CE 515 Railroad Engineering

Slides:



Advertisements
Similar presentations
Create a Detailed CTC Machine Model with JMRI/PanelPro
Advertisements

CE 515 Railroad Engineering Capacity Source: REES Module 6 & An Enhanced Parametric Railway Capacity Evaluation Tool
1 Track and Time to a Train Field Presentation 2 The following presentation is an example of Track and Time Authority to a Train. You will need a blank.
Chapter 12 Freeway Driving.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
MIXED TRAFFIC OPERATION MIXED TRAFFIC OPERATION
CE 515 Railroad Engineering
The Essentials of Train Operation Methods of Control- OCS and CTC
CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Locomotive Horn Rule Regulations
Advance Preemption Costs More than Simultaneous Preemption: Fact or Fiction?
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
CE 515x Train Acceleration, Deceleration, and Impact on Capacity Initial Instructions Work in teams of 2 - Get a new team mate (i.e., one who is not your.
©David F. Thurston, 2012, All rights reserved Capacity Implications of PTC now and in the Future David Thurston, Ph.D., P.E., FIRSE Vice President – Rail.
Conductor Decertification Discipline
Lecture #10 Chapter 15: Intersection Control. Objective 1.Hierarchy of Intersection Control 2.Assessing Basic Rules-of-the-Road 3.Assessing Need for Signalization.
CE 353 Lab 7: Rail Design Part 1: Train Acceleration, deceleration, and impact on Capacity Part 2: Design of a hump yard / classification facility Initial.
Slide 1 ILLINOIS - RailTEC Capacity of Single-Track Railway Lines with Short Sidings to Support Operation of Long Freight Trains Ivan Atanassov, C. Tyler.
CPN'09, Aarhus, Denmark, October 19-21, 2009 Verification of Railway Interlocking Tables using Coloured Petri Nets * Somsak Vanit-Anunchai
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
CE 515 Railroad Engineering Communications & Signals Source: Armstrong Ch 7, AREMA Ch. 7 “Transportation exists to conquer space and time -”
COPYRIGHT © AREMA : 1 of 21 Module 2: Train Operations.
1 Satisfiability Testing in the Railway Industry Simon Chadwick Head of Research Westinghouse Rail Systems Limited, Chippenham, UK SAT2009 Twelfth International.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
Slide 1 School of Engineering and Applied Science Center of Rail Safety-Critical Excellence Center of Rail Safety-Critical Excellence BRIEFING September.
ARRC Collision Avoidance System
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
Asst. Prof. Dr. Mongkut Piantanakulchai
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
Office of Railroad, Pipeline & Hazardous Materials Investigations Collision Between Two BNSF Railway Company Freight Trains Near Gunter, Texas May 19,
Operations Railroad Communica- tions Hazmat & Safety Personnel.
Dispatching Operations Department of Transportation Project DISPATCHERS.
Drive Right Chapter 7 Negotiating Intersections Unit 4
Sponsored by William W. Hay Railroad Engineering Seminar “ Canadian Rail Traffic Control Fundamentals ” Sean Robitaille Transportation Engineer CN Date.
C B T M Communications Based Train Management
Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Michigan Tech. University Michigan Tech. University PhD Candidate.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
October 2007 IRSC, Goa (India) 1 Lessons from an accident Marion Segretain, French National Safety Authority (EPSF)
Create a Detailed CTC Machine Model with JMRI/PanelPro Other Clinics in this series: Introduction to Layout Control with JMRI/PanelPro Repeated 4:00 PM,
ROLE OF SIGNALLING IN RAILWAYS
Highway Types I. Clarification of some terminologies 1.高速公路、高等级公路、高级路面
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
CONSOLIDATION OF RAILROADS What is Consolidation? What is Consolidation? Bringing several in to one. Bringing several in to one. Consolidation leads to.
p-REES 2: Module 2-B Advanced Train Operations PTC and CBTC
© American Public Transportation Association Advanced Train Operation PTC and CBTC.
Office of Railroad, Pipeline & Hazardous Materials Investigations DCA-08-MR-003 Collision of Amtrak Train 371 and Norfolk Southern Railway Company Freight.
Authors Marshall Burgess, Everett Perry, and Kyle Weatherholt West Virginia Department of Transportation Progress of the Railroad Crossings Project at.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
49 CFR PART 240 Qualification and Certification of Locomotive Engineers.
CE2303 Railway Engineering
Hazmat HM-246 Enhancing Railroad Tank Car Safety William S. Schoonover Chief, Hazardous Materials Division Federal Railroad Administration Presentation.
Positive Train Control Implementation of the Rail Safety Improvement Act Mandate: Elements of an Agreement?
H IGHWAY Pavement Structure  Sub grade: is usually the natural material located along the horizontal alignment of pavement and serves as the foundation.
MBTA/MassDOT RAILROAD QUIET ZONES
Positive Train Control
Permanent Way.
Public Conference December
Signaling and Safety Devices
Cambrian Lessons Learnt
ODOT Railroad Access & Safety
Layout Design For Signaling
University of Colorado A Line and B Line Grade Crossing Update
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Whistle and Horn Semaphore and Signal Lights
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Presentation transcript:

CE 515 Railroad Engineering Operations of Railways “Transportation exists to conquer space and time -”

Safety FRA responsible for safety Safety never deregulated All accidents reported Safety and Loss Control Department

Tracks Main tracks: governed by one or more methods of control. Should not be occupied without permission or authority Other than main tracks: occupancy without authority, the locomotive engineer should look for other movements, usually max 20mph

Speed Higher speed: improve capacity and productivity but also risk and maintenance cost Separate speed according to the type of train Temporary Speed Restrictions (TSR) and Permanent Speed Restrictions (PSR)

Rail Traffic Control Systems Track Warrant Control (TWC) Direct Traffic Control (DTC) Automatic Block Signal (ABS) Centralized Traffic Control (CTC)

Rail Traffic Control Systems TWC, DTC: Non-signalized systems Use radio communication and computers Rail Traffic Controller (RTC): order transferred by radio and written by crew

Automatic Block Signal (ABS) Series of consecutive blocks governed by block signals, cab signals, or both. Signals activated by a train moving through the block, or by certain conditions that affect the block use. Developed in 1872, Dr. William Robinson Divide “tracks” into blocks, only one train per block Directional operations, two or more tracks Designated current of traffic, low-density single tracks

Automatic Block Signal (ABS) Track circuit Fail-safe design Length of block: equal to longest normal stopping distance “Two-block, three-indication”, “Three-block, four-indication” Remained ABS systems: operated by TWC rules

Automatic Block Signal (ABS) http://www.youtube.com/watch?v=U8yGNKH2t3g

Centralized Traffic Control (CTC) Track territories, double track sections: crossing over is allowed. Rail Traffic Control Center: all track circuits connected, controlled together Panel: showing position of each train

Centralized Traffic Control (CTC) http://mysite.du.edu/~jcalvert/railway/ctc.htm

Centralized Traffic Control (CTC)

Centralized Traffic Control (CTC) Authority to enter a CTC main track: by signal. Crew requests for permission by radio Opposing movements: not allowed, only following train movements “Intermediate signals”: facilitate fleeting of trains

Centralized Traffic Control (CTC) Single track: 70% of capacity of double track with ABS Railways: shift to CTC: excess capacity

Questions?