Www.pol.ac.uk Installation and Setting Up of GLOSS OTT Radar Tide Gauges with DCP Telemetry for ODINAFRICA and Future Developments Peter Foden and Jeff.

Slides:



Advertisements
Similar presentations
DS-01 Disaster Risk Reduction and Early Warning Definition
Advertisements

Water Purification with Complete Remote Monitoring System.
C&L Sales & Services P/L
ZipLink™ Wireless Phone Line & Ethernet Extender
HARPER CHALICE GROUP LIMITED Leading manufacturers and suppliers of Electronic and Electrified “Perimeter Intrusion Detection systems” PulseSecure™ PROTECTOR.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
Video Remote Interpreting Services
ZipLink™ Wireless Phone Line & Ethernet Extender.
QoS Solutions Confidential 2010 NetQuality Analyzer and QPerf.
Finding That Elusive Pot of Gold or Networking Your Shelter Rebecca Peltzer & Jennifer Bradley, Polk County – Air Quality Steve Drevik, Agilaire.
Tide Gauges Philip L. Woodworth Permanent Service for Mean Sea Level.
COPAS B.V. ICT specialists for the Container Handling Industry Company profile (October 2004) Home base: Rotterdam, The Netherlands We travel all over.
The Logistic Requirements for Wave Field Measurement Prof. Dr.-Ing. Chia Chuen Kao Director, Coastal Ocean Monitoring Center, National Cheng Kung University.
DAKNET Presented By: rreema.
What is Influx InfoTech ?. About Influx InfoTech IT products & services company Delivering technology driven business solutions Hi-end infrastructure,
OTT “KALESTO” RADAR TIDE GAUGE
For Use in Industrial Vegetation Management Joseph Wilde The Pennsylvania State University.
AVT2000D is a portable and compact in size magnetic installation vehicle tracking device which is easy in mounting and hiding to where there is the metal.
Network Hardware for Expanding Network. Expanding Networks When do we need expansion:  Network cable is full of data movements  Printing tasks needs.
SCADA and Telemetry Presented By:.
InSeT System Inertial Sensor Tracking System Underground Mine Safety For Personnel Utilizing Inertial Sensors Technical Presentation.
Introduction to Information and Computer Science Networks Lecture a This material (Comp4_Unit7a) was developed by Oregon Health and Science University,
GITEWS German Involvement for a Tsunami Early Warning System Tide Gauges.
Net Optics Confidential and Proprietary Net Optics appTap Intelligent Access and Monitoring Architecture Solutions.
Washington SchoolSpeedTest Month Use the SchoolSpeedTest to Assess Internet Readiness For Digital Learning October 1―31 Thank you for joining us…the webinar.
10/22/03 CliniSense Corporation 1 The CliniSense LifeTrack™
Chapter 7 Connecting to the Internet. Connecting to the Internet FAQs: – What is the Internet? – What are the options for Internet service? – What is.
4N TELECOMMUNICATION. The solutions on offer are already being used by:  Vodafone New Zealand  Vodafone Portugal  Vodafone Spain  Telefónica and Orange.
TRIGGERFISH Glaucoma Monitoring System BME 181 Brittany M. Alphonse Biomedical Engineering.
X one. Mobile development platform We mobilize your process IP. ALARMS AUTOMOTION.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
What is Inequality in Broadband Internet Access? Nowadays everyone is going for a broadband service leaving behind the dialup modems services. There are.
Enabling Asset Security and Management NWO P Page 1 Network Overview July 2007.
Patent Update Presented by Ron Chapman. The SafeCell Patent An alternative approach to operating Cellphones in flight.
Tide corrections from KGPS and a precise geoid John Brozena, Randy Herr, Vicki Childers.
GLOSS Global Sea Level Observing System Bernie Kilonsky University of Hawaii (GLOSS Group of Experts) Thorkild Aarup Intergovernmental Oceanographic Commission.
Communication Systems The Internet The largest wide area network in the world. It is made up of thousands of linked networks. What.
Chapter 7 Connecting to the Internet. 2Practical PC 5 th Edition Chapter 7 Getting Started In this Chapter, you will learn: − What is the Internet − Options.
Radcom - New Products Dr. Gurch Chana Technical Director August 2006.
Ostende GLOSS course 2006 Suggested Method for Datum Determination for the Radar Gauges provided for ODINAFRICA and GLOSS-Africa P.L.Woodworth.
 Introduction – Consumer Market  Benefits – Operational Cost & Flexibility  Challenges – Quality of Service & Securing VOIP  Legal Issuers  Risk.
Components of wireless LAN & Its connection to the Internet
1 ARC reporting ARCCerny Verze INTERNET ARC events reporting Control panel 3. PSTN Telephone network - CID 1. GSM network – GPRS IP CID.
Component 4: Introduction to Information and Computer Science Unit 7: Networks & Networking Lecture 1 This material was developed by Oregon Health & Science.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES NOAA’s National Ocean Service Center for Operational Oceanographic Products and Services.
Technology Requirements for Online Testing Training Module Copyright © 2014 American Institutes for Research. All rights reserved.
Non-contact lever meter with integrated GSM/GPRS modem and data processing algorithms.
Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.
Terena Networking Conference, , Prague examine the performance and delay of 430 tsunami warning stations SEA LEVEL STATION MONITORING FACILITY.
NEAREST meeting Barcelona May 2008 NEAREST PROJECT CNRST Contribution to WP5 activities Birouk A. ING-CNRST National Center for Scientific and Technical.
ADCP’s in Action in Australia – 2015 Configuring ChannelMaster H-ADCPs for remote operation via dataloggers Richard Gardiner Senior Technical Officer Water.
Guidelines for Real Time GNSS Networks (RTN) Administration.
Network Hardware for Expanding Network
Luebeck, June 2011 Katrin Mett
Remote Data Communication Challenges
Providing Teleworker Services
Office of Electronic Communications (UKE)
Luebeck, June 2011 Katrin Mett
Important Reminder from Yesterday
Data Management Solutions for a Modernized HIS
Providing Teleworker Services
Module – Groundwater Level Measurement
InSeT System Inertial Sensor Tracking System
Design and Delivery of Gigabit Residential Services
Chapter 7 Connecting to the Internet
Sunnytek sensor networks
TEMPERATURE Logging Systems
Computer communications
REMOTE POWER MONITORING OF MARINE SITES
Providing Teleworker Services
Presentation transcript:

