Structured Cabling Project

Slides:



Advertisements
Similar presentations
Cabling system components
Advertisements

IST 126 Transmission Media. Characteristics of Transmission Media Cost Ease of installation Bandwidth capacity – the amount of data that can be sent in.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Cable Management.
Cabling UTP AND FIBER CABLING. Structured Cabling Infrastructure Mounted and permanent Allows patching Comfort that infrastructure is OK Components: Information.
Chapter 3: Planning a Network Upgrade
HOW TO MAKE UTP CAT-5/5e CABLE
Antonio González Torres
Institute of Technology Sligo - Dept of Computing Structured Cabling Project Chapter 9 Paul Flynn Paul Flynn.
Electrical Safety.
111 © 2002, Cisco Systems, Inc. All rights reserved. Finish Phase Overview Testing Troubleshooting Certification Documentation.
+ Straight-Through Cable Construction Lab 4. + Data Transmission In data transmission system, the transmission medium is the physical path between transmitter.
Installation. Indoor Unit Installation Typical Installation.
Chapter 4 – Cisco Semester I
Network Engineering Taster Day Mark Clements. 30 March 2012Engineering Taster Day 2 Welcome to Engineering Taster Day: Morning Session Ambassadors Fire.
Module 5 - Switches CCNA 3 version 3.0 Cabrillo College.
CIT 470: Advanced Network and System Administration
SEM 1V2 Chapter 9 Structured Cabling
Physical Transmission Media 8 5/9/ Modified by: Brierley.
Hands On: Cutting and Connectorizing UTP Chapter 3a Panko’s Business Data Networks and Telecommunications, 6 th edition Copyright 2007 Prentice-Hall May.
Cisco Academy – Chapter 5 Physical Layer. Physical Layer - 1 defines the electrical, mechanical, procedural, and functional specifications for activating,
Telecom Cabling Cable pathways.
(part 4).  Gateways  A gateway is responsible for translating information from one format to another and can run at any layer of the OSI model, depending.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
Institute of Technology Sligo - Dept of Computing Many Roads To Home Paul Flynn.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
NETWORK DESIGN Customer requirements Network topologies Cable choice Hardware TSB 75 TSB72.
Electrical Power Systems
The making of Ethernet Standards For the Ethernet Cabling & PoE (power-over-Ethernet).
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
Installing the Network Chapter 11 Release 16/7/2009.
Cisco – Semester 1 – Chapter 9 Preview Review. Behavioral Objectives Document all work –Do it as work proceeds –Same as chapter 8 guidelines –Don’t forget.
Copyright CCNA 1 Chapter 4, Part 1 Cable Testing By Your Name.
1 Telecom Cabling Patch panels, cabinets and raised floors.
CCNA 1 Module 4: Cable Testing.
Chap 9 Structure Cabling Project Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
1 Project # 2 Steve Klesper Tom Ondick Garry Meadows Aaron Hurt Tim Wade.
NETWORK CABLING Chapter 2
1 CISCO NETWORKING ACADEMY PROGRAM (CNAP) SEMESTER 1/ MODULE 4 Cable Testing.
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
Structured Cabling Project Chapter 9
Crossover Cable Construction
1 Guide to Network Cabling Fundamentals Chapter 5.
SYSTEM ADMINISTRATION Chapter 4 Network Media, Connectors, and Their Characteristics.
Copper Media Describe the specifications and performances of different types of cable. Describe coaxial cable and its advantages and disadvantages over.
Chapter 9 Review Structured Cabling Project. Chapter 9 Focus The focus of this chapter is standards for networking media. You read that when RJ-45 jacks.
Module 3: Networking Media Safe Handling and User of a Multimeter Voltage Measurement Resistance Measurement Series Circuits 3.1.9a.
Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
Project On Ethernet Cable Building & Video Recording James Maclean & Stephen Craig.
1 Discovery 2, Ch 4 Notes. 222 Cabling Standards Standards ensure that networks perform to expectations US—IEEE & ANSI/TIA/EIA Canada—CSA (Canadian Standards.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
Chapter 2.  Upon completion of this chapter, you should be able to:  Select & install cables for connecting to a dial-up network  Select & install.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
COPPER AND FIBER REVIEW
Chapter 5a. 5a-2 Single Twisted Pair Jacket Four pairs (each pair is twisted) are enclosed in a jacket. Copyright 2011 Pearson Education, Inc. Publishing.
Transmission Media. Characteristics to consider for Media Selection Throughput Cost Installation Maintenance Obsolescence vs bleeding edge Support Life.
Lesson 2—Networking BASICS1 Networking BASICS Network Media Unit 1 Lesson 2.
NETWORKING MEDIA b Shielded twisted-pair - 2 pair, 150 ohm b unshielded-twisted pair - 4 pair, 100 ohm b fiber optic cable - 2 fibers b coaxial cable -
Recognizing and correcting hazards
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
Media, Connections, and Collisions
Hands On: Cutting and Connectorizing UTP
Module 5 - Switches CCNA 3 version 3.0.
Hands On: Cutting and Connectorizing UTP
Hands On: Cutting and Connectorizing UTP
Presentation transcript:

