Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.

Slides:



Advertisements
Similar presentations
Operation & Maintenance Engineering Detailed activity description
Advertisements

DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Outlook 2 Everything feels good now as prices are high. However...
KPI Familiarisation.
How to commence the IT Modernization Process?
1 © Life Cycle Engineering 2011 The Misguided Application of the Planner/Scheduler Tim Kister Senior Planner/Scheduler Life Cycle Engineering Carolinas.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
ITIL: Service Transition
SE429 Maintenance Planning and Control.
1 Maintenance management. 2 Maintenance Management Loop.
Proficy* Maintenance Gateway Close-the-loop Between Your Plant Floor and Plant Maintenance Systems.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Concepts for Managing DoD Materiel Reliability Dave Robertson.
Contractor Assurance Discussion Forrestal Building Washington, D.C. December 14, 2011.
Maintenance Work Measurement
ORACLE ENTERPRISE ASSET MANAGEMENT
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
Procurement Strategic Planning Process Transformation Procurement Risks and Opportunities Procurement Process Capabilities & Interdependencies Key Strategic.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Computerised Maintenance Management Systems
Release & Deployment ITIL Version 3
“Safety is a Measure of Success” Presented by: Abdul Waheed – Reliability Engineer Qurayyah Sea Water Maintenance Division May 3, 2009 Presented by: Abdul.
Total Productive Maintenance (TPM)
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Enterprise Asset Management
S/W Project Management
Introduction to Software Quality Assurance (SQA)
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Computers & Employment By Andrew Attard and Stephen Calleja.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Definitions, Goals and Objectives
Project ManagementDay 1 in the pm Project Management (PM) Structures.
MSF Requirements Envisioning Phase Planning Phase.
Software System Engineering: A tutorial
© 2013 eXegy Partners LLC – All Rights Reserved Page 1 Business Requirements A Hints and Tips sheet on how to develop high quality Business Requirements.
CHALLENGES IN MAINTENANCE FUNCTIONS
Z26 Project Management Introduction lecture 1 13 th January 2005
Assessing Maintenance Effectiveness and Efficiency How is your maintenance dollar used, breakdown, inspection, improvements, demolition, operational support,
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
Applying Business Process Re-engineering
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
RCM Tools Histogram Pareto Chart Cause and Effect Diagram FMEA.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Project Portfolio Management Business Priorities Presentation.
Course of Study 5. Maintenance Management Assessing Maintenance Needs
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Computerised Maintenance Management Systems
12/06/20161 ObjectiveProcess Risk Inherent Risk – risk of not achieving objectives Inherent risk Inherent risk – before the assessment of any controls.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Service Design.
 System Requirement Specification and System Planning.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Asset Integrity & Reliability Management A Strategic Perspective Andreas de Vries Doha, 15 – 18 May 2016.
The Good Maintenance Guide
MAINTENANCE ENGINEERING
Applying Business Process Re-engineering
100% Exam Passing Guarantee & Money Back Assurance
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
IENG 451 / 452 Stability: Total Productive Maintenance
(Additional materials)
KPI Familiarisation
PREVENTIVE MAINTENANCE
What Safety Success Does Not Look Like…
Unit I Module 3 - RCM Terminology and Concepts
Ch. 8 - Controlling.
Maintenance Opportunities
Presentation transcript:

Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March 11, 2009

INTRODUCTION  RISING MAINTENANCE COSTS  MAXIMIZE RELIABILITY  LEVERAGE RESOURCES TO ACHIEVE MAXIMUM “WRENCH TIME”

FUNDAMENTAL COMPONENTS  PLANNER/ SCHEDULER  FIXED INTERVAL MAINTENANCE WINDOWS  COMPUTERIZED MAINTENANCE SYSTEM  ACCURATE JOB SCOPE AND ESTIMATING  METRICS FOR MAINTENANCE

SPECIFIC PLANNING TASKS  LIMIT RESPONSIBILITY TO TASKS THAT PERTAIN TO RELIABILITY OF DEFINED AREA  THE PLANNER IS NOT :  AN ADMINISTRATIVE ASSISTANT (SECRETARY)  A SUPERVISOR  AN ENGINEER  LIMIT NUMBER OF MEETINGS

DEDICATED RESOURCES  ONE GROUP FOR EMERGENCY AND REACTIVE WORK  BE CERTAIN THAT ROLES ARE CLEARLY DEFINED AND UNDERSTOOD

DEDICATED RESOURCES  ONE GROUP FOR PREVENTIVE AND PREDICTIVE WORK  INSPECTIONS AND PRE PLANS BEFORE THE EMERGENCY OCCURS  NO EMERGENCY TOOLS OR EQUIPMENT  ROLE DEFINITION AND UNDERSTANDING

RESOURCE TEAMWORK  BOTH TEAMS HAVE RESPECTFUL WORKING RELATIONSHIP  MUTUAL UNDERSTANDING OF ULTIMATE GOAL

DEDICATED MAINTENANCE WINDOWS  CONSISTENT AND CLEARLY DEFINED  MUTUALLY AGREED UPON WITH MAINTENANCE AND OPERATIONS  SAME TIME, SAME DAY EACH WEEK WHEN POSSIBLE

