Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf

Slides:



Advertisements
Similar presentations
ACEC Conference March 5, 2012 Trudy Elsner P.E., Metro Maintenance, Engineering Services Sheila Johnson P.E., Metro Maintenance, Traffic Services.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
MAJORS COST ESTIMATING TOOL WORKSHOP January 19, 2012 Cost Estimating Tool Overview.
St. Croix River Crossing Project Public Information Meeting
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
Cost Estimation System Tool
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Utah’s Use of CMGC & Project Delivery
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
Lunch. Bryan District Average Construction Cost Grade Separation –$ 10 Million 2 Lane to 4 Lane –$ 2.3 Million/ Mile 2 Lane to Super 2 (passing zones)
Safety Audit Components Safety assessment for risk Management.
Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District.
© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011.
LADOTD CONSTRUCTION COST ESTIMATING Charles Nickel, P.E. Cost Estimate & Value Engineering Director Office: (225)
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
I-69 Team 3. Introduction History of project Proposed Route Challenges.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
UDOT I-15 The Point Design-Build Project
Lets and Quantities Report Mark Wolfgram Division of Transportation Investment Management Wisconsin Transportation Builders Association Annual Meeting.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015.
Traffic Barrier Guidelines Section 3.0 Potential Roadside Obstacles Hands-On Workshop III July
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
August 30, 2012 Cost Estimate Review Closeout Presentation St. Croix River Crossing Project Minnesota and Wisconsin.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
PROJECT MANAGEMENT TRACKING SCHEDULES Audrey Demeter, PE,PM Casey Unrath, EIT.
Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Zoo IC Phase II – WTBA Staging December 16, 2014.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
Traffic Signs Part Two. What do these 2 signs tell you?
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Lunch. Estimates Ballpark Accountant Typical Stages Conceptual (Alternatives) Schematic 30% Plans 60% Plans % Plans.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
1% Sales Tax Commission Board Meeting June 3, 2015.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
I-15 North Phase 4 Preliminary DRAFT CRA Results July 2014
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Interdisciplinary teams Existing or new roadway
Utility Cost Estimating In Practice
Traffic Control Plan Development Course
PS&E – Plans, specifications and estimate
SW Gage Blvd - Street Repair Project
Critical Transportation Issues
Safety Audit Components
I-295/Malcolm X Avenue Interchange Improvement Project
Contract 60X10 Informational Meeting Weber I-55
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Robincrest/Elmgate/ Linneman Improvements Welcome!
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
JLEIC Accelerator R&D Meeting
Life Cycle Costing.
Presentation transcript:

Programming/BudgetEngineering.

Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf mega/mg-budget-est-mgmt.pdf Major Cost Estimating Tool: major.shtm

COST ESTIMATING TYPES WisDOT Base Estimate (Current Year Dollars) FHWA Year of Expenditure (YOE) Estimate

4 Major Roadway Items Costs Item Quantity x Est. Unit Cost Allowable/Allowance Factors Major Item Cost subtotal x predetermined percentages for items to the left Risk Factor  Pavement, Base & Subbase Mainline & System Ramps Service Ramps Cross Road Frontage Roads Local Roads  Removing Pavement  Barrier Wall  Curb & Gutter  Earthwork  Structures Bridge Removal New Bridge Retaining Wall Removal New Retaining Wall New Noise Walls New Box Culvert/Extension  Drainage  Erosion Control & Restoration  Traffic Control & Staging  Lighting  Signing/Marking  ITS/FTMS  Roadway Incidentals  Engineering  Independent assessment of the project and potential for risks that could drive up project costs.  320.XXXX Concrete Pavement  460.XXXX Asphaltic Pavement  204.XXXX Removing Pavement  603.XXXX Barrier Wall  601.XXXX Curb and Gutter  205.XXXX Excavation  502.XXXX Structures  SPV.XXXX Special Provision  608.XXXX Drainage  625.XXXX Erosion Control  643.XXXX Traffic Control  659.XXXX Lighting  637.XXXX Signs  647.XXXX Marking  677.XXXX ITS/FTMS  690.XXXX Roadway Incidentals  Engineering Contract Uncertainty Don’t know what you don’t know

LIFE CYCLE COST ESTIMATE Major Roadway Item Costs Preliminary Estimate LC 11 LC 15 LC 20 Allowance Factors Risk Factor DSR Estimate PSE Estimate As project development progresses, risk and allowance factors are incorporated into refined estimate and quantities. LC 40 Award Estimate LC 50 Final Cost ESTIMATION PRE- CONSTRUCTION $100$300$500$505$636 CCO UNCERTAINTY CCO

KNOWN - UNKNOWN MAJOR RDWY ITEMS STUCTURES SPECIAL CONST. ELEMENTS ALLOWNACE ITEMS PROJECT DELIVERY CSS EXTERNAL COSTS SCOPE CCO/Claims RISK ADJUSTMENTSUNCERTAINTY KNOWNUNKNOWN QUANTIFY % FACTOR = Project Contingency

KNOWN - UNKNOWN MAJOR RDWY ITEMS STUCTURES SPECIAL CONST. ELEMENTS DELIVERY CSS EXTERNAL COSTS ALLOWANCE SCOPE CCO/ CLAIMS RISK ADJUSTMENTSUNCERTAINTY KNOWNUNKNOWN QUANTIFY % FACTOR = Project Contingency

SIDE BENEFITS: 8 LC 20 LC 50 $100 Preliminary LC 15 LC 11 LC 40 $300 DSR $500 PSE $505 Award $636 Final Improve data integrity Improve performance measurement of “in-budget” Improve reporting to legislature/industry Improve allowable factor percentages Improve risk factor percentages Improve program stability Improve investment strategies

YEAR OF EXPENDITURE COST ESTIMATE DESIGN CONSTRUCTION REAL ESTATE UTILITIES CCO/ CLAIMS RISK ADJUSTMENTSUNCERTAINTY KNOWNUNKNOWN QUANTIFY % FACTOR TIME = Project Contingency

Sharon Bremser, P.E. Major Projects Program Manager