Tactics.  Garden Apartments  Town Homes  Apartment Buildings 2.

Slides:



Advertisements
Similar presentations
Author: Thomas Maloney Near-Miss 24/7/365 Safety Calendar February 2009 Incident Command.
Advertisements

FIRE GROUND STRATEGY AND TACTICS
Firefighters trapped… …a case study December 2, South Morton Avenue Morton, Pennsylvania Edwin C. Kline
Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge.
Strategy and Tactics with Limited Staffing
Safety Officer State Practical Skill Final Exam. Create a Incident Safety Plan State Practical Skill Exam Using the Structure Fire Safety Report complete.
Initial Engine Company Operations. – Command Post location Move away from the pump panel once command is transferred from the Engineer to an Officer –
STAGING BOONE COUNTY FIRE PROTECTION DISTRICT. What does staging mean to you?
Apparatus Assignments Presentation January 24, 2011.
Slide 5-88 Side A Exposure Side A Walk-around 100 R Street Command Sequence # 8.
Slide 5-1 UNIT 5: WATER SUPPLY, FIXED FIRE PROTECTION SYSTEMS, AND SALVAGE.
May 2014 MCO Training:.  Session:  2 Hours  30 minutes class  2 Practice drills  Objectives:  Review RIC and Mayday procedures  Introduce the default.
Low Rise Occupancies Center Hallway Attack
1 Fire in CHS Environmental Health & Safety Fire Marshals Office.
1 Engine Company Riding Positions Handline Stretching.
Blackwood Fire Company
Riding Assignments Presentation February 28, 2011.
State of Kuwait 3rd Intl Fire & Safety Conference & Expo 4-6 March 2014 Building Performance for Emergency Response Incident Examination and Tactical Response.
East Fishkill Fire District Mayday/Urgent Radio Transmission Procedures.
East Metro Training Group Tactical Training 1 st Quarter, 2011.
Tukwila Fire Department
Fire Ground Operations  Command Structure  Responsibilities  Roles.
Training On Demand. Purpose To provide fire fighters at an emergency incident a team with pre-assigned duties aimed at rescuing downed, lost or trapped.
DALE CITY VOLUNTEER FIRE DEPARTMENT Cluster Homes Firefighting Strategies & Tactical Recommendations.
Rapid Intervention Team & MAYDAY Procedures
Personnel Accountability Purpose: Identify a system of firefighter accountability on site of an incident and account for all firefighters, at any given.
Monterey County Fire Operations Manual HIGH-RISE FIREFIGHTING GUIDELINES.
Standard Operating Procedures. The firefighter will demonstrate a basic knowledge of standard operating procedures as a means of positioning and utilizing.
United States Fire Administration Chief Officer Training Curriculum Operations Module 1: Application of the ICS.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Select and deploy the appropriate hose lines to accomplish fire confinement and extinguishment.
NFPA 1710 Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations and Special Operations to the Public.
MAYDAY2004 This presentation is a work in progress and has not yet been adopted as policy. It is meant as a training guide to better prepare our crews.
IMS Chapter J1-2 1 Presented by Zone 3 Training Officers “The people that make it happen” Command Structure: Unit 2.
MODULE:3 FIRE CONFINMENT AND EXTINGUISHMENT. OBJECTIVES Module 3 Overview Select and deploy the appropriate hose lines to accomplish fire confinement.
Maryland FF Fatality October 10, Investigation  NIOSH General Engineer  NIOSH Occupational Safety & Health Specialist  Fire Department Safety.
HIGH RISE OPERATIONS College of Lake County Fire Science Technology FST 117.
High Rise October DISPATCH E82, E83, E81, E97, E86, E95, T82, T98, R81, R83, R97, B8, B9, OSO respond to a reported structure fire at 777 W. Lake.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
Slide 6-1 MODULE 6: PRIVATE DWELLING SIMULATIONS.
ELGIN FIRE DEPARTMENT - TRAINING DIVISION INCIDENT MANAGEMENT SYSTEM.
ELGIN FIRE DEPARTMENT - TRAINING DIVISION INCIDENT MANAGEMENT SYSTEM.
Part C: Class D Fires and Tactical Considerations.
TACTICS & STRATEGY II Fire Suppression.
INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT.
1. 2  Dispatch information  Day of week  Time of day  Pre-incident survey  Observations  Building construction, layout  Bystanders.
INCIDENT MANAGEMENT SYSTEM SETS & REPS RADIO PROCEDURES.
RAPID INTERVENTION TEAMS This presentation is a work in progress and has not yet been adopted as policy. It is meant as a training guide to better.
FIRE COMMAND 1A Incident Command Project. SYNOPSIS: While operating at a residential structure fire, three firefighters experienced a catastrophic floor.
Division/Group Supervisor, Roles and Responsibilities.
Fireground Operations: Structure Fires Union County SOG 3.16.
GENERAL ORDER INITIAL OPERATIONS AT HIGH RISE STRUCTURE FIRES HOWARD COUNTY DEPARTMENT OF FIRE AND RESCUE SERVICES AND FIFTH DISTRICT VOLUNTEER.
Quarterly Training May  Terminology  Building Construction  Keys to Incident Resolution  First Alarm STRIP MALL S.O.G.
Fire ground Procedures and Command Modes For a number of years the VRFA has used terminology on scene of an incident that was consistent with Zone 3 practices.
Fireground Operations: Staging Union County SOG 3.24.
“The initial radio report is probably one of the most important communications we transmit throughout an entire incident”. Alan Brunacini.
Fire Service Incidents. Today’s fire service does much more than fight fires. The Fire Service has become the primary source of emergency response and.
Fire Ground Roles & Responsibilities On scene reports & Truck and seat assignments.
First To Arrive Duties Training Union County SOG 3.12.
COMMAND BOARD BASIC DESIGN AND OPERATION (Command and Control) (Accountability) (ICS) Presented By: OCWFCD 1.
Firefighting Strategies & Tactical Recommendations
Welcome To High Rise Operations ! Like The Jefferson's...
Review-Definitions 4.5 Division – (“Division Supervisor” shall be the title utilized to describe this appointment) Established to divide an incident into.
Structure Fire Operations
Fires in Residential and Commercial Townhouses and Rowhouses
NOVA MANUAL TRAINING TOWNHOUSE June 2009
Atlanta FF Fatality November 23, 2006.
Firefighting Strategies & Tactical Recommendations
Presentation transcript:

