first measurements of produced RF power J.L. Navarro, F. Tecker

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 11 Phase monitor (INF-LNF, EuCARD) Final values for phase monitors looks good. Around 0.08 degrees (12 GHz) per 1 mm vertical offset in monitor 3, 0.05 degrees for monitor 1. Comparison with existing monitors Commissioning of INFN Phase monitors nd run Goals Summer shut-down: installation of kickers/amplifiers Autumn: first feed-forward tests nd run Goals Summer shut-down: installation of kickers/amplifiers Autumn: first feed-forward tests

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 12 P. Skorwonski, A. Andersson, E. Ikarios Full commissioning of phase monitors, measured resolution, good indication on bandwidth. First tests with FONT5 electronics. Ready for 2 nd phase. Time Response of Phase Monitors Energy step Phase switches Phase feed-forward Commissioning of INFN Phase monitors Phase feed-forward Commissioning of INFN Phase monitors

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 13 CTF3 as diagnostics test bed Stripline Drive Beam BPM in TBL (CERN-LAPP) Cavity Main Beam BPM in CALIFES/TBTS (CERN-JAI at Royal Holloway) Electro-optic bunch profile monitor in CALIFES (CERN-Dundee University) 2013 Goals R. Pan, T. Lefebre

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 14 F. Cullinan, J. Towner, W. Farabolini, M. Wendt… Cavity Main Beam BPM in CALIFES/TBTS

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 15 Milestones 2013 TBTS Beam Loading experiment TBL DB Phase Feed-Forward CTF3 Drive Beam generation & operation   H =  V ≅ 150 um for factor 8  Charge stability  Q ≈ for factor 8  Beam diagnostics experiments (DB and MB BPMs, EO bunch length monitor)  Full conditioning and break-down rate measurements of TD24 structures - characterization of WF monitor, with high power in fundamental mode  Prove power production with correct pulse shape for beam loading compensation of probe beam  Prepare for installation and commissioning of first module  Deceleration beyond 40%  TBL+, get at least on new PETS constructed and installed with ON/OFF mechanism.  Full characterization of monitors  Summer shut-down: installation of kickers/amplifiers  Autumn: first feed-forward tests  1 st phase: commissioning with beam  Start 2 nd phase, RF conditioning and BDR measurements THANKS TO ALL THE CTF3 CREW! (operation team, technical support & external collaborators) THANKS TO ALL THE CTF3 CREW! (operation team, technical support & external collaborators)

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 16

R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 17