Procurement status of SR main magnets Attilio Milanese 23 Nov. 2013.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Powered Magnets, DB Formation and Decelerator Alexey Vorozhtsov (JINR) International Workshop on Linear Colliders October 2010.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Daniel Schoerling TE-MSC-MNC 1 Magnets Daniel Schoerling on behalf of WP 2.2 and WP 2.16 ELENA Project Review 14 th – 15 th October IT.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Scientific support Scientific laboratories have the qualified specialists in fields of accelerator physics and technique. They calculate and model the.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
CESSAMag: magnets for SESAME Attilio Milanese CERN.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Collaboration with Normal Conducting Magnet section
Magnet Design & Construction for EMMA
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
AGENDA: 1) SDO Procurement ACTIONS has noted at last meeting (10 June): ALEXANDER: magnetic forces during assembly to be computed. In case, we could assemble.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Bending Magnets for the Metrology Light Source
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
LARP Collaboration Meeting Racetrack Coil Fabrication
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Magnets Attilio Milanese Doing Business with CERN
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Bent combined function bending magnets and optics: the case of SESAME Attilio Milanese 3 Dec
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
Report Technical Director Storage-Ring-Installation Completed
Iranian Light Source Facility, IPM, P.O. Box , Tehran, Iran
Cryostats for superconducting magnets
Some Design Considerations and R &D of CEPCB Dipole Magnet
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Procurement, Measurement and Installation of 2 Octupoles for ATF
CSP 25th November 2010 Technical agreement number 3: overview
HO Corrector Magnets: decapole test and future plans
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
(Procurement, testing of magnets)
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
Arc magnet designs Attilio Milanese 13 Oct. 2016
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
CHEN, Fusan KANG, Wen November 5, 2017
Analytical Cost Model (16 T dipole)
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Status of the PANDA Solenoid Magnet Production in BINP
ELENA Magnet Installation Planning
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
High Precision Magnet Production for NSLSII at IHEP
FNAL Superconducting Quadrupole Test
as a prototype for Super c-tau factory
ESS MEBT Quadrupole magnets
Globus-M2 will be constructed by the end of 2015
SNS-PPU upgrades the existing accelerator structure
SAME 15 existing quadrupoles (QFS, QDS, QFL)
Presentation transcript:

Procurement status of SR main magnets Attilio Milanese 23 Nov. 2013

Attilio Milanese2 Agenda reports and specifications main contracts and schedule CERN sextupole pre-series pole tip profiles TAC Nov presentation

23 Nov. 2013Attilio Milanese3 REPORTS & SPECIFICATIONS

Reports and specifications The CERN EDMS (Engineering Data Management System) is used to archive the magnet reports and specifications: it allows to handle access rights, to track changes, comments and approvals. 23 Nov. 2013Attilio Milanese4 placeholder structure for deliverables of the EC project CESSAMag

Reports and specifications Combined function bending magnets  Design Reportunder approval  Technical Specificationreleased  Technical Questionnairereleased Quadrupoles  Design Reportreleased  Technical Specificationreleased  Technical Questionnairereleased  Technical Specification Coilsreleased Sextupoles / correctors  Design Reportreleased  Technical Specification Coilsreleased  Technical Specificationunder preparation 23 Nov. 2013Attilio Milanese5

Reports and specifications Still missing from SESAME a formal specification of field quality, magnet-to-magnet reproducibility and alignment tolerances Meeting at CERN on 8 Feb gave some tentative values, no fully discussed and detailed with beam dynamics arguments 23 Nov. 2013Attilio Milanese6 Tentative values from Feb. meeting with Erhard at CERN and Maher A. analyses

The case of the bending magnet An end pole shimming scheme for the bending magnets has been proposed. The three stacks can host a variable number of ferromagnetic (1) and non- magnetic (2) shims, to act on:  the ∫ field  the ∫ gradient  the ∫ sextupole component 23 Nov. 2013Attilio Milanese7 We set up techniques to analyse field maps (both from simulations and from Hall probe mapping) and to infer the linear transfer matrices of the optics, or the equivalent pole face rotation. Still, beam dynamics objectives are needed before the pre-series dipole is measured, to define and implement optimal shimming.

