How much do you know about demolition? Appointment of a competent Contractor, How to assess Competency?

Slides:



Advertisements
Similar presentations
OHS Safe in the Knowledge Contact OHS on: The Compliance Consultancy Health Safety and Environmental Management Delivering the vision An incident.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 3 – CDM co-ordinator Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Session 9 – Summary & Where Next? Version: September 07.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 6 – Site health & safety Version: September 2007.
Health and Safety Executive Health and Safety Executive Update on HSE evaluation of CDM 2007 Andrew Maxey and Anthony Lees.
Health and Safety Executive Health and Safety Executive CDM update CONIAC – 20 June 2012.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR 4 th February 2011.
Background Presenters Work done in preparation for WHS changes
A presentation to Your name here Project: Your project here One Stop Demolition A Solution to the clients nightmare.
Construction (Design and Management) Regulations 2007
Steve May A H Allen Limited Asbestos: A Breath of Fresh Air?
H&S Asbestos Regulations the Basics Phil Bloomer MSc BSc PGCE Phil Bloomer MSc BSc PGCE Internal Training Manager Internal Training Manager.
CDM 2015 Key Changes and Duty-Holder Responsibilities
Site Waste Management Plans Presentation – September 2009 Planning Agents’ Forum.
Asbestos Legislation Steve Shutler BSc(Hons), MCIEH, CMIOSH, CCP(Asbestos) Director SB Asbestos Management Ltd.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
CDM CO-ORDINATOR GETTING THE RIGHT INFORMATION TO THE RIGHT PEOPLE AT THE RIGHT TIME Philip Baker 17 October 2007.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Pamela Simpson MCSP Moving And Handling Consultant.
UKATA EMERGENCY PROCEDURES These slides are designed to assist UKATA members in the delivery of Category A – Asbestos Awareness Training when dealing with.
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
WHS Management Plans.
CDM 2007 MAKING A DIFFERENCE Ken Logan. CDM 2007 : – Making a Difference The Challenge To change attitudes To change behaviours Achieve sensible risk.
UK’s CDM Regulations 2007 and its Applications in Singapore
Regulation 16B As referenced in Approved Document B 2006.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Produced 27/06/05 Seeing the Future First Tom Welland Fire Services Manager.
Hansen – Managing Safely 1 CDM – An Appreciation Mark Mallen Health and Safety Manager Fenlock Hansen Ltd.
SHEPPARD ROBSON IN-HOUSE TRAINING TECHNICAL SEMINAR The Construction (Design & Management) Regulations CDM.
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
What is EcoScan? EcoScan is a small environmental consultancy that is principally concerned with: The development and implementation for its clients of.
1 HEALTH & SAFETY FIRE SAFETY SATUTORY RESPONSIBILTIES FOR MANAGERS.
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
1 Waste Duty of Care (The Environmental Protection Act 1990) To what kind of waste does the duty of care apply? –Controlled Waste (Directive Waste) - Includes:
DIRECT WORKS FORUM CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2007 Aylesbury: Dunfermline: Belfast:
Unit 201: Health and safety in building services engineering
Slips, Trips & Falls Tony Saunders Merseyside Trade Union Education Unit.
Prime Responsibility for Radiation Safety
Stephen Gough LPN Manager 28 March 2014 Context and Regulations PNA.
Turning February Question one General duties of employees at work.E+W+S+N.I. It shall be the duty of every employee while at work— (a)to take reasonable.
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
StagesOf Assessment Stages Of Assessment. The Stages of Assessment for the Single Assessment Process §Publishing information about services. §Completing.
IOSH Midlands South Branch Legal Update 30 September 2015 Andrew Litchfield – Wragge Lawrence Graham & Co LLP.
Demolition Hazards & Control Measures. Remember! The CDM Regs 1994 apply to all demolition & dismantlement work.
Health and Safety Executive Health and Safety Executive HSE update September 2015 Liz Hunter HSE Inspector of Health and Safety.
3 STUDENT ASSESSMENT DEPARTMENT
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
HSE activity and resume of topical issues Paul Harvey HM Principal Inspector.
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
GREATER MANCHESTER FIRE AND RESCUE SERVICE The Fire Safety Order 2005 John O’Leary B.Eng (Hons) FIFireE Head of Risk Reduction.
CDM Client Briefing Tim Knowles
HSE Update Lisa Skinner HM Inspector of Health & Safety
Temporary Works Co-ordination
Control of Asbestos Regulations 2012 & Surveys
Presentation Title: View > Header & Footer
CDM 2015 COSG Update.
The Construction (Design and Management) Regulations 2015
CDM 2015: PCI, CPP, Client Duties, IOSH Tyne & Wear Branch
Effective Construction Safety Management
Presentation transcript:

How much do you know about demolition?

Appointment of a competent Contractor, How to assess Competency?

CDM Regs Require a Stage 1 Assessment Stage 2 What to look for or ask? Appoint Contractor

What legislation applies to Demolition?

Main Legislation CDM Regulations 2007 (Anticipated to be updated in 2012) Reg 28 & 29 Specifically. Control of Asbestos 2006 (CAR 2012 due April 2012) Are the main relevant, obviously thereafter various PUWER, LOLER, COSHH, Control of Lead Etc

Do you know what is required before Demolition can Commence?

Structural stability during alteration, demolition and dismantling What you need to do The law says that all alteration, demolition and dismantling work should be carefully planned and carried out by competent people to avoid unplanned structural collapse. The law requires commercial clients to provide contractors with relevant information about a building’s structure, including stability and structural form and any significant design assumptions, suggested work methods and sequences. The contractor must then use that information to plan and carry out the work safely. Key requirements are: Survey and assessment Preventing structural collapse Arrangements for demolition Consulting building control departments

Where to get Guidance?

Sources of Guidance

Individual Competence Requirements

Competence Requirements Certificate of Competence Demolition

Demolition Operatives Require a Minimum of Category 3 or UKATA Cat A Asbestos Awareness Training UKATA Cat B or Category 2 Non-Licensed Asbestos Training is advisable, with Face-Fit Test and Half Mask.

Questions?