Structured Cabling Project 4/19/2017 Structured Cabling Project Honolulu Community College Cisco Academy Training Center Semester 1 Version 2.1.1

Overview Focuses on standards for networking media. 4/19/2017 Overview Focuses on standards for networking media. TIA/EIA 568A - cabling standard. TIA/EIA 606 - labeling standard. Techniques for dressing and securing the cable. RJ45 jacks, wiring sequence. Wiring closet design. Equipment found in a wiring closet. patch panels, hubs, bridges, switches, & routers.

4/19/2017 TIA/EIA 568A Standards Defines horizontal cabling.

Telecommunications Outlet 4/19/2017 Telecommunications Outlet Telecommunications outlets are wall mounted. TIA/EIA 568A specifies RJ45 jack for making the connection to Cat 5 UTP.

RJ45 Mounting Two types of wall mounts: 4/19/2017 RJ45 Mounting Two types of wall mounts: Surface mounting (easier to install, concrete walls) Adhesive-backed box. Screw-mounted box. Flush mounting. Surface mounting is generally preferred. Faster, lower labor costs. Maybe the only option in some cases.

Flush Mounting Concerns 4/19/2017 Flush Mounting Concerns Type of wall material. Plaster tends to crumble, has wood lath backing. Wood more solid support. Can install in baseboard, but avoid lower 5cm (2”) -need to clear wall’s bottom plate or framing. Avoid door and window trims. Drywall - obstructions due to studs every 18-24”. Check with small hole for obstructions. Select position 30-45cm (12-18”) above floor. Level.

Flush Mounting Concerns (cont.) 4/19/2017 Flush Mounting Concerns (cont.) Safety Precautions Any time you are working in walls, ceilings, or attics, it is extremely important that you remember to turn off the power to all circuits that go to, or pass through, the work area.

Wires in RJ45 Jack Performance is closely linked to the quality of the wire connections. Do not strip off any more of the jacket than needed, about 2.5cm (1”). Removing too much jacket insulation can slow data throughput. Arrange wires in proper order. Keep wires centered in jack. If skewed, data throughput can decrease. Use punch tool to “punch down” wires into jack.

Tips in Installing Cable Strip back cable jacket only as much as needed (about 2.5cm or 1”). Maintain twists as close as possible to termination (max 13mm (1/2”) for Cat 5 UTP). Min bend radius is 4 times the diameter of cable; never exceed a 90o bend. Use cable ties to secure cable, loosely. Avoid stretching cable, 11.3kg (25 lb) of pull max. Leave slack in cable, to reach floor and 60-90cm (2-3 ft) in each direction.

Tips in Installing Cable (cont.) Use Velcro straps; no staples.