MAINT. WINDOWS CONT’D  VITAL TO ADHERE TO MAINTENANCE WINDOW  RISK OF UNSCHEDULED DOWNTIME LATER  STRANDED MAINTENANCE LABOR  RESCHEDULE TOOLING, EQUIPMENT AND CONTRACTORS  MOVING STAGED MATERIALS AND EQUIPMENT  ADDED CO$T$

COMPUTERIZED MAINTENANCE SYSTEM  NEEDS TO BE CONCISE AND DETAILED  CAPABLE OF PRODUCING CLEARLY UNDERSTOOD WORK ORDERS  PRODUCE AND MAINTAIN DETAILED PM INSPECTIONS

COMPUTERIZED MAINTENANCE SYSTEM CONT’D  PARTS / MATERIALS INVENTORY  PURCHASING  EQUIPMENT DATA & HISTORY  COSTS  TIME CARDS  FRIENDLY FOR DATA ANALYSIS  REPORTING

RCM ( RELIABILITY CENTERED MAINTENANCE)  CRITICAL EQUIPMENT LIST WITH FAILURE MODES AND EFFECTS ANALYSIS  PREVENTIVE AND PREDICTIVE TASKS BUILT AND ISSUED AT PROPER FREQUENCY  PvM AND PdM TASKS REVIEWED PERIODICALLY FOR MAXIMUM EFFICIENCY

WHY RCM?

RCM CONT’D  BOM (BILL OF MATERIAL) IS BUILT AND INSTALLED IN CMMS  MATERIAL MANAGEMENT IS KEY TO HAVING ACCURATE AND COMPLETE BOM  MIN/MAX MATERIAL QUANTITIES SHOULD BE REVIEWED REGULARLY TO MAINTAIN PROPER INVENTORY

WORK ORDER INTEGRITY  EACH WORK ORDER MUST CAPTURE INFORMATION REGARDING ALL ASPECTS OF THE OPERATION PERFORMED.  WORK HISTORY FOR EACH PIECE OF EQUIPMENT CAN BE ANALYZED FOR:  QUICK REFERENCE TO PAST WORK PLANS/ SOLUTIONS  EQUIPMENT BAD ACTORS & REPETITIVE FAILURES  MTTR, MTBF, WOTT, RCFA  COST ANALYSIS FOR VARIOUS PURPOSES  PARTS, LABOR, EQUIP., AND OTHER RESOURCE USAGE

WORK ORDER INTEGRITY CONT’D  DETAILED DESCRIPTION OF WORK NEEDED  CORRECT EQUIPMENT CODE OR DESCRIPTION  DETAILED LOCATION  ACCURATE PRIORITY  TIME OF FAILURE  RESOURCE / SKILLS NEEDS  PARTS/MATERIAL NEEDS  WORK ORDER MUST CAPTURE :  DETAILS OF ACTUAL WORK PERFORMED  FAILURE CODES AND RCFA  TIME EQUIPMENT RESTORED  ACTUAL LABOR TIME AND COST  MATERIALS AND COST  CONTRACT SERVICE  YOU CANNOT PUT TOO MUCH INFO ON A WORK ORDER !

PLANNING & ESTIMATING  WITH DETAILED HISTORY, ACCURATE MAINTENANCE PLANS CAN BE DEVELOPED BY THE PLANNER THAT WILL ACCURATELY ALLOCATE RESOURCES FOR REPETITIVE TASKS  THIS PLAN SHOULD INCLUDE A DETAILED SAFETY PLAN AND ANY NECESSARY PERMITS

ESTIMATING CONT’D  MAINTENANCE PLANS SHOULD BE KEPT ON A DISC OR SEPARATE DRIVE IN THE EVENT OF ELECTRONIC FAILURE  PLANS SHOULD ALSO BE INDEXED AND KEPT ON A SHARED SOURCE FOR ALL ACCESS

METRICS FOR MAINTENANCE

METRICS  IMPORTANT TO CHOOSE THE KEY METRICS THAT WILL ENABLE THE BUSINESS TO MOVE FORWARD  THEY PROVIDE A VISION OF WHAT IS HAPPENING  YOU CANNOT EFFECTIVELY MANAGE WHAT YOU CANNOT MEASURE

EXAMPLES OF METRICS  PM/PdM COMPLIANCE  ON-TIME COMPLETION  WORK ORDER TURN AROUND TIME (WOTT)  EQUIPMENT BAD ACTORS  PRODUCTION DOWNTIME DUE TO EQUIPMENT FAILURE  WORK ORDER BACKLOG

EXAMPLES OF METRICS CONT’D  MAINTENANCE COSTS  MAINTENANCE COSTS PER UNIT OF PRODUCTION  % PLANNED WORK (PROACTIVE)

PLANNED VS REACTIVE WORK 2008

SUMMARY  DEDICATED RESOURCES  STRUCTURED MAINTENANCE WINDOWS  MAINTENANCE ORGANIZATION CAN ASSURE ITSELF OF INCREASED CRAFT PRODUCTIVITY  INCREASE IN EQUIPMENT RELIABILITY

SUMMARY CONT’D  USING WORK ORDER DETAIL AND HISTORY, THE PLANNER CAN ANALYZE DATA TO DETERMINE MAINTENANCE OPPORTUNITIES AND DEVELOP PROACTIVE STRATEGIES  MEANINGFUL AND ACCURATE METRICS WILL PROVIDE ACCOUNTABILITY AND A GAUGE OF MAINTENANCE PERFORMANCE

Reliability Through Maintenance Planning and Scheduling