23 Nov. 2013Attilio Milanese8 MAIN CONTRACTS

23 Nov. 2013Attilio Milanese9 Main contracts supplycontractorcountrycomment 16+1 bending magnetsTESLAUKcontract signed 32+1 QF and 32+1 QD quadrupoles ELYTTSpaincontract signed 140 QF QD quadrupole coils STSTurkeycontract signed 420 sextupole coil packages SEFFrancecontract signed 32+1 sextupolesCNECypruspilot order issued 32+1 sextupolesPAECPakistanprotocol prepared

Bending magnets 16+1 magnets + a set of spare coils procurement of all components directly managed by the contractor kick-off meeting 3-4 Sept (before awarding the contract), visiting both TESLA and the subcontractor for the punching, Midland Tool & Design contractual schedule  Manufacturing File25 Nov  1 pre-series dipole25 Jul  4 series dipoles19 Dec  4 series dipoles25 Mar  4 series dipoles25 Jun  4 series dipoles25 Sept Nov. 2013Attilio Milanese10

Bending magnets direct involvement of senior management: Ben Leigh, UK Engineering Director, and Simon Pittard, Director of Magnet Division parts of the Manufacturing File have already been received and approved, in particular the coil and the drawing of the lamination TESLA has ordered 120 t of steel (isovac A high perm with EB549 coating, from VoestAlpine, Austria), delivery to puncher expected beginning of Mar TESLA has ordered 11 t of hollow copper conductor (from Luvata, Finland), first conductor delivery expected mid-Feb The punching tooling is also in preparation, the first laminations are expected mid-Mar next visit on 25 Nov. 2013, for reviewing the Manufacturing File 23 Nov. 2013Attilio Milanese11

Quadrupoles 32+1 QF and 32+1 QD quadrupoles ELYTT will manage all the procurement, with the exception of the coils, which will manufactured by STS kick-off meeting 11 Sept at CERN (before awarding the contract), we had a visit to Spain in July for a similar contract contractual schedule  1 pre-series QD and QF12 Mar  8 series QD + 8 series QF27 Jun  8 series QD + 8 series QF 7 Nov  8 series QD + 8 series QF 18 Feb  8 series QD + 8 series QF 14 Apr Nov. 2013Attilio Milanese12

Quadrupoles direct involvement of the technical director, Julio Lucas the drawing of the lamination is approved ELYTT has ordered the electrical steel (M A with STABOLIT 70 coating, from ThyssenKrupp, Germany) the punching tooling is in preparation with Omedec, the first laminations are expected for mid-February 2014 the review of the Manufacturing File is scheduled for 29 Nov Nov. 2013Attilio Milanese13 CAD model of ELYTT (work in progress)

Quadrupole coils 140 QF and 140 QD coils CERN provides the hollow copper conductor (from Luvata, Finland), insulated with 2×50  m of polyimide with epoxy layer + 3×130  m of glass fiber (wrapping performed by Sofilec, France) review of Manufacturing File 10 Oct at CERN, we had already visited them in Turkey for a contract of spare coils schedule  Manufacturing File11 Oct  10 pre-series QD and 10 pre-series QF coils13 Dec  40 series QD and 40 series QF coils 28 Mar  40 series QD and 40 series QF coils 25 Jul  50 series QD and 50 series QF coils 29 Nov Nov. 2013Attilio Milanese14

Quadrupole coils direct involvement of the owner and of the management visit 12 Nov. 2013: first tooling prepared and first test coils wound, an iteration is being performed to reach the target coil geometry 23 Nov. 2013Attilio Milanese15 QD mould QF mould QD winding mandrel QF test coils

Sextupole coils 420 sextupole coil packages CERN provides to SEF all the insulated conductor: – the hollow copper conductor (from Luvata, Finland), insulated with 2×50 mm of polyimide with epoxy layer + 3×130 mm of glass fiber (wrapping performed by Sofilec, France) – the enamelled copper conductor (from VonRoll, Switzerland) kick-off meeting at CERN on 5 Nov schedule  20 pre-series coils21 Feb  100 series coils 30 May 2014  100 series coils 1 Aug  100 series coils 17 Oct  100 series coils19 Dec Nov. 2013Attilio Milanese16