Documenting Cable Runs Documentation is useful when upgrading or modifying the network in the future. Cut Sheet - diagram of cable runs.

Documentation TIA/EIA 606 specifies labeling. Unique identifier required on each termination hardware unit or on label. Cables are labeled at both ends. Use unique and descriptive labeling. Ex. Rm 516 West Wall Labeling is designed to help diagnosis and location of problems. All labels must meet legibility, defacement, and adhesion requirements (UL969).

Cabling Runs Run all cables at once, if you need 4 cables, use 4 rolls and pull them all at the same time. Mark each cable end (3 times). Tape cables together to pull string. Label cable ends before cutting the cables.

Routing Cables Easiest way is to mount cables on wall. Use tie-wraps to attach cables to walls. Adhesive tie-wraps - cannot be moved. Screw mounted tie-wraps - can be moved later.

Raceways Raceways - wall mounted channels with removable covers. Two types: Decorative raceways finished appearance for use in visible areas. Gutter will hold several cables. Used in attics, dropped ceilings, etc. Raceways can be adhesive-backed or screw mounted. Adhesive-backed - easy to install, easy to remove.

Raceways

Cables in Existing Raceways Do not run cables next to power lines or in existing raceways with power lines. Causes EMI (electro-magnetic interference).

Safety Precautions Turn off power to all circuits in work area. If unsure, turn off all power. Know locations of fire extinguishers. Long pants and sleeves for protection, but avoid baggy clothing. Survey the area - especially dropped ceiling area. Wear eye protection. Be aware of hazards like lead, PCBs or asbestos. Keep work area orderly and neat.

Building Safety and Codes Find out local building codes. Be aware of any restrictions to drilling or cutting holes in fire walls or ceilings. Holes may need to completely filled with non-combustible patching compounds. Fire-rated cable must be used in spaces where air is circulated.

Horizontal Cabling Supports In dropped ceilings, do not lay cable on top of ceiling. Use wall mount gutters, tie wraps or ladder racks to support cables.

Other Tools Telepole Fish Tape Telescoping pole used to string cables. Fish Tape Used to run cables thru a wall. Remember to leave extra cable in the walls and ceilings!

4/19/2017 What is a Wiring Closet? Wiring closet serves as a central junction point for the wiring and wiring equipment used to connect devices in a local area network (LAN). Center point of star. Typical equipment: Patch panels Hubs Bridges Switches Routers.

4/19/2017 MDFs and IDFs Networks can have several wiring closets (extended star topology). One is designated as the MDF, main distribution facility. Other wiring closets are the IDFs, intermediate distribution facilities. IDFs are connected to the MDF, and are dependent on it. IDFs connect to MDF by backbone cabling.

Horizontal Cabling Connections 4/19/2017 Horizontal Cabling Connections Horizontal cabling usually terminates at the patch panel.

Patch Panels Provides pin locations and ports. 4/19/2017 Patch Panels Provides pin locations and ports. Pin locations on back (wires are punched down). Ports (RJ45) on the front of panel. Wires are color coded, not interchangeable. Act as switchboard where horizontal cabling from workstation can be connected to other workstations or devices.

Patch Panels (cont.) Poor connections can cause slower data rates. Arrange wires in ascending order. Logical sequence of wires from work area. Make use of cut sheet. Keep wires centered in jack. If skewed, data rate will decrease. Avoid exposing too much wire (strip off about 38-50 mm (1 1/2” to 2”) of jacket). Don’t untwist wire pairs more than necessary. Use punch tool.

Patch Panel Mounting Most common is distribution rack. Easy access to front and back. Need to provide 30-45mm (12” - 18”) in back for physical access. Standard size of distribution rack is .48m or 19”.

4/19/2017 Testing Your Network 1. Break the system into smaller logical groups or elements. 2. Test each group or element. 3. Note any symptoms or problems. 4. Determine what the most likely problem element is. 5. Use substitution or additional testing to determine if the likely element is in fact the problem. 6. If not, proceed to the next most likely element you suspect.

