Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, 24-25 March 2015 Overview.

Slides:



Advertisements
Similar presentations
ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Technical Session Lightning Protection Highlights &
Advertisements

International Telecommunication Union Technical Session on Home Networks Geneva, 29/04/2011 ITU-T Study Group 5 Protection against Lightning Phil Day Australia.
International Telecommunication Union Geneva, July 2009 Electrical Safety and Electromagnetic Compatibility Ahmed ZEDDAM, ITU-T SG 5 Chairman (France.
International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva,
International Telecommunication Union ITU-T Workshop Lightning Protection Technical Session December 2005, Geneva, Switzerland Risk assessment for.
ITU-T SG5 activities on EMF
Standards for the protection of radio installations
Relevant ITU-T Recommendations for the Protection of Base Stations
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti Adviser, ITU-T Study Group 5.
BS7671 Formula and Tips.
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
Zone 1 & 21 Universal Access Point Enclosure System I Copyright Extronics Ltd Zone1 & 21 Universal Access Point Enclosure System.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
EE4503 Electrical Systems Design
ASSIGNMENT TEACHER Smt. K.VASUMATHY GROUP MEMBERS:- MANSI DWIVEDI (ET 4 TH SEM) ARTI DWIVEDI (ET 4 TH SEM) DIKSHA CHANDRAKAR (ET 4 TH SEM) MAMTA CHOUDHARY.
© 2012 DEHN + SÖHNE / protected by ISO Site visits to Botas Lightning and Surge Protection 1.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
International Telecommunication Union ITU-T Study Group 05 Damage to equipment in Japan Tetsuya Tominaga Technical Session on Home Networks Geneva, 29/04/2011.
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
ITU Regional Standardization Forum for Africa Dakar, Senegal, March 2015 Energy and Environment Protection of Equipment Bocar KELLY, Head of Architecture.
“Equipment bonding jumpers: are they always necessary?” Massimo Mitolo, Senior Member, IEEE.
Electrical Earthing D.K.Pathirana. Applications of earthing Protect human against lightning and earth fault condition Protect the premises against lightning.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
Single Phase IEC and EATS Distribution Transformers
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
Overvoltage protection (surge arrester)
Efficient broadband deployment & multi-service implementation European home networking platform Dominique Roche (ATTM chairman) DOCUMENT #:GSC13-GTSC6-19.
ETSI Home Networking activities Rainer Münch ETSI TISPAN Chairman Presenter: Ian Spiers DOCUMENT #:GSC13-GTSC6-20r1 FOR:Presentation SOURCE:Rainer Münch,
Protection against Electric Shock (Note: All the mentioned tables in this course refer to, unless otherwise specified, Low Voltage Electrical Installation.
Earthing system.
All rights reserved Surge Arrester.
International Telecommunication Union ITU-T SG 5 Technical Session “Lightning protection” 12 December 2005, ITU Headquarters, Geneva Risk regarding safety.
Grounding, bonding, and ground fault currents
Earthing configurations Minute Lectures Earthing or not? Is that the question? It is often thought that an electrical appliance can only be earthed or.
DAKAR, Senegal, 24 - March 25, 2015 ASSESSMENT OF THE CONFORMITY OF THE BASE STATIONS TO THE NORMATIVE REQUIREMENTS RELATED TO THE PROTECTION AGAINST LIGHTNING.
CHAPTER 6 EARTHING SYSTEM.
Wiring and Grounding.
Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,
Summary of Results Study Period ITU-T Study Group 5 Environment and Climate Change Mr Ahmed Zeddam.
Peter Brackett- Canadian Pacific Railway Robert MacMillan- CSX Railroad Earl Chapman – Railway Consultant, (previously CN) Keeping Signals Working What.
Committed to connecting the world ITU-T Study Group 5: the role of green ICT standards for sustainable ICT development: Paolo Gemma Huawei Chairman, Working.
International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011.
Committed to connecting the world With ICTs everywhere, how safe is EMF? Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group for Africa (SG5 RG-AFR)
International Telecommunication Union Committed to connecting the world 4 th ITU Green Standards Week Paolo Gemma Chairman of Working Party 3/5 of ITU-T.
TELECOMMUNICATIONS SPACES
Electrical Installation II1 Assessment of General Characteristics (Note: All the mentioned tables in this course refer to, unless otherwise specified,
Testing of Low Voltage Installations
Presented by: Nguyen Phan Thanh Southern Taiwan University of Science and Technology.
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
International Telecommunication Union Committed to connecting the world Overview of ITU-T/SG5 “Environment and climate change” Ahmed Zeddam Chairman of.
Eleventh ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia, 21 April 2016 Damage prevention and safety Requirements for.
ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia 21 April 2016 Session2: Damage prevention and safety Resistibility of.
ITU Regional Standardization Forum for Africa Livingstone, Zambia March 2016 ITU-T SG5 Activities A special focus on L.1440: Methodology for environmental.
 Introduction to Wide Area Networks 2 nd semester
Alexandre Piantini University of São Paulo Lightning Transients in Medium- Voltage Power Distribution Lines V Russian Conference on.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
ICT & Environment Seminar Standard & Guidelines For Safe Use.
Electrical Power II Unit 4-Overvoltages Unit 5-HVDC Unit 6-FACTS.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
ITU-T Study Group 5: Environment and Climate Change
WELCOME TO ALL.
ITU-T Study Group 5 “Environment and Climate Change”
Data Line Gas Capsule Protectors
Forum on Energy Efficiency and Future Network Infrastructure
EET 323 – Electrical System Design Lecture 9: Grounding
Electrical components and systems
Electrical components and systems
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Overview of SG5 and SG5RG for Africa activities
Presentation transcript:

Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview of the Overvoltage Protection Guide for Telecommunications Equipment Installed in Customer Premises Dr. Ahmed Zeddam ITU-T SG5 Chairman Orange, France

Introduction This presentation contains a brief overview of the Overvoltage Protection Guide for telecommunications equipment installed in a customer premise which has been published as international standard [Recommendation ITU-T K.98] 2

Information provided in the guide This Guide contains the information needed to protect telecommunications equipment installed in customer premises from damage due to lightning strikes to the power and telecommunications lines/cables. It considers the impact of the different types of power distribution systems, the length of the telecommunication SPD bonding conductor length and the resistance to earth at the customers’ premise. 3

About protection of Equipment  Protecting telecommunications equipment, within a structure, requires a combination of 2 main components: 1.Equipment resistibility. All equipment installed in customer premises has to be compliant with the appropriate resistibility level of Recommendation ITU-T K.21 “ Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents”Recommendation ITU-T K.21 Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents 2.Additional protective measures :  Cable routing practices complying with Recommendation ITU ‑ T K.66 “Protection of customer premises from overvoltages”,Recommendation ITU ‑ T K.66Protection of customer premises from overvoltages  Earthing and bonding practices complying with Recommendation ITU ‑ T K.66,  Installation of Surge Protective Devices (SPD) for overvoltages protection according to Recommendation ITU-T K.66. This includes the use of both Multi-Service Surge Protective Devices (MSPDs) and primary protectors and finally,  Installation of an external lightning protection system (LPS) in order to achieve direct strike protection of the building. 4

Contents The contents of this guide include: Surge coupling and mechanisms of damage Elements of protection Installation of Protection Mains power distribution system types Information is given in this Recommendation with a reference to other documents when necessary 5

Surge coupling and mechanisms of damage 6 S1 = Lightning strike to the building S2 = Lightning strike near the building S3 = Lightning strike to power line or telecom line S4 = Lightning strike near a telecom line This information follows the method of IEC where 4 coupling mechanisms S1 to S4 are defined: This guide concentrates on source S3

Elements of protection Equipment resistibility. The test requirements are given in Recommendation ITU-T K.21. This guide has information on selecting the relevant resistibility level e.g. basic, enhanced or special. Enhanced requirements are recommended for mains power equipment. Special requirements are generally used when high isolation levels are required. 7