Sextupoles CERN provides to the magnet manufacturer – the impregnated coil packages, with brazed electrical / hydraulic connections – the punched laminations – the stacking toolings – some auxiliary components (supports, cables, thermoswitches, etc) – support for manufacturing procedures and testing A protocol between CERN and PAEC (Pakistan) is in preparation for the supply of magnets. A company in Cyprus (CNE Technology Center) has been selected for supplying the other magnets. A pilot order for manufacturing one complete yoke has been placed and the related material is on its way to Cyprus. A tentative schedule is given on the next page. 23 Nov. 2013Attilio Milanese17

Schedule for main contracts 23 Nov. 2013Attilio Milanese18 IIIIVIIIIIIIVIII IV schedule broken down according to supply of batches contractual schedule for dipole, quadrupoles, quadrupole coils and sextupole coils estimated schedule for sextupoles

Acceptance and magnetic measurements Bending magnets  Acceptance tests and magnetic measurements at ALBA  Draft of the measurement procedure already underwent a couple of iterations, the alignment procedure is being particularly discussed (still pending the alignment tolerances from SESAME) Quadrupoles and sextupoles  Acceptance tests at CERN  Magnetic measurements at SESAME Other components  Quadrupole / sextupole coils will be qualified at CERN  Checks of laminations and other samples at CERN 23 Nov. 2013Attilio Milanese19

23 Nov. 2013Attilio Milanese20 1 st assembly of CERN sextupole pre-series (electric and hydraulic circuits in test configuration) (already in an accelerator tunnel, the ISR!) correctors circuits view main sextupole view

Field quality of CERN sextupole pre-series 23 Nov. 2013Attilio Milanese21  The allowed harmonics are extremely good: the pole profile is confirmed.  a 6 = 0.9 due to a solenoidal loop on the lead side: avoiding that would lower a 6 to 0.3 (tried experimentally).  The other non allowed harmonics (octupole and decapole), can be further reduced by improving the symmetry of the assembly. multipoles in 10 R = 24 mm ∫b 9 = 0 and with no end pole chamfer thanks to a biased b 9 in 2D b 9,2D = 12.8 allowed Opera-2D model Opera-3D model Rotating coil measurements ∫b 9 = 0

Results of magnetic measurements considering also coupling between the main sextupole and the different circuits are being analysed by Louis Walckiers. Preliminary frequency tests show no measurable attenuation till at least 200 Hz. CERN pre-series correctors (in sextupole) 23 Nov. 2013Attilio Milanese22 vertical dipolehorizontal dipoleskew quadrupole

A precisely punched lamination 23 Nov. 2013Attilio Milanese23 Omedec (France) delivered the first punched laminations within the specified tolerances at the first iteration. Extract from the CERN Metrology report (the red lines are at ± 25 micron) below.

Sextupole toolings / assembly procedures Winding tooling and impregnation mould for coil packages: drawings shared with the coil manufacturer, to speed up the procurement Stacking tooling for yoke: see next slide Assembly procedures / quality control  Procedures are being prepared to detail the alignment and curing of the sextants, the precision assembly of the sextupole  Quality controls templates are also in preparation 23 Nov. 2013Attilio Milanese24

Stacking tooling: 5 ready (for series yokes) 23 Nov. 2013Attilio Milanese25

Sextupole, steel is on the move 23 Nov. 2013Attilio Milanese26 electrical steel on its way to be punched electrical steel after being punched stacking tooling ready to be shipped to a magnet manufacturer

23 Nov. 2013Attilio Milanese27 TO CONCLUDE

A wide effort 23 Nov. 2013Attilio Milanese28

23 Nov. 2013Attilio Milanese29 Special thanks to the EC for the CESSAMag funds, FP7 contract all the colleagues at CERN working on the procurement of these magnets, in particular the Magnet Normal Conducting section, the Procurement Office, the Legal Service and the Logistics the colleagues at ALBA and other light sources for useful discussions and their availability during the numerous contacts thank you شكرا (shukran) eυχαριστώ (efharistó) ممنون (mamnoon) شكريه (shukriya) teşekkür ederim תודה (toda)