After finding the problem 4/19/2017 After finding the problem 7. When the dysfunctional element is found, repair it if possible. 8. If it is not possible to repair, then replace it.

Network Operations Testing 4/19/2017 Network Operations Testing IEEE & TIA/EIA have established standards to test whether your network is operating at an acceptable level. use this measurement as baseline. baseline is a record of your network's starting point or newly installed performance capabilities. Continue to test your network on a regular basis in order to ensure that it performs at its peak. Can spot problems that may be caused by aging, poor maintenance practices, weather, etc.

4/19/2017 Cable Testers Cable testers certify cables to IEEE & TIA/EIA standards. Basic features, can measure: Cable Distances Connectivity Wire maps for crossed pairs. Split pairs. Signal Attenuation. Near-end crosstalk (NEXT). Noise level tests.

Measuring Distances Max cable lengths are given by TIA/EIA 568A. 4/19/2017 Measuring Distances Max cable lengths are given by TIA/EIA 568A. Cable testers use time domain reflectometry to measure the distance to open or shorted end. TDR sends a signal and times its reflection back from the end of the cable. Accurate to within 61 cm (2ft).

4/19/2017 Connection Tests Distance measurements can determine whether the connections at the patch panels, or at the telecommunications outlets, are good.

Correct Wiring Wire map shows which wire pair connections to what pins. 12 36 45 78 (Near End) (Far End) Correct Wiring

Crossed Pairs Crossed pairs are connected in reverse order on one end. Wire map: 12 36 45 78 21 36 45 78 Correct Wiring Crossed Pair.

Split Pairs Split pairs occurs when wires used for a circuit are not from the same pair. Can be detected by visual inspection or by crosstalk measurements. Split pairs do not have self-shielding. Cannot be detected by wire map. Split Pairs.

Signal Attenuation Attenuation is due to loss of energy in the signal (less power). Cable testers measure signal from a signal injector, attached at far end of the cable. Attenuation generally measured at several frequencies. For CAT 5 cable - up to 100 MHz. TIA/EIA 568A specifies allowable losses in various types of cables.

Near-end Crosstalk Causes of near-end crosstalk. Crossed pairs - most common. Untwisting of wire pairs, usually at patch panel. Cables too tightly pulled (causing untwisting). Too sharp corners (bends) - pairs change positions. Split pairs. Cable testers measure a series of frequencies up to 100Mhz - higher values are better, low values indicate problem.

Noise Level Test Sources of Interference: Fluorescent lights, televisions, monitors, motors, power lines, welders, auto ignitions. Radio stations, radar, transmitters. Interference sources can be detected by knowing the frequency of interference (from noise level test). Locating sources of outside interference: Measure noise on cable (disconnected from computer equipment). Trial and error method of turning off electrical devices to see which produces the interference.

Summary Installing RJ45 jacks. Safety concerns: Surface mount with adhesive backed or screw box. Max untwisting is 13mm (1/2”). In punching down, jacket should be within 6.4mm (1/4”) of pins. Poor wire connections can affect performance. Safety concerns: 1.Turn off power to area. 2.Long sleeves, long pants, but not baggy. 3.Fire extinguisher locations. 4.Eye protection. 5.Neatness.

Summary (cont.) Documentation. Cable installation: Patch panels. Cut sheet - location of cable runs. Label cables and terminations. UL 969 - legibility, defacement, adhesion. Cable installation: MDF and IDFs (wiring closets). Mount cables with tie wraps, velcro; no staples. Avoid sharp bends; No stretching. Leave slack, service loops. Patch panels. Acts as switchboard for horizontal cabling. Usually mounted on distribution rack.

Summary (cont.) The End Cable Testing. Establish baseline using IEEE & TIA/EIA specs. Distance, Connectivity with wire maps, Attenuation, Near-end crosstalk, Noise tests. Crossed pairs, Split pairs. The End