09/06/2006F. Scuri - Remote CO shifts at CDF 1 CDF Remote Consumer Operator (CO) shifts in Pisa Motivations and project contour CDF online issues for remote.

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

Consoles and Hardware Status Erik Gottschalk. Overview Consoles will be installed Dec. 19 & 20 Network installation will begin Dec. 11 Installation of.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
DØ Global Monitoring and Ideas for LHC/CMS remote monitoring Pushpa Bhat Fermilab.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
Screen Snapshot Service Kurt Biery LAFS Meeting, 08-May-2007.
Welcome To. Improving Remote File Transfer Speeds By The Solution For: %
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
F.Scuri - I.N.F.N PisaOnline Monitoring for the CDF...1 Online Monitoring for the CDF Run II Experiment and the remote operation facilities T.Arisawa b),
Use of ROOT in the D0 Online Event Monitoring System Joel Snow, D0 Collaboration, February 2000.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
1 2 Basics of Computer Systems Ch.1-A,B,C FALL 2000 Rob Wolfe.
AMS TIM, CERN Apr 12, 2005 AMS Computing and Ground Centers Status Report Alexei Klimentov —
Test Of Distributed Data Quality Monitoring Of CMS Tracker Dataset H->ZZ->2e2mu with PileUp - 10,000 events ( ~ 50,000 hits for events) The monitoring.
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
What does a Computer Do?. What is a Computer? A computer is an electronic device, operating under the control of instructions stored in its own memory,
Streamlining CDF Shift Operations Peter Wilson Mary Convery CDF Detector Operations All Experimenters Meeting February 26, 2007.
What is system software and what are its parts? Programs that control operation of computer Two parts are operating systems utility programs.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
Offline shifter training tutorial L. Betev February 19, 2009.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Update on Windows 7 at CERN & Remote Desktop.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN-IT Oracle Database Physics Services Maria Girone, IT-DB 13 December 2004.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
MultiJob pilot on Titan. ATLAS workloads on Titan Danila Oleynik (UTA), Sergey Panitkin (BNL) US ATLAS HPC. Technical meeting 18 September 2015.
Online Monitoring for the CDF Run II Experiment T.Arisawa, D.Hirschbuehl, K.Ikado, K.Maeshima, H.Stadie, G.Veramendi, W.Wagner, H.Wenzel, M.Worcester MAR.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Preparation for CERN TB - Erika Garutti1 Preparation for CERN test beam H6 test beam area in Prevessin.
ISG We build general capability Introduction to Olympus Shawn T. Brown, PhD ISG MISSION 2.0 Lead Director of Public Health Applications Pittsburgh Supercomputing.
Lesson learned after our recent cooling problem Michele Onofri, Stefano Zani, Andrea Chierici HEPiX Spring 2014.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA HMEP Grant Program ~ Administrative Requirements NASTTPOAnnualConference.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
Towards new Graphical User Interfaces for nTOF experiment Collaboration meeting, Bologna 28 th Nov 2013 Towards new Graphical User Interfaces for nTOF.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
The ALICE data quality monitoring Barthélémy von Haller CERN PH/AID For the ALICE Collaboration.
Meeting with University of Malta| CERN, May 18, 2015 | Predrag Buncic ALICE Computing in Run 2+ P. Buncic 1.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Level & Responsibilities Dirk Düllmann LCG 3D Database Workshop September,
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
INSIDE in-beam PET system assembly and test at INFN Torino
Online remote monitoring facilities for the ATLAS experiment
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Experience between AMORE/Offline and sub-systems
Offline shifter training tutorial
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Presentation transcript:

09/06/2006F. Scuri - Remote CO shifts at CDF 1 CDF Remote Consumer Operator (CO) shifts in Pisa Motivations and project contour CDF online issues for remote CO shifts What is still needed as SW development and HW resources Time schedule and financial requests F. Scuri – I.N.F.N. Pisa

09/06/2006F. Scuri - Remote CO shifts at CDF 2 Motivations and project framework for remote Quality Check shifts ( CDF CO (Consumer Operator) shifts ) Avoid oversee missions just for Quality Checking shifts (8 shift days + + RadWork training + travel time)  save money to allow more people to be onsite for other activities on Physics, Detector upgrades, Operations duties. Acquire know-how for future applications of remote shifts (LHC, ILC,…) Tsukuba and Pisa were chosen as pilot Institutions for the CDF Remote CO shift project Project developed in cooperation with CMS-Fnal, setting-up a multipurpose remote control room in WH-11 at Fnal L.Ristori and F.Scuri were chosen as Fnal and Pisa based reference persons respectively for the CDF-CO remote shift project

09/06/2006F. Scuri - Remote CO shifts at CDF 3 Remote shift development project integration CDF { Tsukuba  Fnal Pisa  Fnal CMS CERN  Fnal

