Prosjektstyring bma ACTIVITY 6 13 16 9 8 5 10 12 8 6 4 8 9 7 5 A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Prosjektstyring A 5 WEEKS B 10 WEEKS C 12 WEEKS D 8 WEEKS E 6 WEEKS ACTIVITY (t) ESEF FL LS LF We have a network with.
Statistical Techniques I
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Prosjektstyring A (12) B (10) C (12) D (9) E (18) F (11) H (10) G (11) I (7) FF3 SS8 FF5 FF7FS0 SF21 SS8 FF3.
MGMT 483 Week 8 Scheduling.
Measures of Dispersion and Standard Scores
ME 380 Project Planning. Critical Path Method (CPM) Elements: Activities & Events Feature: Precedence relations ActivityDurationPrecedence A4- B5- C3A.
In the name of Allah the Most Gracious the Most Merciful.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
LINE DIAGRAMS Learning objectives After this lecture you will be able to: Prepare and use line diagrams Demonstrate the effect that making activities ‘continuous’
1 Examples. 2 Say a variable has mean 36,500 and standard deviation What is the probability of getting the value 37,700 or less? Using the z table.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
EMGT 501 HW # Due Day: Sep 27.
Solutions to Chapter 12 Exercises
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
SEEM 3530 Program Evaluation and Review Technique
The Sampling Distribution of the Sample Mean AGAIN – with a new angle.
MATHEMATICS 3 Operational Analysis Štefan Berežný Applied informatics Košice
Prosjektstyring Expected Present value - project A We will choose one of two projects, A or B. Project A, shown on the.
§ 5.2 Normal Distributions: Finding Probabilities.
Measures of Regression and Prediction Intervals
SECTION 6.4 Confidence Intervals for Variance and Standard Deviation Larson/Farber 4th ed 1.
S.Cholette, based on McGraw-Hill/Irwin Managing Risk.
Today’s lesson Confidence intervals for the expected value of a random variable. Determining the sample size needed to have a specified probability of.
Dan Piett STAT West Virginia University
Estimating a Population Variance
PERT Program Evaluation and Review Technique Tong Wang 511D ERB.
Confidence Interval Proportions.
Measures of Variability Objective: Students should know what a variance and standard deviation are and for what type of data they typically used.
Correlation and Regression Chapter 9. § 9.3 Measures of Regression and Prediction Intervals.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Project Scheduling Software
PERT/Activity Diagrams, Completion Probability and the Z Score
Project Planning with PERT and CPM Chapter 14
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
By: Adam Linnabery. The quadratic formula is –b+or-√b 2 -4ac 2a an example of how it is used: X 2 -4x-12=0 the coefficient of x 2 is 1 therefore the value.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
1 Mean Analysis. 2 Introduction l If we use sample mean (the mean of the sample) to approximate the population mean (the mean of the population), errors.
Standard Deviation A Measure of Variation in a set of Data.
Confidence Interval for a Single Proportion p-hat, not phat.
CHAPTER 13 DETERMINING THE SIZE OF A SAMPLE. Important Topics of This Chapter Different Methods of Determining Sample size. Standard Normal Distribution.
Chapter 6 Scheduling. 222 Learning Objectives  Estimate the duration for each activity  Establish the estimated start time and required completion time.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 7 : Risk Management – part 2
Copyright © Cengage Learning. All rights reserved. 9 Inferences Based on Two Samples.
Estimating a Population Variance
Check it out! : Standard Normal Calculations.
PERT/CPM F G A E H I J K D St T B C
Ex St 801 Statistical Methods Inference about a Single Population Mean (CI)
Section 7-5 Estimating a Population Variance. MAIN OBJECTIIVES 1.Given sample values, estimate the population standard deviation σ or the population variance.
Copyright © 2009 Pearson Education, Inc t LEARNING GOAL Understand when it is appropriate to use the Student t distribution rather than the normal.
Chapter 8 Confidence Intervals Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
PERT/Activity Diagrams, Completion Probability and the Z Score
Hypotheses and test procedures
Other confidence intervals
Section 6-4 – Confidence Intervals for the Population Variance and Standard Deviation Estimating Population Parameters.
Estimating Population Variance
Calculating Probabilities for Any Normal Variable
Confidence Intervals for a Standard Deviation
Confidence intervals for the difference between two means: Independent samples Section 10.1.
a + 2 = 6 What does this represent? 2 a
Chapter 7 Lecture 3 Section: 7.5.
PERT/Activity Diagrams, Completion Probability and the Z Score
Measures of Regression Prediction Interval
Managing Risk Chapter 7.
Chapter 7 Lecture 3 Section: 7.5.
Presentation transcript:

Prosjektstyring bma ACTIVITY A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7 / 8 / 9 E 5 / 6 / 8 We have a network with activities A, B, C, D and E, which are organized as shown at left. Three different figures have been given for the durations of each activity in the network. These figures are shown in the table under columns a, m and b. This network is the same as the network that we used in the AON network example. The most likely value of m was used in the calculation. When we calculate a PERT network, we start by calculating the expected duration of the activities with the following formula, then we set the expected value in a table.

Prosjektstyring E(t)bma ACTIVITY A B C D E The expected duration of activity A becomes: A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7 / 8 / 9 E 5 / 6 / 8 The expected duration of B becomes:Accordingly, this is carried out for activities C, D and E, and the results are set into the table.

Prosjektstyring E(t)Var(t)bma ACTIVITY A B C D E To find the variance of the activities, we use this formula: A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7 / 8 / 9 E 5 / 6 / 8 The variance of activity A becomes:Accordingly, this is calculated for activities B, C, D and E, and the results are set into the table.

Prosjektstyring E(t)Var(t)bma ACTIVITY A B C D E A (5.0) B (10.2) C (12.2) D (8.0) E (6.2) The calculation of the network is carried out with the same method as was used in the AON example, but in this case, expected values are used in the calculations. Therefore, expected values have been set as the durations of the activities in the network. By using the CPM method in the AON network, the total time of the project was calculated at 31 weeks. When we use the PERT method, it becomes 31,4 weeks. PERT gives us a more realistic estimate. The reason that we get a little longer value when we use PERT is that we take into consideration the risk that results when several of the activities have imbalanced distributions. An imbalanced distribution to the right side means that it is more likely that the duration of the project will become longer rather than shorter. This applies to activities B, C and D. Therefore, the expected value becomes a little larger than the most likely value of m. Activities A and D are distributed asymetrically. This means that there is an equal probability that they will become shorter or longer (delayed). In other words, the expected values for A and D are equal to the most likely value of m.

Prosjektstyring We calculated the total time of project by adding the durations of the activities along the critical path, which is A-C-D- E. E(t)Var(t)bma ACTIVITY A B C D E A (5.0) B (10.2) C (12.2) D (8.0) E (6.2) T  = t A + t C + t D + t E E(T  )= E(t A ) + E(t C ) + E(t D ) + E(t E ) = = 31.4 Var(T  ) = Var(t A ) + Var(t C ) + Var(t D ) + Var(t E ) = = 1.83 Now we can use values from the network or the table. We can also calculate the variance of project by adding along the critical path. For this purpose, we use the values in the table.

Prosjektstyring This means that the project has an expected duration of 31,4, and the duration has a normal distribution with a variance of 1,83. E(t)Var(t)bma ACTIVITY A B C D E A (5.0) B (10.2) C (12.2) D (8.0) E (6.2) What is the probability that the project is accomplished in 28 weeks? We will now find the probability that the total duration along the critical path becomes less than or equal to 28 weeks. We will use the normalized normal distribution. To normalize, we subtracrt 28 from the expected value of 31,4 and divide the result by the standard deviation. The standard deviation is the square root of the variance.

Prosjektstyring Now we should look at the normal distribution table for our value. Since the normal distribution table is asymmetric, we can read it from the positive value of However, since we can not get the number directly from the table, we get the probability that the project has a duration that is over 28 weeks. Therefore, we set up this equation: By following 2,51 in the table, we read 0,994, which gives us: So the probability that the project is accomplished in 28 weeks or less is 0,6%

Prosjektstyring E(t)Var(t)bma ACTIVITY A B C D E A (5.0) B (10.2) C (12.2) D (8.0) E (6.2) Now we must find which duration should be given in order to have 90% confidence in avoiding time overrun. We will now find the probability that T  is less than or equal to value x, which is 90%. This becomes:

Prosjektstyring We can now read from the table that 0,90 corresponds to  (1,28). So we have:

Prosjektstyring E(t)Var(t)bma ACTIVITY A B C D E A (5.0) B (10.2) C (12.2) D (8.0) E (6.2) In order to be 90% sure that the project will not have time overrun, we should plan a duration of 33,1 weeks for the project.