Correct classification and use of ports. Detail on this is given in Recommendation ITU-T K.75 “Classification of interface for application of standards on resistibility and safety of telecommunication equipment”. For safety and reliability reasons it is important to connect internal cables (do not leave the building) to internal ports and external cables (cables which terminate in the network or run between buildings) to external ports 8 Elements of protection

Cable routing Information details are contained in Recommendation ITU-T K.66. The user is referred to Recommendation ITU-T K.85 “Requirements for the mitigation of lightning effects on home networks installed in customer premises” and IEC for detailed information. The critical loop is the loop formed by the cabling between the equipments and the earth wires back to the MET. 9 Elements of protection

Earthing and bonding Information details are contained in Recommendation ITU-T K.66. Logically the shorter the SPD bond wire the better. This is confirmed in ITU-T K.98 and it is also expected that the lower the resistance to earth at the customers’ premises the better. This is not always so according to Recommendation ITU-T K Elements of protection

Surge Protective Devices (SPDs). Gives the location of primary protection. Clusters are protected by an Multiservice Surge Protective Device (MSPD). Primary protection is installed to protect MSPDs when required against direct strikes. It is essential with clamping SPDs that the primary SPD protects downstream SPDs. MSPDs are good insurance against damage. Primary protection is only installed when necessary. 11 Elements of protection

Direct strike protection of a structure. Direct strike protection of the structure is outside the scope of Recommendation ITU-T K.98 and the reader is directed to IEC Direct strike protection is only installed when necessary 12 Elements of protection

Installation of protection. The installation of SPDs is well covered in Recommendation ITU-T K.66 and the reader is directed to this recommendation. A particular problem can occur when the Neutral is not connected to the PE under surge conditions and solutions are given. The reader is referred to Recommendation ITU-T K.85 for examples and the techniques of risk assessments. 13 Elements of protection

Mains distribution systems The mains distribution systems can be described as follows: TN-S. The Neutral and PE is earthed only at the distribution transformer TN-C. The PE and Neutral conductors are linked and earthed at the customer premises TT and IT. The PE and Neutral conductors are not linked. The PE conductor is earthed at, but does not leave, the customer premises 14

Simulations The major part of this guide is the simulation of lightning strikes to power and telecommunication lines/cables. They were performed for: The three types of power distribution systems Earthed equipment and floating equipment Protected and un protected equipment installations 15

Simulations For different earthing and bonding conditions at the customer premises: 100 Ω, 2 Ω and no path to earth 10 metre and 1.5 m SPD bonding conductor length To provide information on the current waveform and the energy dissipation in downstream SPDs (in the equipment or in the MSPD) to enable the rating of these SPDs to be more accurately determined 16

Example of simulated configuration 17 L N PEN MET PE SELV 3.0 kV isolation TNV3 1.5 kV isolation Earth electrode resistance Associated earthed equipment Switching Centre Earth electrode resistance

Example of result of simulation 18

Main results of simulation It is possible to protect telecommunications equipment against a direct strike to the services providing the strike point is more than a couple of hundred metres from the customers’ premise in an urban area or denser area. 19

Main results of simulation Floating equipment is far easier to protect than earthed equipment. Earthed equipment can only be protected when the primary protector bond wire is 1.5 m or less. 20

Conclusions It recommends the use of Multiservice Surge Protective Devices (MSPDs) as the first level of protection Primary protection is only installed to protect the MSPD when necessary 21  The majority of installations could be protected for some tens of Euros per equipment cluster and consequently the reliability of service significantly increased

Thank you  ITU-T/SG5 “Environment & Climate Change” itu.int/go/tsg5 itu.int/go/tsg5  ITU-T/SG5 Series K Recommendations (free of charge) itu.int/ITU-T/recommendations/index_sg.aspx?sg=5 itu.int/ITU-T/recommendations/index_sg.aspx?sg=5