Pathways to Lasting Solutions “The Longest Yard” Water Budget Rate Structures & The City of Boulder, Colorado January 25, 2007 © 2006 Malcolm Pirnie, Inc.

Slides:



Advertisements
Similar presentations
Discussion Topics Overview of Water Rates in California Legal Framework of Water Rates Water Consumption Patterns Empirical Data – City of Fresno The.
Advertisements

Current Legal Developments on Ratemaking - A Primer on Budget-based Water Rate Structures 1 Paul D. Jones II, P.E. General Manager, Eastern.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
1 RATE SETTING WORKSHOP February 23, RATE CHANGES In accordance with Section of the Charter Plan of the District, any proposed rate change.
DROUGHT PRICING – LESSONS LEARNED A Presentation to 2003 RMSAWWA / RMWEA Joint Annual Conference by Kerry Kuykendoll Manager of Rate Administration Denver.
Copyright Rehmann Robson Pennfield Charter Township Water and Sewer Utilities Rate Study.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Water Budgets and Rate Structures - Innovative Management Tools William B. DeOreo, P.E., M.S. Aquacraft, Inc. Boulder, Colorado
Residential Water Consumption in Los Angeles:
March 14, – 5:30 p.m.. March 14, 2011 Meeting Agenda 1. Minutes (February 14, 2011) 2. Member Inquiries / Staff Follow-up 3. Stormwater Management.
Coachella Valley Water District Dave Koller Conservation Manager.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
Assessment of Climate Change Impacts on Electricity Consumption and Residential Water Use in Cyprus Theodoros Zachariadis Dept. of Environmental Science.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
Staying Afloat with Water Revenues Balancing the ebb and flow of revenue stability with conservation Mayors Water Council December 3, 2009 Sandra Ralston.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
June 10, :30 p.m..  Agenda  Background: Frank Heldman, District Manager  Summary of 14.1 Filing: John Garon, Regulatory Affairs Manager  Water.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
March 12 th, 2013 Stormwater Rate Structure Discussion.
Elk Grove Water District – CAC Meeting Water Rate Update and Connection Fees Habib Isaac – Principal Carlos Villarreal – Technical Advisor January 22,
City of Renton, WA Water Use Efficiency Margaret Ales PNWS – AWWA CONFERENCE MAY 1, 2008 Copyright © 2008 by R. W. Beck, Inc. All Rights Reserved. Opportunities,
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
Water Conservation Investigation. Determine the average household water usage per month What does 20% reduction in water use represent? What does 35 %
Elk Grove WD Board Meeting Water Rates Habib Isaac – Principal Gregg Tobler – Task Manager September 10, 2012.
City Commission Water/Wastewater Rate Development Lawrence, Kansas November 9, 2004.
Time Frame. Opportunities To Comment Today October 15 th - Urban Stakeholders Committee November 9 th – California Water Commission Formal Rulemaking.
1 User Rate Adjustments June 30, 2008 Financial Analysis - Karen Spence.
Elk Grove Water District – Finance Meeting Water Rate Update and Connection Fees Habib Isaac – Principal Gregg Tobler – Task Manager January 30, 2013.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
1 Redmond Town Center, th Avenue NE, Suite D-215, Redmond, WA 98052; T: (425) F: (425) BCWWA Annual Conference.
Making Conservation Work for You Chris Brown Chris Brown Consulting for Office of Rural Community Affairs December 2, 2003.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
Preliminary Regional Rate Study Results & Remaining Rate Study Inputs June 5, 2014 Presentation Water Supply Operating Board Wholesale Rate Setting.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
Eugene Water & Electric Board Jill Hoyenga, Water Management Services Supervisor.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Landscape Transformation “ Millions of Lessons Learned ” Metropolitan Water District of Southern California Bill McDonnell January 25, 2016.
Western Hills Water DistrictWater Rate Update Board Meeting HF&H Consultants, LLC 0November 4, 2015 HF&H Consultants, LLC Western Hills Water District.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
Welcome Bexar County WCID #10 Informational Meeting.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
Town of Lochbuie Water 2015 Water Rate Options Presented to the Town of Lochbuie Board of Trustees Raftelis Financial Consultants, Inc. December 16, 2014.
Water and Wastewater Rates Public Hearing July 15, 2015 The Reed Group, Inc. 1.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
FY 2016 Budget Discussion Prior to Proposed Budget Submittal July 23 rd,2015.
Water Connection Charges: A Tool for Encouraging Water-Efficient Growth Amelia Nuding Senior Water Resources Analyst.
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Pathways to Lasting Solutions June 9, 2009 City Council Work Session – No. 2 © 2008 Malcolm Pirnie, Inc. All Rights Reserved Water and Wastewater Rate.
City of Santa Cruz COMPREHENSIVE WATER COST OF SERVICE STUDY CITY COUNCIL JUNE 14, 2016.
City of San Mateo 2016 Reach Code
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
City of Petersburg Water and Wastewater Rates
CITY OF SAN JUAN CAPISTRANO
Final Rate Study Findings
Implementing Budget-Based Rates
Springfield Utility Board Proposed 5.0%
Update on Implementation of Proposed Rates for CII Customers; Outreach
Water Cost-of-Service
Water Usage & Drought in Austin
Matthew S. Dickens Resource Conservation Manager
City of McCall Water Rate Study – Draft Rate Recommendations
Drought Planning Through Integrated Rate Design
Director Jerry Werner March 26, 2010
Paul D. Jones II, P.E., General Manager August 25, 2016
Town of Wrentham DPW Water Department
Water Rate Modification – Public Hearing
Water Rates Public Hearing
Presentation transcript:

Pathways to Lasting Solutions “The Longest Yard” Water Budget Rate Structures & The City of Boulder, Colorado January 25, 2007 © 2006 Malcolm Pirnie, Inc. All Rights Reserved

Pathways to Lasting Solutions Today’s Discussion  Rate Structures in General  Water Budget Rate Structures  Water Budgets and the City  Discussion

Pathways to Lasting Solutions What is a Rate Structure?  Typically consists of two components  Service charge Fixed charge, Readiness to Serve Recover customer billing and metering costs  Volume charge Unit charge based on amount of water used Variety of volumetric rate designs available The design and organization of billing charges by customer class in order to recover revenue requirements

Pathways to Lasting Solutions Uniform Rate

Pathways to Lasting Solutions Decreasing Block Rates

Pathways to Lasting Solutions Seasonal Rate

Pathways to Lasting Solutions Uniform Rate Decreasing Block Rates Increasing Block Rates

Pathways to Lasting Solutions Uniform Rate Decreasing Block Rates Water Budget Rates

Pathways to Lasting Solutions Flat Rate Declining BlockUniform SeasonalIncreasing Block Budget\ Individualized The Rate Structure Continuum Least Most Conservation

Pathways to Lasting Solutions Water Budget Rates  Designed for resource efficiency  Budget individualized for each customer’s indoor usage and outdoor usage  Retains increasing block structure  Volumetric block thresholds dependent on customer’s usage patterns  Indoor allowance  Outdoor allowance

Pathways to Lasting Solutions Water Budget Rate Components  Indoor allowance  People per household  Building square footage  Number of bedrooms/bathrooms  Outdoor allowance  Irrigable area  Lot square footage  Weather considerations, evapotranspiration

Pathways to Lasting Solutions City of Boulder Water Budget Rates  Drought of  Mandatory water restrictions instituted  Goal:  Reduce water use by 25 percent, or 1.19 million gallons between May 2002 and April 2003  Goal met by November 2002 when million gallons was conserved