09/06/2006F. Scuri - Remote CO shifts at CDF 4 4 people crew for the CDF data taking shifts (night) SciCo (Scientific Coordinator) Accelerator Operators Detector on-call Experts CO (Consumer Operator) ACE 1 (DAQ Run Control) ACE 2 (DAQ Monitor) The main job for COs is to online check the detector operation quality by looking at the output of the Consumer Monitors

09/06/2006F. Scuri - Remote CO shifts at CDF 5 The CO duties (full list, present status) DutyOperated viaRemote allowed Start/stop ConsumersCommands from and their Monitorsany online cluster node NO a) Check detector plots and fill a run check list everyWEB YES 2 hours Fill e-log with commentsWEB YES and post significant plots Execute the procedure toCommand sequence check several x-sectionsfrom any online node NO a) (XMon) Start the CalibrationCommands from any Monitor patch (DBANA)online cluster node NO a) Check calibrationsWEB YES a) Due to the DOE/Fnal policy, allowing only certified online group members to remotely connect to the online machines (not the case for regular CO shifter)

09/06/2006F. Scuri - Remote CO shifts at CDF 6 SW development to allow full operational remote and local CO shifts in almost identical modes 1) Start/stop consumers and Run on local/remote machine GUI almost completed, their Monitors a GUI allowing actions on the need help for finalization consumer jobs and monitor display by buttons - Communication with the on- line cluster to be defined. 2) Execution of the special Move on WEB the command Started, need solid procedure (XMon) to monitor sequence and parameter help to be completed relevant x-sections passing in a short time 3) Execution of the DBANA no plan at the moment SciCo will take care package (Calib. Monitors)to start DBANA in remote shift mode Duty Project Present status D. Fabiani, CDF support of the Pisa Computing Service, will spend 2 months at Fnal (September and October 2006) working on projects 1) and 2)

09/06/2006F. Scuri - Remote CO shifts at CDF 7 Recent tests with a prototype control room in Pisa Poor quality webcam Desktop running Polycom PVX under Win XP (loan from GR-I Pisa) Desktop running Mozilla, Root, Ghostview, ….. under SL Two screen draw card added (loan from GR-I Pisa) Screen2 displaying: - CO checklist, - E-logs, Calibrations,…. Screen1 displaying - Consumers and Monitor job status - Reference det. plots - Actual detector plots - Instruction Web pag. Two 8 hour remote CO shifts made in spring 2006 in overlap with Fnal to test video connection and Web based procedures: - Web operations O.K. - Network connection ~O.K. - Sound loopback - many crash of Fnal PVX host Kaori Maeshima, CDF CO operation manager, visited the prototype of the Pisa remote shift room on June 14, 2006 LCD 17” CDF owned Low res. std mon.(GR-I PI)

09/06/2006F. Scuri - Remote CO shifts at CDF 8 Remote control room specs required by CDF to start commissioning of remote CO shifts Echo suppression Webcam (Polycom ViaVideo) Desktop running Polycom PVX under Win XP (loan from GR-I Pisa) 4 LCD 17/19“ monitor display Screen 1: GUI windows to handle Consumers and job monitors Screen 2: Event Display and Calibration plots Screen 3: Active run and reference plots for the checklist Screen 4: E-logs, checklist, Instructions (WEB pages) Desktop running Mozilla, Root, Ghostview, ….. under SL 4 monitor draw card (Full system CDF owned)

09/06/2006F. Scuri - Remote CO shifts at CDF 9 Time schedule for commissioning and pilot remote CO shifts - Sept Definition of the procedures for starting shifts in Pisa and for emergency calls for a shifter replacement at Fnal in case of any failure at the shift start-up in Pisa (F.Scuri / L.Ristori) - Sept Test and validate new HW (Pisa and Fnal) for video connection (F.Scuri / K.Maeshima) - Sept Prepare a remote shift schedule for commissioning and year fall periods; according to a CDF/operations requirement, remote shifters must have done at list one on-site shift (F.Scuri / D. Hahn) - Sept. 25 < Nov 15 Remote shift commissioning; 8 day regular owl shifts, Pisa and Fnal in overlap; begin w/o new SW, only WEB driven operations (F. Scuri & Pisa volunteers). - Oct. 15 < Nov. 15 Check new SW (GUI & XMon procedures) (D. Fabiani / C. Plager + Pisa & Fnal shifters) - Nov Review of the commissioning achievements with the CDF operations group. - Nov Dec. 31 Remote shifts (2/3 max.) w/o Fnal overlap with Pisa shifters - Jan 1 st,, 07  ….. Remote shifts in Pisa (max 1 per month) with any authorized shifter of all Italian Institutions.

09/06/2006F. Scuri - Remote CO shifts at CDF 10 Financial requests to complete the remote control room in Pisa Q.tyItemUnit cost (Euro) 1Good quality webcam and related SW 400 (echo suppression, Polycom ViaVideo ?) 3LCD (17/19”) goog quality monitors monitor drive card (Invdia Quadra ?) 200 ? 1Good performance desktop (2 GB Ram, 1500 fast processor, Exp. PCI bus,….) tot 3300