Zachary Wolf Undulator Oct 12, 2006 1 LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

August 14, 2007 Internal Presentation Georg Gassner 1 AGI Inclinometer Georg Gassner, John McDougal, SLAC August, 2007 Principle.
Alexander Temnykh Cornell University, Ithaca NY, USA
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
SCU Magnet Modelling: Tolerances and Beam Trajectories Ben Shepherd Superconducting Undulator Workshop RAL, April 2014.
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Zack Wolf Undulator Bench October 14, Undulator Bench Requirements Zack Wolf SLAC.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Bending Magnets for the Metrology Light Source
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
SCU Next Phase Meeting July 8, 2014.
Beam-Based Alignment Results
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Undulator Tuning Status
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator Tuning And Fiducialization
Undulator Assembly and Installation Planning
Undulator Alignment Plan
LCLS Undulator Magnetic Measurements
Presentation transcript:

Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave Jensen

Zachary Wolf Undulator Oct 12, MMF Hardware Installation FAC April 20, 2006FAC October 12, 2006

Zachary Wolf Undulator Oct 12, Undulator Work Flow 1 Week, Come to 20 C 1 Week, Rough Tuning 1 Week, Fine Tuning <1 Week, Finish Fiducialization Peak Throughput: 1 undulator per week Tuning Time: about 4 weeks

Zachary Wolf Undulator Oct 12, MMF Temperature Achim Weidemann Previous two week time history at the Kugler bench Maintenance work was done on the MMF power system causing the large changes In general, the system meets stability requirements

Zachary Wolf Undulator Oct 12, Rough Tuning Bench Components

Zachary Wolf Undulator Oct 12, Rough Tuning Bench Cam Movers Cable Handling Bench Undulator Reference Pole Zero Gauss Chamber

Zachary Wolf Undulator Oct 12, Capacitive Sensor Alignment Performance Undulator mechanically aligned to bench in 15 minutes Yurii Levashov

Zachary Wolf Undulator Oct 12, Scans Begin And End In A Zero Gauss Chamber Beginning zero field measurement Ending zero field measurement Senis Hall probe Zero Offset Correction Assume linear offset dependence on time

Zachary Wolf Undulator Oct 12, Y Trajectory Shims Bx Shim New Design Smaller external fields Uniform Bx field in gap Yurii Levashov Inconel Steel Spot weld Old Shim Design

Zachary Wolf Undulator Oct 12, Rough Tuning Test Plan 1)Place undulator Use kinematic mount 2)Mechanically align to test stand Optical alignment check, use capacitive sensors and cam movers 3)Magnetically align Hall probe to undulator Move Hall probe in x and y to magnetic center 4)Rough tuning Tune x and y trajectories, anticipate magnetic shield 5)Adjust gap Measure K, adjust gap to set K to required value for that undulator 6)Check alignment Alignment may have changed from gap adjustment 7)Rough tuning Anticipate magnetic shield 8)Add magnetic shield 9)Check tuning Achim Weidemann

Zachary Wolf Undulator Oct 12, Each Undulator Has Its Own K Value From Heinz-Dieter Nuhn

Zachary Wolf Undulator Oct 12, Fine Tuning Bench Components

Zachary Wolf Undulator Oct 12, Fine Tuning Bench Kugler Bench Cable Handling Steel Girder And Stands Cam Movers Undulator With Magnetic Shield

Zachary Wolf Undulator Oct 12, Kugler Bench Performance Measurements by Georg Gassner X Y straightness spec: < 14 μm Pitch and yaw spec: < 4.2 μrad Specs met in long block region

Zachary Wolf Undulator Oct 12, Coils For Fine Tuning Bench Field Integral Coil Short Coil Zero Gauss Chamber Dave Jensen Bx, By One Undulator Period Long Coils I1 I2

Zachary Wolf Undulator Oct 12, Fine Tuning Test Plan 1) Place undulator Use kinematic mount, use steel girder and stands, shield on 2) Mechanically align to test stand Optical alignment check, use capacitive sensors and cam movers 3) Magnetically align Hall probe to undulator Move Hall probe in x and y to magnetic center 4) Determine the tuning axis Move in x to where K has the required value 5) Tuning Tune x and y trajectories, phase 6) Add phase matching shims 7) Adjust field integrals Use long coil, I1 and I2 for both Bx and By 8) Adjust field uniformity Add quadrupole and sextupole shims as necessary 9) Final checks before gluing shims Check x and y trajectory, phase, phase matching, field integrals, uniformity Yurii Levashov

Zachary Wolf Undulator Oct 12, Fine Tuning Test Plan (cont.) 10) Glue shims in place Remove y trajectory, quadrupole, sextupole, and phase shims, apply glue, replace 11) Check the gap Make sure no parts of a shim protrude into the gap 12) Check for errors while gluing shims Check x and y trajectories, phase, I1 and I2 of Bx and By, uniformity 13) Map Bx and By in the retracted position 14) Final results data set Measure Bx and By at x = -6, -5, …, 6 mm, y = -0.2, -0.08, , 0.2 mm, calculate field integrals vs z, 65 scans 15) Find the x position, y=0, where K has the required value 16) Add fiducialization magnets to both ends Measure offsets from beam axis to the center of the fiducialization magnets 17) Rough fiducialization using alignment equipment 18) Measure roll on flats at each undulator end 19) Move undulator to CMM, finish fiducialization

Zachary Wolf Undulator Oct 12, Fiducialization

Zachary Wolf Undulator Oct 12, Hall Probe Calibration Chiller For probe temperature Magnet Water NMR Metrolab NMR HP3458 Seva Kaplounenko

Zachary Wolf Undulator Oct 12, Schedule Robert Ruland

Zachary Wolf Undulator Oct 12, Conclusion MMF construction is complete, temperature stability and set point accuracy requirements have been met The rough tuning bench is complete The Hall probe calibration system is complete The fine tuning bench has all components complete. Some fixturing work remains. The software is mostly complete. Some automation work remains. Mechanical alignment takes about 15 minutes. New Bx shims have been designed. The fine tuning bench construction meets all specifications. The expected throughput is one undulator per week. Each undulator, however, spends about 4 weeks in the MMF. One reference undulator gets re-measured every fourth undulator.