Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Motor Leveling MECH 1200 Soft foot Condition: One or more of the mounting feet is not level with the others. Nuts loosen, vibration, misalignment Metal.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Target Status Report Lara Howlett University of Sheffield.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Angular momentum of the photon – experimental proposal J erzy Kosek, Poland 1.Introduction 2.Linear and angular momentum of the photon. 3.Measurement of.
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Status Update on Mechanical Prototype in Rome November 6,
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Rev 11.  Slides guide discussion  Inform about recent progress  Summarize make vs. buy options ◦ Aligning ◦ Labeling  Discuss next steps 
Engineering 1182 College of Engineering Engineering Education Innovation Center Missing Lines Section of Text.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Sketchup Tutorial Designing for Construction. The Parts of a Wall.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Precision Layout Unit 21.
Projectiles Horizontal Projection Horizontally: Vertically: Vertical acceleration g  9.8 To investigate the motion of a projectile, its horizontal and.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
HiRadMat Collimator Jaws HRMT23 03/07/2014EN/MME - E. Berthomé1.
H.TauregTechnical Forum June B and T monitoring News on B field mapping B field monitoring Temperature monitoring.
RICH WG: Introduction M.Lenti. Outlook PMs and sockets: what we have Vacuum vessel, no Neon purification Cost of aluminum disks (raw material) Cost of.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
M. Gilchriese Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, J. Wirth October 11, 2001.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
Lab tests on Mirror Support M.Lenti. Glass robustness Test if mirror glass is robust enough to be supported in a single point (single dowel approach)
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Test on mirror support prototypes M. Lenti. News from MARCON Shipping at CERN of all the mirrors: end of 2010 – beginning of dummy segments ordered.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
TEST MODULE WG Cradles for CLIC module supporting system
BSS Prep work at CERN and Acceptance of Parts
F.E.T.S. Mechanical Engineering Update
Development of a low material endplate for LP1 and ILD
Ongoing and to do work M.Lenti.
Report on construction of LP2 spaceframe endplate
G. Carboni for the Muon Group
IBL Wire Handling Concepts for Beampipe Support and Adjustment
1/10 prototype support tube
Dee1 View from back of back plate
Babyplast 6/10VP Vertical injection moulding machine.
CNGS horn / reflector in 2005: The story of the glass ring insulator
Réunion service Instrumentation Activités CMS-Traces
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Four Jaw Collimator.
Presentation transcript:

Leaf Spring prototype preparation M.Lenti

Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as counterbalance Two leaf springs (horizontal alignment); pretensioning in nominal “zero” position Piezo actuators out of particles acceptance 14/07/20102M.Lenti

Piet’s proposal 14/07/20103M.Lenti

Carassiti drawings Delivered on june 3 Original (Piet’s) approach: center of horizontal rotation “on” the mirror “inverted” approach: center of horizontal rotation “far” from the mirror Both taken in consideration 14/07/20104M.Lenti

Leaf spring Support 14/07/20105M.Lenti

Aluminum clamper 14/07/20106M.Lenti

Aluminium Dowel 14/07/20107M.Lenti

Aluminium Leaf 14/07/20108M.Lenti Thickness: 0.5 mm Height: 200 mm

Aluminium Support 14/07/20109M.Lenti

Dowel Aluminium Plate 14/07/201010M.Lenti

Piet’s correction June 17 14/07/201011M.Lenti

New drawing 14/07/2010M.Lenti12 F.Maletta Can be mounted in with the “original” or “inverted” approach

Prototype situation Aluminium raw material arrived last week (!!!) Executive drawings ready Mechanical worshop in Florence ready for working Hope to have the pieces machined by next week 14/07/201013M.Lenti

Resonances Estimated by Vito Glass: very low, just above 0 Hz Support structure: 1° resonance around 7.5 Hz 14/07/2010M.Lenti14

Conclusions A lot of time lost for material procurement Hope to have some results late in july… 14/07/2010M.Lenti15