Tactics

 Garden Apartments  Town Homes  Apartment Buildings 2

 Garden Apartments  Typically: ▪ Two to three story buildings ▪ Single story units ▪ Exterior access 3

4

5

6

7

 …are both a multi-story building and multi – story unit  Typically the sleeping areas are a floor above the kitchen and living area  Access is generally on the ground floor  Interior stairs access upper floors of each unit  Garages are on the ground floor or attached 8

9

10

11

12

13

 Interior hallways  Single floor units, multi-floor building.  Common entrance or lobby  Typically stairwells and standpipes  Older buildings can have dry non-looped systems 14

 Interior hallways are dangerous.  Anticipate high heat and low visibility.  Controlled ventilation is critical to support fire attack. 15

16

17

Multi-Family Tactics  Residential Tactics Appropriate for Garden Apartments and Town Homes 1 st Engine – Attack, Supply 2 nd Engine – Assist attack/backup line, assure supply 3 rd Engine – Exposure 4 th Engine – RIT 1 st Ladder – Roof Ventilation? 2 nd Ladder – Interior Ops 18

19  Mid-rise evolution

 1 st BATTALION - Establish or assume Command and announce location of Command Post Confirm and announce the primary firefighting stairway. - Confirm and announce primary evacuation stairway. - Assign companies to Lobby Control, areas of refuge and Staging.  1 st ENGINE COMPANY - Radio initial Size up report to include number of floors and building occupancy type. - Assume Fire Attack duties and report to best known location of problem. - Communicate to IC or Dispatch how you are accessing area. EXAMPLE: E18 at scene side “A” – advancing to third floor via North stairwell to investigate. - Advise IC conditions of lower floors while ascending to fire floor. (When a ladder company is immediately available, the ladder company should assume investigation duties and engine company personnel should prepare for fire attack in the stairwell or floor below the fire). 20

 2 ND ENGINE COMPANY - Assist attack line/crew - Position apparatus on FDC. D/O makes FDC connections and establishes water supply. - Officer and FF stage bundle(s) for Backup line or duties as directed by IC  3rd ENGINE COMPANY -Exposure line to floor above or adjacent units  4th ENGINE COMPANY - RIT  1 st LADDER - Interior operations  2nd LADDER - Ventilation 21

RESCUE REMOVAL Do not waste resources on people not in immediate distress. There may be people you cannot see that are in greater distress There may be people you cannot see that are in greater distress ! 22

23 It’s a fact….fire goes up! General Tactical Wisdom: First Two Engines (attack and back up) to the lowest floor on fire; 1 st and 2 nd arriving by Best Practices. Third engine to the floor above; also Best Practice.Attics: Watch for spread to the attic via interior, exterior and chases. Assume all attics are common.

 Use the same terminology:  Garden Apartment  Townhome  Apartment Building  What floor is the fire on?  “Fire showing from floor 4, side A”.  Apartment Buildings – 2 critical things:  Identify the fire attack stairwell  Understand and communicate the hallway conditions in a CAN report. E- 4 in 3 rd floor hallway, heavy smoke conditions, floors 1 and 2 are clear, we need one engine company to help with our stretch. 24

 Upper floor fires  Roof cuts above apartment and hallway  Pressurize the stairwells  Cold smoke will not vent upward  Lower floor fires  Hydraulic ventilation aided by pressurized stairwells  PPV These assignments are influenced by the incident needs. Two or more ladders may be needed to accomplish each incident goal. 25

 5 minutes  Get map book, Geocode book and complex map books and meet back here. 26

27

28

29

30

31

32