Innovative Internship Ideas that WORK!!!

Slides:



Advertisements
Similar presentations
<<Date>>
Advertisements

Understanding Basic Components:
SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC.
East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Forms during arrival Application Application ( both sides), behavioral contract and letter- please review with your child at home and send it in by the.
Chapter 1 The Design Process.
Civil Engineering & Architecture 2.3 Residential Design.
Project Title Livingston High School Department of Technology Education Innovation, Education and Design for the Future Team Members: Technology and Design.
HR, Staffing and Payroll Solutions Buenaventura Consulting Pvt. Ltd. 1 Where problem meets with its Solution.
Commercial Building Project Portfolio
Presented by: Norm Delay Manhattan Area Technical College Manhattan, Kansas Presentation materials may be found online at: smokyhill.org/vnews/display.v/art/4c87b3ca37004.
Reducing maintenance expense while improving patient safety by predicting electrical system failures University of Pittsburgh Medical Center Pittsburgh,
S.T.E.M Academy Pequannock Township High School. Preparing Students for Their Future “5 fastest growing jobs” 3 of the 5 are in medical career related.
Habitat For Humanity. HFH Members è Architectural Team ç Bill Cox ç Brian Vosberg ç Rosann Magnifico ç John Peugeot è Web Information Team ç Asli Kumcu.
Blue Prints.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Capstone Design Project (CDP) Civil Engineering Department First Semester 1431/1432 H 10/14/20091 King Saud University, Civil Engineering Department.
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
Office of Career and Technical Education Technical Education Program Assessment Standard 14 – Students are involved in work-based learning experiences.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Teacher /Mentor Tips Lois Walton 1RM BEST 2012.
Five Year Vision Vision ….. Century High School is one of the premiere Science Technology Engineering Arts Math (STEAM) schools in the nation.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
By Rebecca White Career Development Coordinator.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
SCHOOL HEALTH SERVICES IMPROVEMENT PLAN Linda M. Kauffman RN District School Nurse Supervisor October 20, 2009.

DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Family Involvement Curriculum What is Project SEARCH & How can You be Involved? 1 © CCHMC 1/3/06.
Document Management System for Construction Industry From Crystal Infosystems & Services.
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
The Central Training Room  Each training room is different dependent on the needs of the population it will be servicing.
WELCOME TO THE Rebecca White – Co-Director Sharrell Howard – Co-Director Keri Wass– Advisory Board Chair Nancy Brightwell – Principal NAF Video.
Project title : Typical design of community college Supervisors: 1-Prof.Dr.abdulmohsion W. Dhowain 2-Dr. Mohammad Jamal AL Shannag 3-Dr. Ibrahim Hamouda.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Set background image for this slide to change picture. A range of photos are available in the graphics folder.
Transition- SSIP Cohort 1 Where we are & where we are going! Catawba County Schools presenting for February Northwest Region EC Directors Mtg.
Palisades Middle School: Fitness Center Board Presentation April 20, 2016.
New Haven, A City of Great Schools MOVING FROM COMPLIANCE TO COHERENCE IN EVALUATION AND DEVELOPMENT: THE IMPACT OF THE E3 PROGRAM NEW HAVEN PUBLIC SCHOOLS.
Secrets of choosing the right Janitorial Services Miami FL.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Session 1: Identifying Construction Drawings and Drawing Components.
Facilities Management
The art and science of designing and construction of buildings.
Upon completion of this module, you will be able to:
Design process.
Case Study: Collaborative Connected Workplace Environment- Cisco
How Completed Interiors Are Achieved: Designing & Building
Design V Prof. Jill Bouratoglou
Architecture, Civil Engineer, and Interior Designer
Construction Documents
Project Title Livingston High School
Architecture Pathway at NISD
Architecture Pathway at NISD
Commercial Building Project Portfolio
Project SEARCH Volusia County
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Commercial Construction Projects
Differentiated Supports in Special Education
Team member1 Team member2 Team member3 Team member4 Feb. **, 2009
Design process.
Career Pathways: Everything but the Kitchen Sink
CTE Administrative Internship Program January 18, 2008
1.03 Career Options.
STRATEGIC PLAN UPDATE Board of Education May 2018
Presentation transcript:

Innovative Internship Ideas that WORK!!! Mallard Creek High School Academy of Engineering Co-Directors Rebecca White Sharrell Howard

NAF Standard Standard 4.2 Work-Based Learning Internship Completion The academy develops and sustains a program of compensated internships for all students.

Our Internship Road-Blocks Age/Liability – Students were too Young and not able to work in the places that would be part of our Academy Theme. Economy/Wages – Our economy is suffering and people are not able to find jobs and companies are not willing to provide paid internships for High School Students. What to do? NAF Gold Standard's Virtual Enterprise

Using Our Resources Using the Virtual Enterprise Concept from NAF AOE Board Members (To Assist Students): Black and Veatch – Engineering Firm Teacher – Owns Architectural Design Firm Parent – Civil Engineer/ Surveyor CMS CTE Central Office – Provided Wages for Teacher to supervise Model Internship after the CEA Capstone Project Funding from Grants

