BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering Group Technical Annexes 1 and 2
Annex 1: General Requirements for Electrical Overhead and Gantry Cranes Annex 2: PLC Programming and Documentation Requirements March 20th 2014 Handling Engineering Group3
Annex 1 General requirements applicable both to new cranes and to new components for refurbishment works on existing cranes Some of the requirements are mandatory while others are applicable only when stated in the technical questionnaire Machine Directive 2006/42/EC and technical questionnaire have priority with respect to this document March 20th 2014 Handling Engineering Group4
Annex 1 March 20th 2014 Handling Engineering Group5
Annex 1 March 20th 2014 Handling Engineering Group6
Annex 1 March 20th 2014 Handling Engineering Group7
Annex 1 March 20th 2014 Handling Engineering Group8
Annex 1 March 20th 2014 Handling Engineering Group9
Annex 1 March 20th 2014 Handling Engineering Group10
Annex 1 March 20th 2014 Handling Engineering Group11
Annex 1 March 20th 2014 Handling Engineering Group12
Annex 1 March 20th 2014 Handling Engineering Group13
Annex 1 March 20th 2014 Handling Engineering Group14
Annex 2 Covers the following aspects of PLC programming: Design requirements Interface with users Software protection Documentation March 20th 2014 Handling Engineering Group15
Annex 2 March 20th 2014 Handling Engineering Group16
Annex 2 March 20th 2014 Handling Engineering Group17
Annex 2 March 20th 2014 Handling Engineering Group18
Annex 2 March 20th 2014 Handling Engineering Group19
Annex 2 March 20th 2014 Handling Engineering Group20