Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
Monitoring and Information Systems
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
PROJECT PERFORMANCE AND EVALUATION Year 3 Project Management Dr. Margaret Nelson.
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Degree and Graduation Seminar Cost Management
Monitoring and Controlling
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Project Evaluation and Control
Phase III: Execution Phase IV: Monitoring and Control Earned Value Analysis Burns: Chapter 8: pages Burns: Chapter 12: the entire chapter Schwalbe:
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Project Evaluation and Control
Project Evaluation and Control
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
9-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 9 Progress and Performance.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Project Cost Management
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
Copyright 2012 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Copyright 2009 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Project Management 6e..
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Copyright 2015 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P , Chapter 13 Process and performance Measurement and Evaluation, Project Management.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Cost Management
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
Monitoring and Information Systems
“PMP® Exam Prep” Earned Value Management
Project evaluation and control
5. Cost resources & PLAN DURATION
Project Cost Management
Progress and Performance Measurement and Evaluation
Earned Value Management
Project Management 9. Performance Management
Earned Value Measures Planned Value (PV) Earned Value (EV)
Project Evaluation and Control
5. Cost resources & PLAN DURATION
Monitoring and Information Systems
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
5. Project PLAN & cost estimation
Project Cost Management
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Monitoring and Controlling
Managing Project Work, Scope, Schedules, and Cost
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin

13–2 Where We Are Now

13–3 Structure of a Project Monitoring Information System Creating a project monitoring system involves determining: –What data to collect –How, when, and who will collect the data –How to analyze the data –How to report current progress to management

13–4 Project Monitoring Information System Information System Structure –What data are collected? Current status of project (schedule and cost) Remaining cost to compete project Date that project will be complete Potential problems to be addressed now Out-of-control activities requiring intervention Cost and/or schedule overruns and the reasons for them Forecast of overruns at time of project completion

13–5 Project Monitoring System… (cont’d) Information System Structure (cont’d) –Collecting data and analysis Who will collect project data? How will data be collected? When will the data be collected? Who will compile and analyze the data? –Reports and reporting Who will receive the reports? How will the reports be transmitted? When will the reports be distributed?

13–6 The Project Control Process Control –The process of comparing actual performance against plan to identify deviations, evaluate courses of action, and take appropriate corrective action. Project Control Steps 1.Setting a baseline plan. 2.Measuring progress and performance. 3.Comparing plan against actual. 4.Taking action. Tools –Tracking and baseline Gantt charts –Control charts

13–7 Developing an Integrated Cost/Schedule System 1.Define the work using a WBS. a.Scope b.Work packages c.Deliverables d.Organization units e.Resources f.Budgets 2.Develop work and resource schedules. a.Schedule resources to activities b.Time-phase work packages into a network 3.Develop a time-phased budget using work packages included in an activity. Accumulate budgets (PV). 4.At the work package level, collect the actual costs for the work performed (AC). Multiply percent complete times original budget (EV).` 5.Compute the schedule variance (EV-PV) and the cost variance (EV-AC).

13–8 Development of Project Baselines Purposes of a Baseline (PV) –An anchor point for measuring performance A planned cost and expected schedule against which actual cost and schedule are measured. A basis for cash flows and awarding progress payments. A summation of time-phased budgets (cost accounts as summed work packages) along a project timeline. What Costs Are Included in Baselines? –Labor, equipment, materials, project direct overhead costs (DOC)

13–9 Development of Project Baselines (cont’d) Rules for Placing Costs in Baselines –Costs are placed exactly as they are expected to be “earned” in order to track them to their point of origin. –Percent Complete Rule Costs are periodically assigned to a baseline as units of work are completed over the duration of a work package.

13–10 Methods of Variance Analysis Comparing Earned Value –With the expected schedule value. –With the actual costs. Assessing Status of a Project –Required data elements Data Budgeted cost of the work scheduled (PV) Budgeted cost of the work completed (EV) Actual cost of the work completed (AC) –Calculate schedule and cost variances A positive variance indicates a desirable condition, while a negative variance suggests problems or changes that have taken place.

13–11 Developing A Status Report: A Hypothetical Example Assumptions –Each cost account has only one work package, and each cost account will be represented as an activity on the network. –The project network early start times will serve as the basis for assigning the baseline values. –From the moment work an activity begins, some actual costs will be incurred each period until the activity is completed.

13–12 Indexes to Monitor Progress Performance Indexes –Cost Performance Index ( CPI ) Measures the cost efficiency of work accomplished to date. CPI = EV/AC –Scheduling Performance Index ( SPI ) Measures scheduling efficiency SPI = EV/PV –Percent Complete Indexes Indicates how much of the work accomplished represents of the total budgeted (BAC) and actual (AC) dollars to date. PCIB = EV/BAC PCIC = AC/EAC

13–13 Additional Earned Value Rules Rules applied to short-duration activities and/or small-cost activities –0/100 percent rule Assumes 100 % of budget credit is earned at once and only when the work is completed. –50/50 rule Allows for 50% of the value of the work package budget to be earned when it is started and 50% to be earned when the package is completed. –Percent complete with weighted monitoring gates Uses subjective estimated percent complete in combination with hard, tangible monitoring points.

13–14 Forecasting Final Project Cost Methods used to revise estimates of future project costs: –EAC re Allows experts in the field to change original baseline durations and costs because new information tells them the original estimates are not accurate. –EAC f Uses actual costs-to-date plus an efficiency index to project final costs in large projects where the original budget is unreliable.

13–15 Key Terms Baseline budget Control chart Cost performance index (CPI) Cost variance (CV) Earned value (EV) Estimated Cost at Completion—Forecasted (EAC f ) Estimated Cost at Completion—Revised Estimates (EAC re ) Percent complete index—budget costs (PCIB) Percent complete index—actual costs (PCIC) Schedule performance index (SPI) Schedule variance (SV) Scope creep To complete performance index (TCPI) Tracking Gantt chart Variance at completion (VAC)