Internship Process Step 1: Advisory Board met to Create Internship Tasks, Deliverables, and Timeline. Step 2: Funding was acquired through grants to compensate students. (Best Buy Gift Cards) Step 3: Students Applied and Interviewed for Positions Interview was conducted by Black and Veatch Human Resources and Advisory Board Members. Step 4: Students Groups were set based on interview, application package, and skills. Step 5: Executed the Internship Simulation Step 6: De-Brief and Evaluate the Internship

MCHS Internship Simulation 2012 Problem Statement: The field house at Mallard Creek High School was poorly designed and does not meet the needs of the Athletic Department. Design Statement: Design a New field house that will meet the needs of the athletic department at Mallard Creek High School. Building Program Large Open area 2 Locker Rooms with Shower & Restrooms Referee Room with Showers & Restrooms (Accommodate 6 Officials) Storage 2 Coaches Offices with Shower & Restroom Athletic Trainers Office with Shower & Restroom Training room (Medical Room) Utility Room Electrical Room Water Service room White Board in Common Area for Team Meetings

MCHS Internship Simulation 2012 Some of the Project Portfolio Components Calculations: Water Supply Calculation Water Run-OFF Calculation (Site) Heat Loss Calculation (1 Wall) Drawing Sheets: T-1 Title Page W/ Rendering T-2 Code information C-1.0 Site Plan/ Landscape plan A-1.0 Floor Plan A-2.0 Reflected Ceiling Plan A3.0 Roof Plan A4.0 4 Elevations A5.0 Building Section E1.0 Electrical Plan P1.0 Plumbing Plan   Code information: Applicable Codes Occupancy Type of Construction Max Building Size: Max area, Max number of stories Egress Requirements Preliminary Design: Client Survey/ Meeting Notes Building Program Bubble Diagrams Floor Plan Sketch Inspirational Pictures Site information: Site Selection (Address/Location) Picture of Original site/parking/egress

MCHS Internship Simulation 2012 Schedule Day 3 Hours: 8am – 5pm 8:00-8:30 Staff Meeting Deliverables for 4PM Day 3: Revisions from Meeting on Day 2 RCP Roof Plans Building Section Electrical Plan Plumbing Plan B&V Supervisor Meeting 4pm-5pm Day 4 Hours: 8am – 4pm 8:00-8:30 Staff meeting Deliverables for 12PM Day 4: Everything! Presentations Begin at Noon   Day 1 Hours: 8am – 4pm 8:00-9:00 STAFF MEETING Deliverables for 8AM Day 2: Code Information Preliminary Design Site Information 3:30 Staff Meeting Day 2 Hours: 8am – 5pm 8:00 -8:30 Staff Meeting Deliverables for 4PM Day 2: Floor Plans Elevations Site Plan B&V supervisor Meeting 4pm-5pm

SIS 2012 Highlights

MCHS Internship Simulation 2013 Problem Statement: A local Nursing Home is in need of an elevator that will allow them to expand their center to include Three Floors for Residents and support staff. Design Statement: Your team must design the control system and a prototype of an elevator that can go between three floors in any combination. The prototype must include a set of three switches to represent each floor of the elevator. Each floor the elevator stops at must have a call button and a set of three lights to indicate where the elevator is currently located. A built-in safety mechanism requires that the elevator normally rest on the ground floor and return to the ground floor after a user-determined period of nonuse.

MCHS Internship Simulation 2013 Expectations/Deliverables: Use the 12 Step Design Process Determine Best Placement of Elevator(s) on the Floor Plan Design how the Elevator will look, aesthetically, using AutoDesk Inventor Build the Prototype using the Vex Robotics Equipment Program the Prototype using EasyC Cortex Create a Portfolio with complete documentation Present Results to AOE Advisory Board Convince the Board to Fund your Project!!!!   The Elevator needs to meet the needs of the nursing home including but not limited to: Moving Residents and their personal belongings from Floor to Floor Handicap Accessibility Emergency Stretcher Accommodations Dual Side Access Located in Central Area

SIS Highlights 2013

Your Challenge Task: To Create an Internship Simulation that can be implemented at your school for your academy students. Use Your “Internship Simulation Creation Tool” Step 1: Creating Internship Tasks/Deliverables/Timeline: What do you want your students to be able to achieve and produce by the end of the internship? How many students can you accommodate? How long will your internship last?  Where will you hold the internship?  Who will be your “client” or judge of the deliverables?  Who will facilitate the students?

Your Challenge Step 2: Funding What are some possible resources for compensating the students? (please be specific ex: carwash fundraiser, NACME grant, donations) How will you compensate your lead instructor/facilitator?   Step 3: Application and Interview Who from your board can conduct the interviews? (be specific when naming your resource) What will your application packet include?  Step 4: Student Grouping How will you evaluate the students to figure out which students should work together to complete the internship tasks?

Your Challenge Step 5: Execute the Internship Simulation. Imagine planning an internship for a week. What are some tasks and outcomes for Each Day(1-5)?   Step 6: De-Brief and Evaluate What could be some possible roadblocks that you may face from your administration? School? Or District? How will you evaluate the student’s performance? (rubric, voting) Once the internship is over, how will your team debrief and evaluate the summer internship?  

Co-Directors of MCHS AOE Rebecca White Sharrell Howard Mallard Creek High School Academy of Engineering Charlotte, NC Rebecca.white@cms.k12.nc.us Sharrelll.howard@cms.k12.nc.us