B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.

Slides:



Advertisements
Similar presentations
Unit 8 Fastening Systems
Advertisements

Steel Erection §1926 Subpart R Rev 1: 11/15/2012
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
Pipe Supports and Hangers
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Advanced Construction Technology
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Concrete Pre Cast Panel By Peter Spence ID:
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Foundation Systems.
Chapter 7 Metals.
Rectangular framed structures
Created by Travis Pettaway
Floor Systems and Foundation Support
HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
Chapter 4 Measuring Concrete Work
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
Update of anchoring procedures for the ALS floor 09/19/2007.
Earls Mill Road Retaining Wall Ground Anchors and Strengthening.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
Moment Connection Requires Bolts Outside the Flanges
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
Chapter 43 Common Commercial Construction Materials.
Fundamentals of Structural Detailing
Prestressed Concrete I.  *Unfavorable effects induced from the presence of cracking in reinforced concrete: To expose the reinforcement to corrosion;
INTRODUCTION SUPPORT STRUCTURSE FORCE - LONGITUDINAL FORCE - TRANSVERS
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
6.03 Tools in Agricultural Engineering Obj. 6.03: Remember tools and their safety practices related to the agricultural mechanics industry Images courtesy.
Objective 6.03 Remember tools and their safety practices related to the agricultural mechanics industry.
C OLUMNS S LIDE S HOW. Columns are brought in with a crane and placed on over their respective base plates and fastened once they are plumbed, tie down.
IN MODULAR CONSTRUCTIONS
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Foundation Loads Dead Load Live Load Wind Load
DESIGN OF COLUMN BASE PLATES AND STEEL ANCHORAGE TO CONCRETE Elena Papadopoulos ENCE 710 Spring 2009.
M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA.
Riser And Lid Assemblies. Description Risers and Lid assemblies are components designed to provide access and security at grade level to system components,
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Design of Bracing Connections in Concentrically Braced Frames
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Warm Vessel Leveling Islands (Piers)
Foundation – jay Desai.
Sardar Patel Institute Of Technology
Remember tools and their safety practices related to the agricultural mechanics industry. Objective 6.03.
Plan for the installation of the TAMU screen
Gang Form Fall During Installation
Steel Erection 29 CFR 1926, Subpart R
CONNECTIONS IN STEEL STRUCTURES
MACHINE PARTS (FOR DCE / DIT)
BASEPLATES SLIDE SHOW.
Arch205 building construction floor & Roof systems
CONNECTIONS IN STEEL STRUCTURES IS CRITERIA
Experience the StructureCast Advantage!.
STEEL PLATES.
Civil engineering drawing
Chapter 7 Foundation Systems.
MACHINE DRAWING NAME : SYED AMER UR RAHMAN B.TECH 2 – 2
Concrete Tools.
INTRODUCTION TO THE NEW SUBPART R
Valve stem “gag” mechanism
Steel Erection 29 CFR 1926, Subpart R
Fixed Support Design & Testing
Presentation transcript:

B ASEPLATES S LIDE S HOW

Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect laborers.

Interior Column Perimeter Column Concrete block-outs are made so that the base plate and anchor bolts are recessed below floor level for safety and aesthetics.

Base plate holes are located and drilled in the shop. The base plates were shop-welded to their respective columns and shipped to the site. Slotted holes are allow for difference in standard field tolerances between concrete and steel.

Base plate and column installation is complete. The column is leveled by adjusting the anchor bolt nuts below the plate. Interior and perimeter column installations are complete. After inspection, the block outs will be filled with concrete to floor height for a uniform appearance and safety. Grout will be placed under and around the base plate to smoothly transfer axial forces to the concrete below.

Yes! They do miss, and field corrections are made!