Pathways to Lasting Solutions City of Boulder Water Budget Rates  Water restriction prompted Citizen involvement  More flexibility during drought (when and how much)  Preferred to know specific quantity of water needed  More education  City began investigating alternative rate structures in June 2003  Hired consultant to review various structures  Involvement included Citizens Water Resource Advisory Board City Council

Pathways to Lasting Solutions City of Boulder Water Budget Rates  Staff, WRAB selected water budget structure from number of alternatives  City Council endorsed water budget rate structure in December 2004

Pathways to Lasting Solutions Boulder Water Budget Rate Structure  5-tiered increasing block structure (volumetric)  Rates for each block are the same for each class  Block threshold based on each customer’s monthly budget  Block threshold stated as percent of total monthly budget

Pathways to Lasting Solutions Boulder Water Budget Rate Structure  Budget calculation based on customer class  Residential – Indoor allowance + Outdoor allowance  Multifamily – Indoor allowance + Outdoor allowance  Nonresidential – Average Monthly Usage (AMU)  Irrigation – Outdoor allowance based on irrigable area

Pathways to Lasting Solutions Boulder Water Budget Rate Structure Rate (per 1,00 gal) Block Size (% of budget) Block 1 $1.95 (3/4 x base rate) 0% - 60% Block 2 $2.60 (the "base rate") 61% - 100% Block 3 $5.20 (2 x Base Rate) 101% - 150% Block 4 $7.80 (3 x Base Rate) 151% - 200% Block 5 $13.00 (5 X Base Rate) Greater than 200%

Pathways to Lasting Solutions Boulder Residential Water Budget Rates  Indoor allowance  Single family – 7,000 gallons/month  Multifamily – 4,000 gallons/month/unit  Outdoor allowance  Irrigable area “pervious area” Single family – 3-tiered gallons/sq ft threshold basis –Tier 1: 0 to 5,000 sq 15 gal/sq ft –Tier 2 : 5,001 to 14,000 sq 12 gal/sq ft –Tier 3: >14,000 sq 10 gal/sq ft Multifamily – 15 gallons/sq ft  Allocated on a monthly basis using ET index  ET Index = Evapotranspiration Index

Pathways to Lasting Solutions Percentage of Monthly Outdoor Budget Based on evapotranspiration index

Pathways to Lasting Solutions Boulder Nonresidential Water Budgets  Commercial/Industrial  Average Monthly Usage (AMU)  Irrigation  Irrigable area “pervious area” – 15 gallons/sq ft  Allocated on a monthly basis using Et index  Et Index = Evapotranspiration Index

Pathways to Lasting Solutions Single Family Example  Pervious area = 6,000 sq ft  Indoor Annual Budget: 7,000 gal/month * 12 months = 84,000 gallons  Outdoor Annual Budget: 5,000 sq ft * 15 gallons/sq ft = 75,000 gallons +1,000 sq ft * 12 gallons/sq ft = 12,000 gallons Total Outdoor Allowance87,000 gallons  Total Annual Budget 171,000 gallons

Pathways to Lasting Solutions Monthly Water Budget (indoor/outdoor) Gallons

Pathways to Lasting Solutions Single Family Example (continued)  July usage = 30,000 gallons  July budget:  7,000 gallons + 87,000 gallons * 20%  July budget = 25,000 gallons  July volume charges for 30,000 gallons usage:  Block 1: 0 to 15,000 gallons:15 Kgal * $1.95 =$29.25  Block 2: 15,000 to 25,000 gal:10 Kgal * $2.60 = $26.00  Block 3: 25,000 to 38,000 gal: 5 Kgal * $5.20 = $26.00 Total July Volume Charges:$81.25

Pathways to Lasting Solutions What’s in Store for 2008  Continue to monitor changes in usage patterns  Irrigable area adjustments  Right-of-Way adjustments  Reviewing commercial and industrial budget basis  Average monthly usage  Historical monthly usage  Indoor/outdoor allocations  Continued community involvement

Pathways to Lasting Solutions Discussion