Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March 11, 2009
INTRODUCTION RISING MAINTENANCE COSTS MAXIMIZE RELIABILITY LEVERAGE RESOURCES TO ACHIEVE MAXIMUM “WRENCH TIME”
FUNDAMENTAL COMPONENTS PLANNER/ SCHEDULER FIXED INTERVAL MAINTENANCE WINDOWS COMPUTERIZED MAINTENANCE SYSTEM ACCURATE JOB SCOPE AND ESTIMATING METRICS FOR MAINTENANCE
SPECIFIC PLANNING TASKS LIMIT RESPONSIBILITY TO TASKS THAT PERTAIN TO RELIABILITY OF DEFINED AREA THE PLANNER IS NOT : AN ADMINISTRATIVE ASSISTANT (SECRETARY) A SUPERVISOR AN ENGINEER LIMIT NUMBER OF MEETINGS
DEDICATED RESOURCES ONE GROUP FOR EMERGENCY AND REACTIVE WORK BE CERTAIN THAT ROLES ARE CLEARLY DEFINED AND UNDERSTOOD
DEDICATED RESOURCES ONE GROUP FOR PREVENTIVE AND PREDICTIVE WORK INSPECTIONS AND PRE PLANS BEFORE THE EMERGENCY OCCURS NO EMERGENCY TOOLS OR EQUIPMENT ROLE DEFINITION AND UNDERSTANDING
RESOURCE TEAMWORK BOTH TEAMS HAVE RESPECTFUL WORKING RELATIONSHIP MUTUAL UNDERSTANDING OF ULTIMATE GOAL
DEDICATED MAINTENANCE WINDOWS CONSISTENT AND CLEARLY DEFINED MUTUALLY AGREED UPON WITH MAINTENANCE AND OPERATIONS SAME TIME, SAME DAY EACH WEEK WHEN POSSIBLE
MAINT. WINDOWS CONT’D VITAL TO ADHERE TO MAINTENANCE WINDOW RISK OF UNSCHEDULED DOWNTIME LATER STRANDED MAINTENANCE LABOR RESCHEDULE TOOLING, EQUIPMENT AND CONTRACTORS MOVING STAGED MATERIALS AND EQUIPMENT ADDED CO$T$
COMPUTERIZED MAINTENANCE SYSTEM NEEDS TO BE CONCISE AND DETAILED CAPABLE OF PRODUCING CLEARLY UNDERSTOOD WORK ORDERS PRODUCE AND MAINTAIN DETAILED PM INSPECTIONS
COMPUTERIZED MAINTENANCE SYSTEM CONT’D PARTS / MATERIALS INVENTORY PURCHASING EQUIPMENT DATA & HISTORY COSTS TIME CARDS FRIENDLY FOR DATA ANALYSIS REPORTING
RCM ( RELIABILITY CENTERED MAINTENANCE) CRITICAL EQUIPMENT LIST WITH FAILURE MODES AND EFFECTS ANALYSIS PREVENTIVE AND PREDICTIVE TASKS BUILT AND ISSUED AT PROPER FREQUENCY PvM AND PdM TASKS REVIEWED PERIODICALLY FOR MAXIMUM EFFICIENCY
WHY RCM?
RCM CONT’D BOM (BILL OF MATERIAL) IS BUILT AND INSTALLED IN CMMS MATERIAL MANAGEMENT IS KEY TO HAVING ACCURATE AND COMPLETE BOM MIN/MAX MATERIAL QUANTITIES SHOULD BE REVIEWED REGULARLY TO MAINTAIN PROPER INVENTORY
WORK ORDER INTEGRITY EACH WORK ORDER MUST CAPTURE INFORMATION REGARDING ALL ASPECTS OF THE OPERATION PERFORMED. WORK HISTORY FOR EACH PIECE OF EQUIPMENT CAN BE ANALYZED FOR: QUICK REFERENCE TO PAST WORK PLANS/ SOLUTIONS EQUIPMENT BAD ACTORS & REPETITIVE FAILURES MTTR, MTBF, WOTT, RCFA COST ANALYSIS FOR VARIOUS PURPOSES PARTS, LABOR, EQUIP., AND OTHER RESOURCE USAGE
WORK ORDER INTEGRITY CONT’D DETAILED DESCRIPTION OF WORK NEEDED CORRECT EQUIPMENT CODE OR DESCRIPTION DETAILED LOCATION ACCURATE PRIORITY TIME OF FAILURE RESOURCE / SKILLS NEEDS PARTS/MATERIAL NEEDS WORK ORDER MUST CAPTURE : DETAILS OF ACTUAL WORK PERFORMED FAILURE CODES AND RCFA TIME EQUIPMENT RESTORED ACTUAL LABOR TIME AND COST MATERIALS AND COST CONTRACT SERVICE YOU CANNOT PUT TOO MUCH INFO ON A WORK ORDER !
PLANNING & ESTIMATING WITH DETAILED HISTORY, ACCURATE MAINTENANCE PLANS CAN BE DEVELOPED BY THE PLANNER THAT WILL ACCURATELY ALLOCATE RESOURCES FOR REPETITIVE TASKS THIS PLAN SHOULD INCLUDE A DETAILED SAFETY PLAN AND ANY NECESSARY PERMITS
ESTIMATING CONT’D MAINTENANCE PLANS SHOULD BE KEPT ON A DISC OR SEPARATE DRIVE IN THE EVENT OF ELECTRONIC FAILURE PLANS SHOULD ALSO BE INDEXED AND KEPT ON A SHARED SOURCE FOR ALL ACCESS
METRICS FOR MAINTENANCE
METRICS IMPORTANT TO CHOOSE THE KEY METRICS THAT WILL ENABLE THE BUSINESS TO MOVE FORWARD THEY PROVIDE A VISION OF WHAT IS HAPPENING YOU CANNOT EFFECTIVELY MANAGE WHAT YOU CANNOT MEASURE
EXAMPLES OF METRICS PM/PdM COMPLIANCE ON-TIME COMPLETION WORK ORDER TURN AROUND TIME (WOTT) EQUIPMENT BAD ACTORS PRODUCTION DOWNTIME DUE TO EQUIPMENT FAILURE WORK ORDER BACKLOG
EXAMPLES OF METRICS CONT’D MAINTENANCE COSTS MAINTENANCE COSTS PER UNIT OF PRODUCTION % PLANNED WORK (PROACTIVE)
PLANNED VS REACTIVE WORK 2008
SUMMARY DEDICATED RESOURCES STRUCTURED MAINTENANCE WINDOWS MAINTENANCE ORGANIZATION CAN ASSURE ITSELF OF INCREASED CRAFT PRODUCTIVITY INCREASE IN EQUIPMENT RELIABILITY
SUMMARY CONT’D USING WORK ORDER DETAIL AND HISTORY, THE PLANNER CAN ANALYZE DATA TO DETERMINE MAINTENANCE OPPORTUNITIES AND DEVELOP PROACTIVE STRATEGIES MEANINGFUL AND ACCURATE METRICS WILL PROVIDE ACCOUNTABILITY AND A GAUGE OF MAINTENANCE PERFORMANCE
Reliability Through Maintenance Planning and Scheduling