Status Report: Welding Task Group Report to NESCC – 28 March 2013 Tom Siewert – NIST

Slides:



Advertisements
Similar presentations
AP Review Overview of UCI Pilot online review system.
Advertisements

“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Codes & Standards.
Strategy to Increase ASME’s Global Impact Michael Michaud, MD Global Alliances Orlando, FL November 16, 2009.
Spare Equipment Database Task Force
American Welding Society Nashville Section
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Engineering Technology Division
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
Status of ANS Standards Presented to NESCC 3/1/2011 Donald J. Spellman Vice Chair, ANS Standards Board.
Introduction To Ultrasonic Testing (UT)
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Orientation to the Accreditation Internal Evaluation (Self-Study) Flex Activity March 1, 2012 Lassen Community College.
Team Sponsor Defines team ’ s work boundary. Appoints team leader. Receives and reviews team reports. Reviews and critiques team recommendations. Visits.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Pressure Equipment Regulations - the introduction of a new category of AIA and the impact on SAQCC Certified Competent Persons AIA Meeting November 2010.
Provider Human Rights Coordinator Role Accessing HCSIS to Support Human Rights Committee Reviews September 11, 2013.
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
07/26/2010 National Petroleum Council Future Transportation Fuels Study - Task Group/Subgroup Overview September CSC Meeting Hydrogen Subgroup.
Elements of an Automotive Products NTBs Initiative United States Perspective.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Repair of Reinforced Concrete of Existing Nuclear Power Plants (RCTG) Chiara Ferraris, NIST Nathan Sauer, SIMCO Technologies.
National Disability Advocacy Program (NDAP) Quality Assurance (QA) – report on the FaHCSIA trial.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
PTCS Aeroseal Specification Approval Measure Proposal Presentation to the Regional Technical Forum June 28, 2011.
NE 127 – Codes, Standards, and Regulations ASTM Standards INSTRUCTOR: Chattanooga State CC.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
1 11 December 2012E&M Sub-SSCC EASA Rulemaking Update (Continuing Airworthiness) Juan Anton Continuing Airworthiness Manager Rulemaking Directorate EASA.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
Systems Design Approaches The Waterfall vs. Iterative Methodologies.
Welding Inspection and Metallurgy
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
1 SEAB Task Force on EM Technology Development Gerald Boyd Task Force Member September 29, 2015.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
TPF Certification Task Force TPF Users Group Spring 2002 Conference Orlando, Florida April 24, 2002.
Status Report: Welding Task Group Report to NESCC – 23 July 2013 Tom Siewert – NIST
IENG 423 – Designing Decision Support Systems Sample DSS Analysis.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
Senior Projects Meeting 7 September 9, Agile Development Process The players are Product owner: sets priorities, owns in the sense of is responsible.
Metal Fabrication Quality and conformity of our products 2015.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
TGDC Meeting, July 2010 Report on Other Resolutions from Dec 2009 TGDC Meeting John Wack National Institute of Standards and Technology
NESCC Meeting November 7, 2013 Advanced Nuclear Technology (ANT) Construction Speed and Quality Task Group.
ATSRAC TASK 6 W IRE S YSTEMS H ARMONIZATION W ORKING G ROUP.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
MODULE B - PROCESS. ASME C&S Training Module B1 DATESLIDECHANGE 10/31/03 17, 19, 20, 21, 22 & Notes, 23 & Notes 33 & Notes 36 Notes 41 Notes 44 References.
Requirements Engineering Requirements Management Lecture-25.
Technology Services – National Institute of Standards and Technology Implementing the National Technology Transfer and Advancement Act in the Federal Government.
Introduction to Codes, Standards, and Regulations.
ANSI/Shared Assessments PHI Project – Organizational Structure Presented By: Jim McCabe Senior Director, Standards Facilitation American National Standards.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
1 RIGHT SOLUTIONS RIGHT PARTNER Industrial. 2 RIGHT SOLUTIONS RIGHT PARTNER Testing & Inspection Asset Care Industrial.
Asphalt Paving Technical Committee (APT) Proposed revisions to the Asphalt Concrete Sections of the MAG Specifications.
Project Management Business Management.
Current Stakeholder Timelines for Issues Needing a Rapid Response
Reliability Assessment Committee Proposal TSS Meeting
Commercial Operations Sub-Committee Update to TAC
Materials and systems Pathway Subject(s): VCE Systems Engineering
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Report of the Technical Subcommittee
Start with PROGRAM REVIEW
Presentation transcript:

Status Report: Welding Task Group Report to NESCC – 28 March 2013 Tom Siewert – NIST

Objectives Review the welding standards (ASME, AWS, etc.) used in nuclear construction Look for inconsistencies between them, and areas where they lag behind current technology Make recommendations to the standards bodies that would streamline the construction of safer nuclear plants (value to stakeholders)

Team (~ 50 Participants ) About ½ representing industry (mostly chairs of AWS technical subcommittees) About ¼ representing associations About ¼ representing government

Timeline First meeting – November, 2011 – face to face Nine meetings since then (8 teleconferences and 1 face to face Final report – Fall, 2013 (target)

Structure WTG – to oversee progress and evaluate recommendations drafted by working groups Working Groups – by technical discipline o Welding Technology Fabrication Techniques – Mark Holland – Interim Chair Rebar Issues – Mike Gass – Vice Chair o Inspection Technology o Personnel/Qualification Issues – Jeff Fluckiger – Chair o Material Issues Heat Treatment – Phil Flenner -- Chair

Representative Technical Issues Waveform-based Power Sources – new electronics permit alternate pulse shapes that may fall outside traditional procedures (WPS) Phased-array Ultrasonic Inspection – new capabilities may speed inspections and find previously hidden imperfections Digital X-ray Imaging Technology – replacing film technology can speed inspections and lower consumable costs -- May also allow CT imaging slides Visual Inspection – technique may have advanced (NP 5380) Personnel Certification - increasingly being required, but PE in welding had been discontinued

Top 5 Needs (of end users) o Avoiding senseless requalification of welding procedures. Why do we need to requalify again and again to prove what we already know? The available prequalified welding procedures distributed by AWS cover only a fraction of what is needed. o Keeping individuals standards aligned with each other (especially those developed by different organizations). While AWS B2 requirements are currently well aligned with those of ASME Section IX, others are not. o Make repair decisions based on fitness-for-service assessments. Currently many repair decisions are made on workmanship standards, where unnecessary repairs often introduce additional damage that can be the source for later failures during service. Switching to repair decisions based on fracture mechanics would mean that only necessary repairs are made.

Near-term Actions Expand database with members qualifications Fill empty slots in working group structures Get top 5 needs from customers (end-users of the standards) Assign needs to appropriate working group.