Alternate Fuel Program
34 million cases delivered to 24,000 customers yearly Over 2 million revenue miles on 300 heavy duty trucks Manhattan Beer Distributors covers:
Natural Gas Inlet High Pressure Injection Pump High Pressure Fuel Lines Ignition Control Module Fuel Injectors DIESEL ENGINE NATURAL GAS ENGINE
M ANHATTAN B EER D ISTRIBUTORS B RONX, N EW Y ORK First CNG Truck Delivered December, 2001 Station Opened April, 2002 15 vehicles completed by May, 2002 Second CNG program launched in Brooklyn 2005 after success with 1 st program An additional 15 vehicles repowered to CNG in Brooklyn plus our 2 nd CNG station 3 rd CNG program launched in Wyandanch 2006 with an additional 15 repowered trucks and our 3 rd CNG station Specifications International 4700 John Deere 6.8 liter, Natural Gas Engine 225 HP, 640 ft-lbs torque (4) Lincoln Composite Fuel Cylinders PSI Project Partners Manhattan Beer Distributors Bell Power Systems NYSERDA U.S. DOE NYC DOT
CNG Tanks Location
M ANHATTAN B EER D ISTRIBUTORS T RUCK W RAP D ESIGN
February 2002: First Compressed Natural Gas Truck
Improved Image
27 New Green tractors
First CNG Station located at headquarters
Second CNG Station located at Brooklyn, NY
Third CNG Station located at Wyandanch, NY
High cost of the CNG station maintenance Lack of public CNG stations Cost of new CNG vehicles CNG Barriers
A DVANTAGES OF C OMPRESSED N ATURAL G AS T RUCKS Effortless start up in cold weather conditions Require less warm up time Minimal engine sound No fuel delivery issues since station is directly piped from gas supplier
Does not require Emissions Technology Oil change intervals are at 25,000 miles; spark plugs at 50,000 miles Price efficiency: About 40% cheaper than diesel
Let the changes you want in this world begin with you.