ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.

Slides:



Advertisements
Similar presentations
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Advertisements

CAD Hans Johnson Build/Design Captain FRC 3018 Nordic Storm 2013 Lake Superior Excellence in Engineering Award ,000 Lakes Engineering Inspiration.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
Cookson & Zinn (PTL) Ltd Tank Base Frame Assembly.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Instruction Manual for inserting the CMS ZDCs using the crane.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
CMS ZDC Remote Exchange Crane Paul Debbins University of Iowa June 26, 2008.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Stabilization of Focus at ATF2 David Urner University of Oxford.
H. Matis, M. Placidi, A. Ratti, W. Turner [+ several students including S. Hedges] (LBNL) E. Bravin (CERN), R. Miyamoto (BNL – now at ESSS) H. Matis -
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Transport & Handling of Detectors TAN Workshop S. Prodon –
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
ZDC CRANE PROJECT Y. Onel September 28, Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The integration of 420 m detectors into the LHC
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Constraints Space Load Capacity Costs Operating hours.
CLIC Handling Engineering Update
LBNF CAD models, Drawings and Component list
MICE Partial Return Yoke Mechanical Design
INSTALLATION SEQUENCE
Design of the He and HB ODU
BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
Presentation transcript:

ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa

Model Crane Installed on (-) TAN Crane installation and testing underground at Pt5 - Provided a method to validate all geometric considerations - Provided practice in assembly and handling of system underground * Generate a sequence of assembly/operation steps with associated times and positions for CERN Transport and RadioProtection groups. Crane in Standby condition, parking position when not in use

Position shown is past full movement Crane in stages of operational movement, with Attached representative payload Payload

Hard Clearances Vertical to ceiling services R(-) L(+) Min. Payload - TAN (transport side) Min. Actuator – TAN (QRL side) Actuator spindle protection tube clearance to tunnel wall services – plenty, incl. anti-runout device extra length of tube. No collision with QRL platform. No collisons to hard artifacts of Tunnel and TAN. Measured clearances in excellent agreement with Virtual Models – confidence in the manual survey and its translation in to CAD L(+) side vertical clearance was most critical. Model validates several cm available space to expand vertical clearances in system – esp. min vertical space to BRAN

Soft Clearances 1.Interference with rotary jack interconnect input drive axle. Discussed with E. Bravin. Simple to move gas hose. 2.No interference of crane with cable trays on either side. 3.ZDC cabling is to be re-done, to use single multi-contact connectors for all signals, HV, and Laser. This substantially reduces the time spent (un)cabling during operations (ALARA). Eliminates the good probability of mis-cabling, and reroutes the cables into clean pathways clear of crane and human movements in the area. 1 Rotary Jack input drive coupling axle

BRAN Vert. Clearance Vertical clearance to BRAN: crane carrier beam Fully raised, 625mm clearance, 615mm vertical Carrier travel to lowest pos + 10mm clearance Above beam => “0” clearance to BRAN survey ball Model testing allows to provide for 20mm additional Clearance. Crane Design modified to provide Additional BRAN overhead clearance. Survey balls are removable and also provide Useful fixation points for attachment to crane for BRAN lifting. Discussed this option with E. Bravin BRAN survey points BRAN group must provide engineering to design and implement a fixture attaching the BRAN to the crane for BRAN removal. This is NOT a Univ. of Iowa responsibility. BRAN mounting in slot is also in need of remedy – BRANS are placed in different locations in the slot. 1 BRAN is keyed into Locating holes in TAN, the other is ‘free – floating’. Both units need to be keyed at consistent locations, with proper clearances To adjacent elements (ZDC) when mounted in TAN

Crane Model Testing > Allows final commitment to geometry With increased Vertical Clearances Some Structure Design modifications – DONE Modified designs sent to welding fabricators for Comments/mods to suit their best practices - DONE Final Geometry allows exact commitment To actuator specifications - Actuator specs sent to supplier to generate a current order then Referred to KU and ordered. ~ 1 week Crane Production Readiness Crane model ported to Simulation / Analysis environment To allow Force determination and FEA analysis of complete model 50% complete Generate Mechanical Study of Safety Order Steel Structure Fabrication ~ 2 Weeks

Additional preparation for testing Sarcophagus Design - DONE - Need to send to KU for production - 1 Sarco needed for testing Construction of Testing Platform Where? Pt5? Pawel, CMS TC How ? Design concepts exist -Need to discuss and refine “BARS” payload (S.Steel abosrber) - Design DONE - Send to A.L Perrot for referral to CERN shops for fabrication Above Ground Testing of System - Begin July 2011 Payload Sarco Platform Crane