Installation and Setting Up of GLOSS OTT Radar Tide Gauges with DCP Telemetry for ODINAFRICA and Future Developments Peter Foden and Jeff Pugh UNESCO/IOC Oostende 2006

ODINAFRICA - Ocean Data and Information for Africa Current, In Progress and Proposed GLOSS Tide Gauges

OTT Tide Gauge – Kit of Parts

Main Sea Level Sensors – Radar and Pressure

ODINAFRICA - Meteosat DCP Tide Gauge

The Component Parts of the OTT Gauge

OTT Logosens2 – Data Logger

OTT DCP/HDR Transmitter - Connections

OTT Power Supply – PCU 12

Kalesto Radar Sensor Connections

Pressure Sensor - Cable Connections

Radar Sensor Support Arm Designs

Simplified Radar Support Arm Design

Pressure Sensor mounting support bracket example: - Needed to keep the Sensors in a stable and repeatable datum positions

The Proposed Tide Gauge Sites

Proposed OTT TG site – Karachi, Pakistan

Proposed TG site – Nouakchott, Mauritania

Tide Gauge Hut, Takoradi, Ghana – Proposed site for OTT Radar Gauge

Proposed OTT TG site – Port Sonara, Limbe, Cameroon

Proposed new OTT TG Site – Pointe Noire, Congo

Summary of TG Site requirements A weather proof tide gauge hut for electronics 24 hour security Electricity and if possible Telephone Tools for installation (I have a list) A mounting arm for the radar gauge Mountings for the pressure sensors (one below low tide and one at approximately MSL) A pole for antennas A simple stilling well for calibration checks Regular Dipper and Tide Staff Measurements…

Staff Gauges and Dippers – Regular Checks Available in 1 metre lengths that can be joined Plastic or metal, graduated in centimetres Dipper gives audio and visual indication of height from a reference point to Sea Level

Antenna Alignment and Data Checking

Antenna Pointing Utility – Eumetsat Website

DCP Data Checking and Download – Eumetsat Webpage

ODINAFRICA Telemetry issues Meteosat DCP is low cost and conforms to standards of Pacific TWS. Automatic data flow to GTS. Limited bandwidth, cannot report faster than every 15 minutes. The new minimum recommended data reporting rate is every 6 minutes. Alternative to DCP is required for tsunami monitoring and faster data delivery – BGAN Broadband and SMS

BGAN Terminals True Global Wi-Fi Data rate up to 492 kb/s Data messages by SMS or Internet

Liverpool BGAN Tide Gauge

BGAN Pricing – Standard Economy Rate BGAN Terminal$2800 Activation charge$35 Monthly subscription$49 IP Data rate/Mb$8.23 Static IP/Month$30 SMS per Message$ Mb/Month of data$120.15

Summary For the first time high speed, low-cost real- time data telemetry from remote areas is possible using BGAN, addressing the poor latency issues of earlier telemetry systems Number of technical issues for BGAN: Long term reliability, Up time, Latency of SMS messages and interfacing to the GTS Adoption of broadband will have implications for IT infrastructures. In particular the high volume of data produced, how to store it and keep it secure

Possible Tsunami Monitoring System using BGAN Data Telemetry and SMS

ODINAFRICA – Ocean Data and Information for Africa

New development - BGAN True global Wi-Fi Data rate of up to 492 kb/s Suitable for Tsunami monitoring Portable and will work outside UK